Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-11-18 Carlson Testing, Inc. t2- Bend Office Geotechnical Office Eugene Office Salem Office Tigard Office (541) 330-9155 (503) 601-8250 (541) 345-0289 . (503) 589-1252 (503) 684-3460 Daily Report of Proprietary Anchors Client: DATA SPECIALTIES INC - VERN KOOPS Project: DATA CENTER EXPANSION Address: 123 INTERNATIONAL WAY - SPRINGFIELD, OR Jurisdiction: CTI representative S. FOX OBOA 177 was on site this date Nov. 18, 2009 to perform Special Inspection for: Permit COM 2009-01260 Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: CONTR-~CTOR INSTP.LLED APPROXIMATELY 1204 \ 1/4" X 2 1/4" KB-3 ANCHORS INTO CONCRETE FLOOR SLAB OF UPS ROOM B P.ND 130\ 1/4" X 2 1/4" KB-3 ANCHORS INTO FLOOR SLAB OF UPS ROOM A, FOR RAISED FLOOR PEDESTALS. ALL CONFORM TO SHEET *5 OF KPFF DRAWING DATED 8/14/09 FOR PROJECT 209335 AND ICC REPORT #ESR-2302 RECUIRED MINIMUM TORQUE - VesNoN/A 4 FT/LES DFS #(s) SCOPE OF INSPECTION 1, Checked in with superintendent or client representative. Name: VERN Company: DATA SPECIALTIES 2. Inspection was "\Be" GJ Continuous o Periodic PROPRIETARY ANCHORS 1. Reviewed previous inspection reports? 2. Reviewed evaluation report? I ~ I I Verified following items meet manufacturer's published installation instructions, 3. Verified minimum embedment depth of the anchors. 4.Verified installation of the anchors. 5. Verified anchor diameter. 6. Verified steel grade. 7. Verified hole diameter. 8. Verified type of drill bit used.' I 9. Verified hole cleaning method. 11.0. Verified adhesive application. I L Verified edge distance. 12. Verified spacing; 13. Verified installation torque. X X X X X X X X X Evaluation report number & date: ICC ESR 2302 12/01/08 Name of product being installed HILTI KB-3 Batch Number 0011281280 Expiration Date CTI Job #: E0901042. SPRINGFIELD PO Number: REPORT SUMMARY 1. Work inspected was: GJ Completed 0 In progress 2. Completed work inspected was in compliance with o Approved plans and specifications 0 Shop drawings o RFI 0 Design change [iJ Submittal 0 N/A Document #(s) 209335 Dated: 8/14/09 x X 3. Noncompliance item(s) were noted this date, details on following page(s). 0 Ves 0 No GJ N/A 4. Noncompliance item(s) were reinspected this date, details on following page(s), 0 Ves 0 No GJ N/A o Conform D Remain in progress Report(s) findings were discussed and left with VERN of DATA SPECIALTIES Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. o See additional report page(s), o Distribute attachments. Page _of _ Carlson Testing, Inc. '?t- Bend Office Geotechnical Office Eugene Office Salem Office Tigard Office (541) 330-9155 (503) 601-8250 (541) 345-0289 (503) 589-1252 (503) 684-3460 Daily Report of Proprietary Anchors Client: DATA SPECIALTIES INC - VERN KOOPS Project: DATA CENTER EXPANSION Address: 123 INTERNATIONAL WAY - SPRINGFIELD, OR Jurisdiction: CTI representative S. FOX OBOA 177 was on site this date Nav. 20, 2009 to perform Special Inspection for: Permit COM 2009-01260 DFS #(s) SCOPE OF INSPECTION 1. Checked in with superintendent or client representative. Name: VERN Company: DATA SPECIALTIES 2. Inspection was "IBe" GJ Continuous D Periodic PROPRIETARY ANCHORS Yes NaNIA 1. Reviewed previous inspection reports? 2. Reviewed evaluation report? I ~ I I I Verified followine: items meet manufacturer's published installation instructions. I I I I I I I I I II. Verified edge distance. f 12. Verified spacing. 13. Verified installation torque. 3. Verified minimum embedment depth of the anchors. - 4.Verified installation of the anchors. 5. Verified anchor diameter. 6. Verified steel grade. 7. Verified hole diameter. 8. Verified type of drill bit used. 9. Verified hole cleaning method. 10. Verified adhesive application. X X x X X X X X X Evaluation report number & date: 2302, 1917 12/1/08,9/1/07 Name of product being installed HILTI KB-3.KB-TZ Batch Number 0011281280 0011242025 Expiration Date CTI Job #: E0901042. SPRINGFIELD PO Number: Location of proprietary anchors inspected [to include grid lines. elevations (floors) and drawing details): CONTRACTOR INSTALLED 112611/4"X 2 1/4" KB-3 ANCHORS INTO FLOOR SLAB IN ROOM UPS A, AND 11441 1/4"X 2 1/4" KB-3 ANCHORS INTO FLOOR SLAB IN DATA r.F,NTF:R ROOM FOR RAISF:D FLOOR PEDF:STALS PER KPFF DETAIL SHEET #5 DATED 8/14/09, WITH TOROUE OF 4 FTILBS, ALSO 141 3/8"X 5" 12 ANCHORS INTO ROOM UPS-A FLOOR FOR BATTERY CABINET STAND LEGS. PEDESTAL SHEET 3 BY KPFF WITH A TOROUE OF 25 FT ILBS REPORT SUMMARY I. Work inspected was: GJ Completed 0 In progress 2. Completed work inspected was in compliance with o Approved plans and specifications 0 Shop drawings o RFI 0 Design change GJ Submittal 0 N/A Document #(s) 209335 Dated: 8/14/09 x x 3, Noncompliance item(s) were noted this date. details on following page(s), 0 Yes 0 No GJ N/A 4. Noncompliance item(s) were reinspected this date, details on following page(s). DYes 0 No GJ N/A D Confonn D Remain in progress Report(s) findings were discussed and left with VERN of DATA SPECIALTIES Based on the Code, approval is required /Tom the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. D See additional report page(s), o Distribute attachme~ts. Page _of _