HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-11-9 (2) l ~~;lInformation ,.,~. .To Build On Engineering . Consulting. Testing tf( DAILY FIELD REPORT Date Performed: Client: November 9, 2009 Jamie Lockwood New Hope Builders 32724 Berlin Road Lebanon, OR 97355 Report Number: 722-90118-30 Project Name: FMC-DS of Springfield 304 Q Street Eugene, Oregon C1- ,?,'ir Field Cloudy with Rain Showers Project Location: Contractor: Fabricator: Type of Inspection: Epoxy Building Permit No,: Shopl Field: Weather: Field Observations and Comments Performed continuous inspection during the installatiOrl6f: 5/8" all thread epoxied anchor bolts in the following locations: Inspected the installation of 2 each 5/8" x 18" all thread bolts at each of the 3 internal shear walls, Verified holes to be 71," x 7 y,- in size, Epcon C6 Redhead epoxy was used in the installation, Prior to installation the predrilled holes were cleaned using a nylon brush and compressed air. Verified minimum embedment depth of 7 Y, inches, The above listed epoxy anchors were installed using Epcon C6 Redhead epoxy with ICC# 4285, Contractor stated the nuts would be tightened after the epoxy has cured, The epoxy anchors were installed in accordance with manufacturer's directions and latest revisions dated 05-01-09, Contractor was asked to notify our office when additional services are needed, To the best of our knowledge, the work inspected above was in accordance with the building department approved design grawinop, specifications, and aQpliGlIPJe Vfo[~mil.nship provisions of the International Buildino Codes, Inspedor: Glenn Meek Jr" rccf( 50715~1l-4g CBB #176269 If you have any questions regarding this report, please feel free to contact us at 541-746-9649, Respectfully Su 1J1~ts: I David Smith Branch Manager ries, Ine, cc: New Hope Builders - scott@newhopebuilders,com New Hope Builders - alton@newhopebuilders,com City of Springfield THIS REPORT IS PROVIDED FOR THE INFORMA rlON OF THE CUENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY. BY ANY MEANS, EXCEPT IN FULL, WfTHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROH/BtTED. Professional Service Industries. Inc.. 104Q-A Shelley Street. Springfield, OR 97477. Phone 541n46.9649. Fax 541n4~7163 l ns~;lInfonnation ,. · To Build On . .1" 'I .~.1IIet*Ig 1040 - A Shelley Street ~ Sprlngneld,O'egon 97477 FIELD DENSITY REPORT SOIL AND SOIL-AGGREGATE (541)746,9649 - (541)746-7163 f.. cca #176269 Client' Jamie Lockwood Address; New Hope Builders 32724 Berlin Road Lebanon, OR 97355 Project No" 722-90118-29 Project: FMC - OS of Springfield '). Project 304 Q Street C '1-154 r Location: Eugene, Oregon Equipment: Troxler: 3430 SN: 61109 Date Performed: P,Q,No,: B,P, No,: Technician: Anthony Deluca November 6, 2009 Laboratory Soil / Aggregate Data: Moisture Density Relationship of 126.8Ibs./cu.tt., at 13.7% moisture, was furnished by client, Delta S & G for 3/4"-0 T~99. Field Density Tests: Nuclear Method (ASTM 02922) 'ASTM D3017)(Standard Count: MS 688 OS 2865) 12 See site sketch Tests performed at finished grade of base rock at locations lisled above, Test results were verbally reported to Sue (DS&G), Additional Remarks: Test #13: FRG - 8" - 134,4 WD - 126,2 00 - 6,5% M - 99,5% C, Test No. Approximate Test location 1 See site sketch 2 See site sketch 3 See site sketch 4 See site sketch 5 See site sketch 6 See site sketch 7 See site sketch 8 See site sketch 9 See site sketch 10 See site sketch 11 See site sketch cc: New Hope Builders - scoll@newhopebuilders,com City of Springfield See Attached site map, Approximate Test Elev. FRG FRG FRG FRG FRG FRG FRG FRG FRG FRG FRG FRG Probe Wet Density Dry Density Depth lBS/CU.FT. lBS/CU.FT. Percent Percent Required Moisture Compacllon Compaction Comments -' I I I --I 8" 133,9 125,5 I 6,6 --- 8" 139,6 131.5 I 6,1 8" 134,0 125,9 6.4 8" 139,8 128,3 I 9,0 8" 132,1 124,5 6,1 - 8" 139,1 130,1 6,9 8" 139,9 131.6 6,3 8" 140,9 132,6 6,3 8" 139,2 130,5 6,7 8" 138,8 131.6 5,5 8" 132,3 125.4 5,6 8" 142,1 131,2 8,3 98,9 ~~ parkino lot 103,5 I 95'/n parkino lot Respectfully Submi led ~S:ion~i Industrie, Inc, ~~1" Branch Manager 99,0 95% oarkinQ lot 103,7 95% parkinQ lot 99,3 95% parkinQ lot 101,2 950/0 oarkinQ lot 98,2 ~% oarkina lot 102,6 ~% parking lot 103,8 ~% oarking lot 104,6 9p,!0 parkinQ lot 102,9 .9_"[!0 oarkinQ lot ~ 103,0 ~% oarkinQ lot NOV 2 5 1009 THIS REPORT IS PROVIDED FOR mE INFORMATION OF THE CUENTONLY. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED WFTHQUT THE\.1IRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. iacl- '16HB t:'M c- SJn~e-~ \l-{...-O'1 ?SJ> A,~.A- - T~ 1 ,N \ \- .; -0 ~ ( \ -0 - @ ~ @ @ - \ ~ t 1'-'\ C @ ~ bu q~ ['Vl ~ J @ L \ @ \ \ ~\d,,~ '0) @ ["''\'(i G) - .A @ (jj) 0 ----. 4. -It''''tt I - ----- Q s~,