HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-11-9
i "~.IInfonnation
I~~'! To Build On
16..lr',.
I, I ',.. . Corner -lit... . .........
Client:
Address:
Jamie Lockwood
New Hope Builders
32724 Berlin Road
Lebanon, OR 97355
Placement Data:
Slab on grade
~
COMPRESSION REPORT
SPRINGFIELO OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
O~t~: _, , -'- N~~ej!i~T,Wl, 2009 CCB#176269
!!:.P ~ No..j~.q ~'Q::L:IJ
P.O. No.:
Cast By: Glenn Meek Jr
Project No.: 722-90118-24
Proj. Name: FMC-OS of Springfield
Location: 304:aStreet;:::7
Eugene, Oregon
lTield Test Data
4"
3/4"
Material: Concrete
09-2185 10/19/2009
09-2186 11/9/2009
09-2187 11/9/2009
09-2188 Hold I
... 1 - Cone (both ends) 2 - ConeNertical Cra{ ,s (one end) 3. Columnar 4 - Diagonal wIno cracking at ends
Remarks: Set #2
cc: New Hope Builders - scolt@newhopebuilders.com
City of Springfield
Location Sampled At:
Slab on grade 25' south of north end
Oate Cast: 10/12/09 Date Ree'd: 10/13/09
Ticket No.: !MiX No.: Weather:
3460888 40NE5200 Clear
Oesi!'ln Stren!1th (osi):
required 4,000
Cylinder No, Test Date
Age (days) Field Cure lab Cure
(days) (days)
7 6
28 27
28 1 27
H H
Yardage
13/10
160
Slump'(in.): ASTM Cf43
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pet): ASTM Cf38
Time Cast: 10:15 AM
Additives:
Results Reported To:
I
590
630
4x8
Load:
Total:
ISUPPlier:
Knite River
Cyrlng Conditions:
ASTM.
Contractor
Compressive Strength Data ASTM C39
olaced 4,000
,.
Diameter or I
Dimensions Cross Sect. Area Cylinder WT. Max. Load (ibs.) Compo Strength F t T H Test Time Capping Method
(Inches) (5,1,) (Ibs.) (p~l) rac ure ype
C617 C1231
4.02 12.69 8.8 67,340 5,~10 3 2:06 PM X
4.00 12.57 8.8 96,455 7,670 3 9:30 AM X
4.00 12.57 8.8 94,100 7,490 3 9:36 AM X
l
5 - Side frac ures (at top of bottom) 6. - Top fra'ctures (same as #5 but end of cylinder is pointed)
. R~t:~:~~IIY submitted,
prAi2i;J!t-:ndustries, Inc.
Seven E. Wilder
Laboratory Supervisor
These results relate only to the specific samples tested and may not be indicative of other locations. This report cannot be reproduced, except in full,
without written permission by Professional Service Industries, Inc. i
l. "'~,' , lInrfiormation
...~. .
~~If': To Build On
Illng' , "." . ~. r"",,, "-I
Client:
Address:
Jamie Lockwood
New Hope Builders
32724 Berlin Road
Lebanon, OR 97355
Placement Data:
Slab on grade
COMPRESSION REPORT
Project No.: 722-90118-25
Proj. Name: FMC-DS of Springfield
Location: 304 Q St!eill
Eugene, Oregon
MaterI31:'.Concrete
Location Sampled At:
Slab on 9rade 10' south of north end
Date Cast: 10/12/09 Date Rec'd:
Ticket No.: IMiX No.: Weather:
3460890 40NE5200
10/13/09
Ciear
Desiqn Strenqth (psi): reQuired 4,000
Cylinder No. Test Date Age (days) Field Cure Lab Cure
(days) (days)
09-2189 10/19/2009 7 6
09-2190 11/9/2009 28 27
09-2191 11/9/2009 28 27
09-2192 Hold H H
1 Yardage
Load: 15/10
lTotal: 160
IsuPPlier:
Knife River
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM G231
A.ir Temperature (F):
Material Temp. (F): ASTM CI064
Max Temp (F):
Min Temp (F):
Specimen Size:
Unit Weight (pel): ASTM Cl38
Time Cast: 10:50 AM
Additives:
Results Reported To:
Compressive Strength Data ASTM C39
placed 4,000
Diameter or
Dimensions
(inches)
\d2--
SPRINGFIELO OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
COate:_: NO}em_ber 9, 2009 CCB#176269
B.P..No.._ (;'9\-$-\-:1 I
P.O. No.:
Cast By: Glenn Meek Jr
F,ield Test Data
43/4"
3/4"
59'
66'
4x8
Curing Conditions:
ASTM
Contractor
J
Cross Sect. Area Cylinder WT.
(5.1.) (Ibs.)
,
Max. Load (Ibs.) comPip~~;ength Fracture Type *. Test Time
Capping Method
4.01 12.63
4.00 12.57
4.00 12.57
I
I
I
I
5 - Side fractures (at lop of be Hom)
8.6
62,120
83,155
81,720
8.6
8.6
** 1 - Cone (both ends) 2 - ConeNertical Crae ~s (one end) 3 ~ Columnar 4 - Diagonal wino cracking al ends
Remarks: Set #3
cc: New Hope Builders - scott@newhopebuilders.com
City of Springfield
C617 C1231
4,~20 3 2:02 PM X
6,~10 3 9:18AM X
6,500 2 9:22 AM X
,
6 - Top fr .clures (same as #5 but end of cylinder is pointed)
, R~Ts~:~UIlY submitted,
PI r~n~se vice Industries, Inc.
stiiven E. Wilder '
Laboratory Supervisor
These results relate only to the specific samples tested and may not be indicative of other locations. This report cannot be reproduced, except in full,
without written permission by Professional Service Industries, Inc. !
l.....~.IInformation
I"'!!'~~ 7b Build On
.....111...."-.. . CD .., IIA.. . 11 ". j 'd
Client:
Address:
Jamie Lockwood
New Hope Builders
32724 Berlin Road
Lebanon, OR 97355
Placement Data:
Slab on grade
COMPRESSION REPORT
SPRINGFIELD~CE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
Oate:__ ,. November_9, 2009 CCB#176269
CB.F!.No.:GJ;l.~'tl-.J'-:::L J
P.O. No.:
Cast By: Glenn Meek Jr
Project No.: 722-90118-26
Proj. Name: FMC-DS of Springfield
Location: ,304 Q Slre.etJ
Eugene, Oregon
ILoad:
Total:
Supplier:
Knife River
Slump (In.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
Air Temperature (F):
Material Temp. (F): ASTM C1064
Max Temp (F):
Min Temp (F):
3pecimen Size:
Unit Weight (pel): ASTM C138
Time Cast: 10:50 AM
,
Additives:
Results Reported To:
Field Test Data
.43/4"
3/4"
Material: Concrete.
"Location Sampled At:
35' north of south end
Date Cast: 10/12/09 Date Rec'd: 10/13/09
Ti~~~~~;~ IM~0~OE:5200 Weather:
Clear
Oesiqn Strenqth (psi): reauired 4.000
Cylinder No. Test Date Age (days) Field Cure Lab Cure
(days) (days)
09-2181 10/19/2009 7 6
09-2182 11/9/2009 28 27
09-2183 11/9/2009 28 27
09-2184 Hold H H
59"
66"
Yardage
3/10
160
4x8
Curing Conditions:
ASTM
ContraCtor
Compressive Strength Data ASTM C39
placed 4.000
Diameter or Cross Sect. Area Cylinder WT. Compo Strength F t T ".
Dimensions Max. load (Ibs.) Test Time
(Inches) (s.l.) (Ibs.) (pf') rac ure ype
4.02 12.69 8.7, 64,725 5,1,00 3 1:51 PM
4.00 12.57 8.7 91,285 7,~60 3 9:10AM
4.00 12.57 8.7 90,565 7,200 3 9:15AM
Capping Method
C6l7 C1231
x
x
X
i
5 - Side frac ures (at top of bottom) 6, - Top fractures (same as #5 but end of cylinder is pointed)
Re ctfully submitted,
Pr SiOna?~dUSlries, Inc.
Seven E. Wilder
Laboratory Supervisor
.....--1 ~ Co"ne"(bo'th"emdsf i - ConeNertical Cracks (one end) 3 - Columnar 4 - Diagonal wino cracking at ends
Remarks: Set #1
cc: New Hope Builders - scott@newhopebuilders.com
City of Springfield
;
These results relate only to the specific samples tested and may not be indicative of other locations. This report cannot be reproduced, except in full,
without written permission by Professional Service Industries, Inc. i
1 iI. Jt illlnfonnation
~~. To Build On
I ,,;. '. ".1. ConsultIng . .....
, FIELD DENSITY R~PORT
SOIL AND SOIL-AGGREGATE
Client: Jamie Lockwood
Address: New Hope Builders
32724 Berlin Road
Lebanon, OR 97355
Projecl No.: 722-90118-28
Project: FMC . OS of Springfield
Project 304 Q Street,
Location: EUgene, Ore9~m
Equipment: Troxler: 3430 SN: 28693
Date Performed:
P.O. No.: .
--
r- -~B:P. !!o_~
Technician:
Laboratory Soil / Aggregate Data:'
Moisture Density Relationship of 126.8Ibs.lcu.ft., at 13.7% moisture. was furnished by clleflt, Delta S & G for 3/4"-0 T-99.
c
tdL
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 -(541)746-7163 fa,
cca #176269
November 5, 2009
C-~~m1..
Anthony Deiuca
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 666 DS 2645)
,
Percent Required Comments
CompBf:.=tion Compaction
98.4 95% parkinQ lot
99.9 95% parkinQ lot
Test No.
Approximate Test Location
Approximate .Test Probe Wet Density Dry Density Percent
Elev. Depth LBSfCU.FT. LBS/CU.FT. Moisture
NW corner of parking
2 3D' E of NW corner
3 N E corner
Tests performed at finished grade of base rock at locations listed above.
Test results were verbally reported to Sue (DS&G).
FRG
FRG
FRG
8"
, 8"
130.9
132.1
128.4
124.8
126.6
122.0
8"
cc: New Hope Builders - scot!@newhopebuilders.com
City of Springfield -
4.9
4.3
5,3 96.2 950/.
Respectfully Submit!
Us~ona~ice
\ WV'yl- - \
Smith
Branch Manager
oarkina lot
d
ndU3!c.
Rr:/i
,."
1010/1 / "" <::,
f) J/Jll..q
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CUENT ONLY. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, ANO ITS TRANSMITTAL TO A THIRD PARTY BY ANY 11EANS EXCEPT IN FULL IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.
I
l"'~;lInformation
,.,~. .To Build On
Engineering. Consulting . Testing
~
DAILY FIELD REPORT
Oate Performed:
Client:
October 27, 2009
Report Number:
722-90118-27
Jamie Lockwood
New Hope Builders
32724 Berlin Road
Lebanon, OR 97355
Project Name: FMC-OS of Springfield
, . ,
, 304 Q Street
Project Location: ' Eugene, Oregon
Building Permit NO.:~e'G.:":~
Shopl Field: Field
Weather: '.. Showers
Contractor:
Fabricator:
Type of Inspection:
Welding Inspection
Field Observations and Comments
Performed periodic visual inspection of the following items: Welds at drive-thru beam to column and column to base
plates reference details 3 and 9/5400. Note: Lu June bolts are in twist-oft condition at coiumn to beam locations.
Weldments were inspected for size, length, profile, and locations. To the best of our knowledge, the work inspected is in
conformance with a!>proved drawinos: soecifications: and aoolicable D1.1 codes.
Inspector: Oavid F. Smith, ICC# 0877340-85
eBB #176269
If you have any estions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Su
~:
David Smith
Branch Manager
~~~~D~~ ~
l NOV 1 7 2009 .:d
THIS REPORT 1$ PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY MB"HOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. lQ40-A Shelley Street. Springfield, OR 97477. Phone 541/746-9649. Fax 541{746.7163