[City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
LAND DIVISION PLAT
PRE-SUBMITTAL CHECKLIST
Partition
Project Name: Roy Lundblad Partition
Project Proposal: Create three parcels from parent parcel at 750 66th Street.
Case Number: PRE2009-00024
Project Address: 750 66TH Street, Springfield.
Assessors Map and Tax Lot Number(s): 17-02-34-13, TL 200
Zoning: Low Density Residential (LDR)
Overlay District(s): NjA
Applicable Refinement Plan: NjA
Refinement Plan Designation: NjA
Metro Plan Designation: Low Density Residential (LDR)
Tentative Decision Date: July 22, 2008
Pre-Submittal Meeting Date: September 4, 2009
Application Submittal Deadline: August 27, 2009
Associated Applications: SUB2008-00030
I POSITION
Proiect Planner
I
I
/ I Deputy Fire Marshal
I Community Services Manaqer
I REVIEW OF
Land Use Planninq
Transportation
Utilities, Sanitary & Storm
Sewer
Fire and Life Safety
I Buildinq
NAME
Mark Metzqer 726-3775
Jon Driscoll 726-3679
I Eric Walter 726-1'034
I Gilbert Gordon 726-2293
Dave Puent726-3668
rA1!eOlGA!Nq'~S~E~EI!Ge"oflENr1i!:R.EDEW~1i!EA!t/I_llIiiIlllJlI!"~~".~V.r~
. Owner Engineer'"
Roy Lundblad Jonathan Oakes
1444 Vera lane Poage Engineering andiSurveying
Springfield, OR 97477 P.O. Box 2527
Euqene, OR 97402 ,
Date Received:~~
Planner: MM fkq 1_ ~ (
9/4/2009
1 of 6
The items needed to make the application complete for review are incorporated below.
NOTE:
'. Conditions of Approval - taken from Notice of Decision dated: 7/22/2008
. Applicant Response - taken from: 8/27/2009
Condition #1: Street trees and/or on-site vegetation shall be placed or relocated as necessary
to maintain the required 10 foot vision clearance triangles at the corners of all site driveways per
SOC 4.2-130.
Applicant Response: Required street trees will be sited in accordance with SDC 4.2-130.
Staff Finding: Sqtisfied. The street tree requirement has been waived due to conflcit with SUB
water main and limited alternative sites.
Condition #2: Prior to final plat approval, execute and record the irrevocable joint use access
easement and maintenance agreement as proposed.
Applicant Response: A copy of the joint access easement and maintenance agreement has
been submitted with this application for approval by the Planner prior to being recorded
concurrently with the final plat.
Staff Finding: Satisfied.
Condition #3: Fire apparatus access driveways for Parcels 1 and 3 shall support an 80,000 lb.
imposed load across the entire 20 foot width as per the 2007 Springfield Fire Code 503.2.1,
503.2.3 and SFC Appendix 0102.1.
Applicant Response: The fire apparatus access driveways have been constructed to support an
80,000 Ib load over the full width of the access drive.
Staff Finding: Satisfied.
Condition #4: "No Parking-Fire Lane" signs shall be posted on both sides of the fire apparatus
access roads to Parcels 1 and 3 as per the 2007 SFC 503.3 and SFC Appei!dix 0103.6.
Applicant Response: The required signage is scheduled to be placed upon completion of the
final grading associated the fire apparatus access drives serving Parcell, Parcel 2, and Parcel 3
currently under construction. '
Staff Finding: Satisfied.
Condition #5: Prior to final plat approval, applicant shall revise plan drawings to provide
necessary cleanouts in accordance with Section 2.01.07 of the Engineering Oesign Standards
and Procedures Manual.
Applicant Response: A revised copy of the grading plan indicating installation of a c1eanout on
the sewer servic'e lateral serving more than two properties has been submitted with the final plat
application.
Staff Finding: Satisifed.
Condition #6: Prior to final plat approval, applicant shall ensure that the existing structure on
Parcel 2 is connected to sanitary sewer system.
Applicant Response: The existing structure located on Parcel 2 has been connected to the
public sewer as inspected and approved under Building permit No. 09-677.
Staff Finding: Satisfied.
9/4/2009 2 of 6
Condition #7: Prior to Final Plat approval, the applicant shall direct rooftop runoff from the
existing structure on Parcel 2 to an approved drywell as proposed in the plan set.
- . .
Applicant Response: Grade conditions permitted the roof runoff form the existing structure on
parcel 2 to be collected into a closed pipe system and directed to the existing curb and gutter
system in the 66th street cul-de-sac.
Staff Finding: Satisfied.
Condition #8: Prior to Final Plat approval, the applicant shall show proposed water service
connections, sizes and locations of water meters for each lot.
Applicant Response: Accompanying this final plat application is the grading plan submitted
with the tentative application which has been revised to show the location and size of the water
meters serving each parcel.
Staff Finding: Satisfied.
Heads Up Comments:
1.
9/4/2009
3of6
THIS APPLICATION IS:
t'ilI COMPLETE FOR PROCESSING .
o INCOMPLETE ND NEEDS MISSING INFORMATION NOTED ABOVE
{/o1'~q'
, Date' (
City Planner
,
THIS IS NOT A DECISION ON THE PLAT. The plat pre-submittal meeting shall be held within
one year of the date of the Land Division Tentative approval. A complete. Land Division Plat
application shall be submitted within 180 days of the pre-submittal meeting. If the applicant has
not submitted the Land Division Plat application within these time frames, the Land Division
Tentative approval shall become null and void and re-submittal of the Land Division Tentative
application shall be required per SDC 5.2-140.
I, the owner/applicant, intend to submit all missing items indicated herein to the City
within the lSD-day timeline. '
Owner/Applicant's Signature
Date
9/4/2009
40(,6
Land Division Plat Application Process (see next page for a diagram ofthis process)
1.. Applicant Submits a Land Division Plat Application for Pre-Subinittal
" "
. The application must conform to the Land Division Plat Pre-Submittal Requirements
Checklist on pages 5 & 6 of this application packet.
. The purpose of pre-submittal is to ensure the applicant has all items necessary for a
complete submittal.
. A pre-submittal meeting to discuss completeness is mandatory..
. Pre-submittal meetings are conducted every Tuesday and Friday, from 10:00am -
noon.
. We strive to conduct the pre-submittal meetings within five to seven working days of
receiving the application.
2. Applicant and the City Conduct the Pre-Submittal Meeting
. The applicant, owner, and design team are strongly encouraged to attend the pre-
submittal meeting.
. The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division. .
. The meeting is scheduled for 30 to 60 minutes.
. The Planner provides the applicant with a Pre-Submittal Checklist at the end of the
meeting specifying the items required to make the application complete if it is not
already complete.
. The applicant will then have 180 days to make the application c9mplete for submittal
. and acceptance by the City.
3. Applicant Submits a Complete Land Division Plat Application
. When the applicant has addressed all items on the Pre-Submittal Checklist and the
City Surveying Section has notified the applicant's surveyor that the plat and other
documents are sufficiently refined, the applicant can submit a complete application to
the City Survey Section located in the NW Quad of City Hall.
. The application must conform to the Land Division Plat SubmittJI Requirements
Checklist on page 6 of this application packet. .
. If the submittal is deemed complete, the City Survey Section will sign-off on the City
Survey approval sheet and send the applicant to the Development Services
Department for application submittal and fee collection.
. Planning staff checks and signs the mylars.
4. Applicant Records Plat at Lane County&. Submits Plat and Documents to City
. After Planning staff checks and signs the mylars, the plat may then be recorded by the
applicant's surveyor at Lane County. .
. After plat has been recorded at Lane County, applicant submits five (5) recorded,
. rolled paper copies of the plat and three (3) copies of required documents to the
DevelopmentServices Department prior to the issuance of build'ing permits.
. ,I
LAND DIVISION PLAT APPLICATION PROCESS
Applicant submits land division plat application for pre-submittal
(See Land Division Plat Pre-Submittal Requirements Checkli!!!t)
1
City departments review application for completeness and hold pre-submittal meeting to
discuss-completeness issues with applicant and applicant's representatives.
~~
Applicant addresses incomplete items. I
City Surveyor checks application and returns
comments to applicant's surveyor.
,
-
Applicant's surveyor corrects plat I .
I~
and returns to City Surveyor.
I-
City Surveyor cOQducts field check and
returns comments,to applicant's surveyor
~
/'
Applicant's surveyor sets new monuments
and flags existing ones.
1
Once no errors appear on the plat and a current title report is s'ubmitted,applicant's
surveyor is given ok to submit complete land division plat application.
'1
--.
After ok given from City Surveyor and applicant has addressed all incomplete items' from
pre-submittal, applicant submits complete application to the <!::ity Survey Section
(See Land Division Plat Submittal Requirements Checklist)
1
City Survey Section signs-off on City Survey approval sheet and sends the applicant to the
Development Services Department for application submittal an9 fee collection.
1
Planning staff checks and signs mylars and notifies applicant's sur;veyor of approval.
. I
1
Applicant takes plat and accompanying documents to Lane Cou~ty for recording.
1
Applicant brings copies of recorded plat and documents to Development Services Department.
Revised 9/26/07 Molly Markarian
60f6