Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-11-4 Carlson Testing, Inc. 'K\L, Bend Office Geotechnical Office Eugene Office Salem Office Tigard Office (541) 330-9155 (503) 601-8250 (541) 345-0289 (503) 589-1252 (503) 684-3460 Daily Report of Proprietary Anchors Client: DATA SPECIALTIES INC - VERN KOOPS Project: DATA CENTER EXPANSION Address: 123 INTERNATIONAL WAY - SPRINGFIELD, OR Jurisdiction: cn representative M. AMESQUITA OBOA 898 was on site this date Nov, 04, 2009 to perform Special Inspection for: Permit COM 2009-01260 DFS #(s) SCOPE OF INSPECTION I. Checked in with superintendent or client representative. Name: VERN Company: DATA SPECIALTIES 2. Inspection was "IBe" [i] Continuous o Periodic PROPRIETARY ANCHORS Yes NoN/A 1. Reviewed previous inspection reports? 2. Reviewed evaluation report? I xl I X I Verified following items'meet manufactw:er.'s.~ u__ published installation instructions. 3. Verified minimum embedment depth of the anchors. X 4.Verified installation of the anchors. x 5. Verified anchor diameter. x 6. Verified steel grade. x 7. Verified hole diameter. x I I 8. Verified type of drill bit used. x I I I 9. Verified hole cleaning method. x I I 110. Verified adhesive application. I Ix 111. Verified edge distance. x I I 12. Verified spacing. I x I I 113. Verified installation torque. Ix i I . Evaluation report number & date: ICC ESR #2723 09/01/2008 Name of product being installed SIMPSON HD TITEN Batch Number N/A Expiration Date N/A cn Job #: E0901042, SPRINGFIELD PO Number: Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: WEST WAT,T, OF' rTPS ROOM R 1:"()R Rj'l'P'f'F'Ry.rAP. (24) BOLTS TOOUED TO 50FT/LBS. WEST WALL UPS ROOM A FOR MA'T'TRRY rAP I?nl p.m,'T'S TOROTlEO 'T'O 50F''T'/T.RS_ NOTE (4 \ ANCHORS HT'T' RRRA_R THTJS NO'T' TNS'T'AT,T,F',n TO REOUIRED EMBEDME~T DEPTH. ENGINEER'S WRITTEN bPPROVAL OR FIX IS REOUIRED. , -- -'--'-REPORT SUMMARY L Work inspected was: GJ Completed 0 In progress 2. Completed work inspected was not in compliance with GJ Approv~d plans and specifications D Shop drawings o RFI 0 Design change 0 Submittal 0 N/A Document#(s) ENGINEERING PACKET Dated: 08/14/2009 3. Noncompliance item(s) were noted this date, details on following pagers). GJ Yes 0 No 0 N/A 4. Noncompliance item(s) were reinspected this dare, details on following pagers), 0 Yes 0 No GJ N/A o Conform 0 Remain in progress Report(s) findings were discussed and left with VERN of DATA SPECIALISTS Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. D See additional report pagers). o Distribute attachments, Page _of_ Carlson Testing, Inc. Incompleted Items List (NCL) Nov 11,2009 E090 I 042. Project Name: Project Address: Permil No: P.O. No: DATA CENTER EXPANSION 123 INTERNATIONAL WAY - SPRINGFIELD, OR COM 2009-01260 Item # Insp. Date Item DescrilJtion 1 MA 11/0412009 (4) WEDGE ANCHORS WEST WALL OF UPS ROOM A HIT REBAR AT INSTALLATION. ENGINEER'S WRITTEN APPROVAL OR FIX IS REQUIRED. DATA SPECIALTIES INC - VERN KOOPS TO: CITY OF SPRINGFIELD BUILDING DEPARTMENT KPFF ROBERT RITNER PEACE HEALTH RIVERBEND ANNEX Compliance Project Manager: B, LEACH eTl Sign-Off Date Corrected Page: I