Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-11-2 ~dl ~fE' Page 1 of 1 Ila.'Jl/I,.;tlr",'~.a'IIII~.I~I. Geotechnical & Construction Servires Daily Construction Report. Client: Mr. Joe.McCormack Project: L TO Fleet Building Date: 11-02-09 Lane Transit District .Remodel Expansion Project No.: 2097153 PO Box 7070 3500.E.J 7'" J\ve. . Report No.: E-24454 Eugene, Oregon 97401 Eugene: Oregon Inspector: M. Meyer ID No.: Inspection of: Sitework. Weather: . ,Inside Continuous Inspection: 0 Contractor: Fortis Construction B.P. No. 'COM'2009'1164 Periodic Inspection: 0 AM - Met on.site withKeanRagei(F;;rti;rtoj;l5serV~-demb;;;ionoperations in west ~ . __ . -.__ ~ _ ~_ ",-___"'-'. ..~_4'.......''''_ '.' ,_, _ ( . thirij of-bay 7.Currently;-slab, base material, hoist and'surrounding materials (sand with-smaDgravej)_has.been,removed.jI,~d by Mr. Rager that actual excavation depth vias approximately-8,feelobelowexisting-slab-and-.that excavation was temporarily loosely backfilled to approximatelyA ,feefb'elow:slabto'prevent slough- offand/orcave':in. . ~-.~~~:-~- - "'---~-- --- -.I . -,~_....- Fortis is proposing to use a "controlled low strength'fill material" (CLSM) as backfill in lieu of placing and.compacting,imported.gr,anular fill in the hoist excavations. We consider ,this a viable';optiOnwhichmay expedilEl-the work, and help prevent undermining the existing slab adjacent to the excavation by eliminating the use of vibrator,y compaction equipment. Mr. Rager was advised to contact the owner and/or design for final approval. PM -', Retulned,to'site.and.met,with-Dave .Baker (fortis) to observe completed excavation :of west third'of-hoisUremoval area'in bay 7:1 Base of excavation ;s approximately 8 feet-below::existingslab and 'appears-rel~tively clean and free of loose materials.' Nearverticai-side-walls<:lPP&ar:~~I:3tively,-stable, at this time. CLSM,was delivered by'Eugene"Sand'aniJ'Gravel (mix no.: 396213) ina flowable condition and was placed in excavation directly from the trucks. Mr. Baker was asked to notify our office when additional services are needed. Reviewed By: /h.'fpy Michael L Meyer Technical Manager lIT [g@[gU\,#[gr\ _' \ NOV - 9 2009 \-" c: Fortis Construction - Kean Rager (em ail) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield " . MLM:sc ' This report andfor enclosed test data'is the confidential property of the client to whom it is addressed and pertains to tile specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof-be disclosed without FEI Testing & Inspection, lnc,'s written authorization. 7ffJ t-NV ComeII Avenue' CorvatrlS, Oregon 97330' phone (541 ) 757-4698, fax (541) 757-2991 29540 BAiI]XrtRoad' Eugene, Oregon 97402, phone (541)684-J849 . fax (541)684-3851 62979 NE'Plateau Drive, Suite 3, Bend, Oregon 97701' phone (541) 382-4844 . fax (541) 382-4846 ~ ~t;1 Geotechnical & Construdion Services 11:"II~llrt:.I~~'~;.IIII~alllltl November 13, 2009. Mr. Joe McCormack LTD PO Box 7070 Eugene, Oregon 97401 Project No, 2097153 Report No. E-24548 Re; LTD Fleet Building Remodel! Addition @00'Eo17th-Ay.eJ, Eugene, Oreg<!n BP No.:. COM 2009-1164 Subject: Results of"laborator,y tests performed on one (1) 3/4"-0 crushed gravel sample submitted to us on I\lovember 11,2009. Sieve Analysis - AASHTO T27 1" Percent Passing 100.0 88.0 . 60.0 45.0 30.0 14.0 (48.0*) ODOT Specification 100.0 90-100 Sieve Size 3/4" 1/2" 3/8" 1/4" #10 55,75 40~60 (*) * of the fraction passing the 1/4" sieve, 40-60% shall pass the #10 sieve. Reviewed By: (J;, ';(,112 ,- ------- Michael L.Y~r Technical Manager c: Fortis Construction - Kean Rager (email) Pivot Architecture - Johni:Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email)' City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI.Te~ting & Inspection, Inc.'s written authorization.. 720 r-NV ComeII Avenue' Cavallis, Oregon 97330, pha1e(541) 757-4698, fax (541) 757-2991 29540 BAirpcxtRoad' Eugene, Oregon 97402, phme(541)684J849. fax (541 )684-J851 ~...... ~7"rtl ~ Page 1 of 1 '1:"lltlN;.I~'lro'~=.II'II\ilf~lk Geotechnical & Construction Servioos Daily Construction Report Client: Mr. Joe McCormack Project: LTD Fleet Building Date: 11-11-09 Lane Transit District Remodel Expansion Project No.: 2097153 PO Box .7070 'h~ C~OO E.,17- Ave,~ Report No.: E"24532 Eugene, Oregon 97:401 Eugene, Oregon Inspector: M. Meyer ID No.: Inspection of: Sitework Weather: Inside Continuous Inspection: 0 Contractor: Fortis Construction B.P. No. C0M2009-1164? Periodic Inspection: 0 '-- -~' Met with Fortis Construction representatives to observe completed excavations of hoist/equipment removal areas in bays 6 and 7 inside existing building (Note: hoists and surrounding soils at west ends of bath bays had already been removed and excavations were backfilied with CLSM prior to today's site visit). Excavation depth generally ranges between 7:5 and 8,5 feet below existing slab. elevation. Previous east/west pit slabs have been left in-place at the bottom of the excavations in both bays. Near vertical excavation side walls, mainly consisting of crushed rock, appear generally stable at this time. Base of excavations appear relativeiy free of debris and/or loose materials. Kean Rager (Fortis) stated CLSM placement is scheduled for later today. Mr. Rager was asked to notify our office when additional ~~-~~. . Reviewed By: 'v~<e~o~~--=.' ~I I NOV 1 7 2009i, , J~__ , uJ' j/J. i. ~A--- Michael L.Me.;frY , . Technical Manager c: Fortis Construction - Kean Rager (email) Pivot Architecture - JOhn:Stapleton (email) Hohbach-lewin _ Vikki Bourcier (email) Baizhiser Hubbard Engineers'- Janet Spriggs (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the speCific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7ffJ NN ComeII Avenue' Corvallis, Qegon 97330' phone (541) 757-4698, fax (541) 757-2991 il540 B Airport Road . Eugene, 0egJn 97402 'pha1e(541) 684J849 . fax (541) 684-3851 62979 NE Plateau Drive,Surte3. Bend, Oregon 97701 . phone (541) 382-4844' fax (541) 382-4846 . . (~fE' 11a.'lI\Ilrt;.I~~':l=lllm.I~I. G:..v~J.lnical & Construction Services Page 1 of 1 Field DensityTest Results - ASTM D 2922 Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97401 Project: L TO Fleet Building Remodel Expa'!sion--) C3500E~!7lhAve, ,,~ l::ugene;Oregon Date: Project No.: . Report No.: B.P.No.:, 11-18.09 2097153 E-24591 (COM:2009-1164 MOISTURE/DENSITY DATA: ASTM D698'- Maximum Dry Density of 129.8 pcf, at 10.6% moisture, is from our sample no. 2138 dated 11-17-09 for 3/4"-0 crushed gravel (Delta Sand and Gravel). ~~ --,. Wet Dry Test Approximate Location Approx. Density Percent Density Percent Compaction No. Elev. (pet) Moisture (pct) Compaction Requirement Fleet .Blda. 1 Be,tween bays ~ & 6:'" east side -2.5' 130.6 4.7 124.8 96.0 95.0 2 Between bays 5 & 6 - east side -OS 135.6 5.5 128.6 99.0 95.0 3 Between bays 5 & 6 - east side FG 131.2 6.7 122.9 95.0 95.0 Wash Bide. - REimoved Drain'Fill 4 Center of chasis wash area -1,5' 135.8 6.2 127.8 99.0 95.0 5 Center of chasis wash area FG 130.9 6.1 123.4 95.0 95.0 ,.- Tests performed in fill inside fleet building and wash building. Remarks: Mike (Della) and Kean Rager (Fortis) were advised of test results, Reviewed By: ~~~~O~~i-::;-" _1 NOV 2 4 2009 ..2 (/J7, <;( ~ Michael L ~~ Technical Manager c: Fortis Construction - Kean Rager (email) Pivot Architecture - John Stapleton (email) Hohbach-Lewin - Vikki Bourcier (email) Balzhiser Hubbard Engineers - Janet Spriggs (email) City of Springfield MLM:sc This report and/or eIl~losed test data is the confidential property of tile Client to whom ills addressed and pertains to the specific process and/or material evaluated. As such, infonnation contained herein shall not be reproduced in part of full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc. '5 written authorization. 750 NW Canell Avenue' Corvallis, Oregon 97330' phOl1e(541) 757-4ff18' fux (541) 757-299t 29540 BAilpcrtRood' Eugene, 0regun97402 'phOl1e(541)684-3849' fux(541) 684-385t 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 ' phone (541) 382-4844 . fax (541) 382-4846