Daily Construction Report.
Client: Mr. Joe.McCormack Project: L TO Fleet Building Date: 11-02-09
Lane Transit District .Remodel Expansion Project No.: 2097153
PO Box 7070 3500.E.J 7'" J\ve. . Report No.: E-24454
Eugene, Oregon 97401 Eugene: Oregon Inspector: M. Meyer
ID No.:
Inspection of: Sitework. Weather: . ,Inside Continuous Inspection: 0
Contractor: Fortis Construction B.P. No. 'COM'2009'1164 Periodic Inspection: 0
AM - Met on.site withKeanRagei(F;;rti;rtoj;l5serV~-demb;;;ionoperations in west
~ . __ . -.__ ~ _ ~_ ",-___"'-'. ..~_4'.......''''_ '.' ,_, _ ( .
thirij of-bay 7.Currently;-slab, base material, hoist and'surrounding materials (sand
with-smaDgravej)_has.been,removed.jI,~d by Mr. Rager that actual excavation
depth vias approximately-8,feelobelowexisting-slab-and-.that excavation was
temporarily loosely backfilled to approximatelyA ,feefb'elow:slabto'prevent slough-
offand/orcave':in. . ~-.~~~:-~- - "'---~-- --- -.I
. -,~_....-
Fortis is proposing to use a "controlled low strength'fill material" (CLSM) as backfill
in lieu of placing and.compacting,imported.gr,anular fill in the hoist excavations. We
consider ,this a viable';optiOnwhichmay expedilEl-the work, and help prevent
undermining the existing slab adjacent to the excavation by eliminating the use of
vibrator,y compaction equipment. Mr. Rager was advised to contact the owner
and/or design for final approval.
PM -', Retulned,to'site.and.met,with-Dave .Baker (fortis) to observe completed
excavation :of west third'of-hoisUremoval area'in bay 7:1 Base of excavation ;s
approximately 8 feet-below::existingslab and 'appears-rel~tively clean and free of
loose materials.' Nearverticai-side-walls<:lPP&ar:~~I:3tively,-stable, at this time.
CLSM,was delivered by'Eugene"Sand'aniJ'Gravel (mix no.: 396213) ina flowable
condition and was placed in excavation directly from the trucks. Mr. Baker was
asked to notify our office when additional services are needed.
Reviewed By:
/h.'fpy
Michael L Meyer
Technical Manager
lIT [g@[gU\,#[gr\
_' \ NOV - 9 2009 \-"
c:
Fortis Construction - Kean Rager (em ail)
Pivot Architecture - John Stapleton (email)
Hohbach-Lewin - Vikki Bourcier (email)
Balzhiser Hubbard Engineers - Janet Spriggs (email)
City of Springfield " .
MLM:sc '
This report andfor enclosed test data'is the confidential property of the client to whom it is addressed and pertains to tile specific process and/or material evaluated. As
such, information contained herein shall not be reproduced in part or full and/or any part thereof-be disclosed without FEI Testing & Inspection, lnc,'s written authorization.
7ffJ t-NV ComeII Avenue' CorvatrlS, Oregon 97330' phone (541 ) 757-4698, fax (541) 757-2991
29540 BAiI]XrtRoad' Eugene, Oregon 97402, phone (541)684-J849 . fax (541)684-3851
62979 NE'Plateau Drive, Suite 3, Bend, Oregon 97701' phone (541) 382-4844 . fax (541) 382-4846
~
~t;1
Geotechnical & Construdion Services
11:"II~llrt:.I~~'~;.IIII~alllltl
November 13, 2009.
Mr. Joe McCormack
LTD
PO Box 7070
Eugene, Oregon 97401
Project No, 2097153
Report No. E-24548
Re; LTD Fleet Building Remodel! Addition
@00'Eo17th-Ay.eJ,
Eugene, Oreg<!n
BP No.:. COM 2009-1164
Subject:
Results of"laborator,y tests performed on one (1) 3/4"-0 crushed gravel sample submitted to
us on I\lovember 11,2009.
Sieve Analysis - AASHTO T27
1"
Percent Passing
100.0
88.0
. 60.0
45.0
30.0
14.0 (48.0*)
ODOT Specification
100.0
90-100
Sieve Size
3/4"
1/2"
3/8"
1/4"
#10
55,75
40~60
(*)
* of the fraction passing the 1/4" sieve, 40-60% shall pass the #10 sieve.
Reviewed By:
(J;, ';(,112 ,- -------
Michael L.Y~r
Technical Manager
c:
Fortis Construction - Kean Rager (email)
Pivot Architecture - Johni:Stapleton (email)
Hohbach-Lewin - Vikki Bourcier (email)
Balzhiser Hubbard Engineers - Janet Spriggs (email)'
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI.Te~ting & Inspection, Inc.'s written authorization..
720 r-NV ComeII Avenue' Cavallis, Oregon 97330, pha1e(541) 757-4698, fax (541) 757-2991
29540 BAirpcxtRoad' Eugene, Oregon 97402, phme(541)684J849. fax (541 )684-J851
~......
~7"rtl
~
Page 1 of 1
'1:"lltlN;.I~'lro'~=.II'II\ilf~lk
Geotechnical & Construction Servioos
Daily Construction Report
Client: Mr. Joe McCormack Project: LTD Fleet Building Date: 11-11-09
Lane Transit District Remodel Expansion Project No.: 2097153
PO Box .7070 'h~
C~OO E.,17- Ave,~ Report No.: E"24532
Eugene, Oregon 97:401 Eugene, Oregon Inspector: M. Meyer
ID No.:
Inspection of: Sitework Weather: Inside Continuous Inspection: 0
Contractor: Fortis Construction B.P. No. C0M2009-1164? Periodic Inspection: 0
'-- -~'
Met with Fortis Construction representatives to observe completed excavations of
hoist/equipment removal areas in bays 6 and 7 inside existing building (Note: hoists
and surrounding soils at west ends of bath bays had already been removed and
excavations were backfilied with CLSM prior to today's site visit). Excavation depth
generally ranges between 7:5 and 8,5 feet below existing slab. elevation. Previous
east/west pit slabs have been left in-place at the bottom of the excavations in both
bays. Near vertical excavation side walls, mainly consisting of crushed rock,
appear generally stable at this time. Base of excavations appear relativeiy free of
debris and/or loose materials. Kean Rager (Fortis) stated CLSM placement is
scheduled for later today. Mr. Rager was asked to notify our office when additional
~~-~~. .
Reviewed By:
'v~<e~o~~--=.'
~I I
NOV 1 7 2009i, ,
J~__ , uJ'
j/J. i. ~A---
Michael L.Me.;frY , .
Technical Manager
c:
Fortis Construction - Kean Rager (email)
Pivot Architecture - JOhn:Stapleton (email)
Hohbach-lewin _ Vikki Bourcier (email)
Baizhiser Hubbard Engineers'- Janet Spriggs (email)
City of Springfield
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the speCific process and/or material evaluated. As
such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization.
7ffJ NN ComeII Avenue' Corvallis, Qegon 97330' phone (541) 757-4698, fax (541) 757-2991
il540 B Airport Road . Eugene, 0egJn 97402 'pha1e(541) 684J849 . fax (541) 684-3851
62979 NE Plateau Drive,Surte3. Bend, Oregon 97701 . phone (541) 382-4844' fax (541) 382-4846
. .
(~fE'
11a.'lI\Ilrt;.I~~':l=lllm.I~I. G:..v~J.lnical & Construction Services
Page 1 of 1
Field DensityTest Results - ASTM D 2922
Client: Mr. Joe McCormack
Lane Transit District
PO Box 7070
Eugene, Oregon 97401
Project: L TO Fleet Building
Remodel Expa'!sion--)
C3500E~!7lhAve, ,,~
l::ugene;Oregon
Date:
Project No.:
. Report No.:
B.P.No.:,
11-18.09
2097153
E-24591
(COM:2009-1164
MOISTURE/DENSITY DATA: ASTM D698'- Maximum Dry Density of 129.8 pcf, at 10.6% moisture, is from our sample
no. 2138 dated 11-17-09 for 3/4"-0 crushed gravel (Delta Sand and Gravel).
~~ --,.
Wet Dry
Test Approximate Location Approx. Density Percent Density Percent Compaction
No. Elev. (pet) Moisture (pct) Compaction Requirement
Fleet .Blda.
1 Be,tween bays ~ & 6:'" east side -2.5' 130.6 4.7 124.8 96.0 95.0
2 Between bays 5 & 6 - east side -OS 135.6 5.5 128.6 99.0 95.0
3 Between bays 5 & 6 - east side FG 131.2 6.7 122.9 95.0 95.0
Wash Bide. - REimoved Drain'Fill
4 Center of chasis wash area -1,5' 135.8 6.2 127.8 99.0 95.0
5 Center of chasis wash area FG 130.9 6.1 123.4 95.0 95.0
,.-
Tests performed in fill inside fleet building and wash building.
Remarks: Mike (Della) and Kean Rager (Fortis) were advised of test results,
Reviewed By:
~~~~O~~i-::;-"
_1 NOV 2 4 2009
..2
(/J7, <;( ~
Michael L ~~
Technical Manager
c:
Fortis Construction - Kean Rager (email)
Pivot Architecture - John Stapleton (email)
Hohbach-Lewin - Vikki Bourcier (email)
Balzhiser Hubbard Engineers - Janet Spriggs (email)
City of Springfield
MLM:sc
This report and/or eIl~losed test data is the confidential property of tile Client to whom ills addressed and pertains to the specific process and/or material evaluated. As such, infonnation
contained herein shall not be reproduced in part of full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc. '5 written authorization.
750 NW Canell Avenue' Corvallis, Oregon 97330' phOl1e(541) 757-4ff18' fux (541) 757-299t
29540 BAilpcrtRood' Eugene, 0regun97402 'phOl1e(541)684-3849' fux(541) 684-385t
62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 ' phone (541) 382-4844 . fax (541) 382-4846