HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2009-11-20 ~......t ~tt RECr::IVED NOV 20 2009 ~ Page 1 of 1 '1~'llllrt;"II~'~:.llllI"lll. Geotechnical & Construc:OOn Servire; Daily Field Report Client: Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon Date: Project No.: Report No.: Inspector: 10 No.: EWEB 500E. 4th Ave. Eugene, Oregon YlSi ~dtv\ f:>~ 11-17-09 2087168 E-24582 D. Delatte 1080867-88 ICC . Inspection of: Reinforced Concrete Contractor: Wildish Building Weather: Overcast.. BP No.: 2008-00225 Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for east wall of fiiter basin. Preliminary reinforcing steel inspection was performed by our office on 11-10-09 (ref: FEI report E-24515). Observed the placement of 40.0 yards of Knife River 4000 psi concrete (mix 2440KIUOKS) into walls noted above. Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" concrete test cylinders from load 1. Jake Stucky (Wildish) and Mike Stickling (EWEB) were advised of the on- site test resuils. Load 1: slump - 6"; air temperature - 49F; concrete temperature - 65F; air content at beginning of ioad - 3.6% and near middle of load - 2.9%. Air content at beginning of load 2 - 3.2%. Load 2 was rejected by Mr. Stickling and Mr. Stucky. Air content at beginning of load 3 - 6.0% To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except i(noted above. Reviewed By: ;h. '/11.y- Michaei L. Meyer Technical Manager c: EWEB- Mike Stickling (emaH) EWEB- Wally McCullough (em ail) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield . . . MLM:sc This report an"d/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 rwJ ComeIIAvenue' CavalUs, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 BAirport Road, Eugene, Qegoo 97402, phone (541) 684;J849 . fax (541 )684-3851 62979 NE Plateau Drive, Sutte 3, Bend, Oregon 97701. phone (541) 3824844 . fax (541) 382-4846 ~ ~ftt 11til.'I!IIltl:"h\..'n'IIIJ~.m" GeolP.d1nical & OYlstrUCtiOf\ ServicEs Compressive Strength of Concrete (ASTM C 39\ CLIENT EWEB 500E. 4th Ave. Eugene, Oregon 97440 PROJECT Hayden BridgeW;'ter i-' ~_ "Filtration Plant Expansion \ l~~ri~gfield, OrT\lof\ nVJ-{fuXl D\1~ \~008-00225 . DATE PROJECT NO. REPORT NO. 11-11-09 2087168 6744 3q5l BPNO. DATE CAST 11-04-09 CAST BY D. Delatte DATE RECEIVED 11-05-09 STRENGTH REQUIRED 4000 psi SPECIMEN SIZE 4" x 8" STRENGTH PLACED 4000 psi SACKS SUPPLIER Knife River PRODUCT CODE 40-SE7 CEMENT MAX SIZE AGG. 3/4" ADDITIVES AEA; Super; Eclipse AIR CONTENT 3.6% LOAD NO. 1 TICKET NO. 3500818 SLUMP 41/2" CONCRETE TEMP 64' F YARDAGE 4.0 OF. 4.0 TIME 1:40 PM AIR TEMP 58" F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 POUR LOCATION Two (2) inter tie tunnel walis. TEST DATE 11-11-09 12-02-09 12-02-09 Hold AGE (DAYS) 7 28 28 AREA (IN.') 12.56 WEIGHT (LBSt 8.52 TOTAL LOAD (LBSt 53840 COMPRESSIVE STRENGTH (PSI) 4290 ) AVERAGE STRENGTH (PSIl TIME OF TEST 11:55AM TYPE OF FRACTURE" 2 .. 1- End Cones 2 _ Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (lop or bottom) 6 - Side (pointed lop or bottom) REMARKS: Jake Stucky (Wildish) was advised of on-site test results. Reviewed By: A.1f~' Michael L. Meyer Technical Manager c:- EWEB- Mike Sticklin9 (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) . Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (em ail) City of Springfield Knife River MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NW Cornell Avenue. Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991' 29540 BAirport Road, Eugene, Oregon 97402. phone (541)684-3849' fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701. phone (541) 3824844 . fax (541)382-4846 EWEB 500E. 4'h Ave. Eugene, Ore90n 97440 TEST AGE AREA WEIGHT TOTAL COMPRESSIVE DATE (DAYS) (IN.'! (LBSI LOAD (LBS) STRENGTH (PSI! 10-21-09 7 12.56 8.43 52275 4160 11-11-09 28 12.56 8.44 64865 5160 11-11-09 28 12.56 8.49 67845 5400 Hold (~ft) '1~'llflrt;"lj..'~1.IIIJl.I~I. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION ~ G....,;~ ,,1ical&~~ Compressive Strength of Concrete lASTM C 39\ PROJECT Hayden Bridge Water Filtration Plant Expansion 3Q'3l\-\cu1 ~g~~n BP NO.2.Qo.8-00225 DATE PROJECT NO. REPORT NO. 11-11-09 2087168 6697 10-14-09 CAST BY D. Delatte DATE RECEIVED 10-15-09 4000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 2440KIUOKS CEMENT MAX SIZE AGG. 3/4" AEA; Super; Eclipse AIR CONTENT 4.2% 1 TICKET NO. 3444295 SLUMP 63/4" 71" F YARDAGE 10.5 OF 10.5 TIME 12:50 PM 66" F WEATHER Overcast SPECIMEN STORAGE ASTM C 31 Two (2) interior 6" channel walls in the northeast and southeast quadrant and two (2) interior 9" walls' near 24" pipe in the northeast quadrant of filter basin all from slab to bottom side of upper slab. AVERAGE STRENGTH (PSI! TIME OF TEST 8:10AM 11:10AM 11:15AM TYPE OF FRACTURE- 3 5 2 ~ - 5280 REMARKS: Jake Stucky (Wildish) was advised of on-site test results. .. ,. End Cones 2. Cone/Split 3 - Columnar 4 - Diagon~1 5 - Side (top or botlom) 6 - Side (pointed top orbotlom) Reviewed By: /Jl.'-t,~ Michael L.' Meier Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullou9h (email) OBEC- Pete Slocum (email) Wild ish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (em ail) City of Springfield Knife River MLM:sc This report and/or enclosed test data is the confidential property. of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, infonnatlon contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & In"spection, Inc.'s written authorization. 750 rwJ Cornell Avenue . Corvallis, Oregon 97330. phone (541) 757-4698, fax (541) 757-2991 29540 B Airport Road' Eugene, Oregon 97402. phone (541) 684-3849' fax (541) 684-3851 .62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701' phone (541) 3824844 . fax (541) 382-4846 ~K ~"''''I ~rt Page 1 of 1 11!J.I.itl!Ii..1~,,'lj}'II'lmw.!II Geotechnical & Construction Servire; Daily Field Report , Client: EWEB Project: HaydenBridgeWater Filtration Oate: 11-10-09 500E. 4th Ave. Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24515 3151 Wu-tckY'\bn~ Inspector: D. Delatte 10 No.: 1080867-88 ICC Inspection of: Reinforcing Steel! Weather: Overcast Continuous Inspection: 0 Epoxy Anchors Contractor: Wildish Building BP No.: C2008~OO225 Periodic Inspection: 0 Performed preliminary inspection on the reinforcing steel for east wall of filter basin. Reinforcing steel was checked for grade, size, laps, quantities, locations, ties, clearance and supports. A final inspection will be performed prior to concrete placement. - -~ .-.- --, ~- ..' Also, observed the inst?lIation;Of;four'(4) 5/8'x:.l;l';::~taif\less~steeLall-thread anchors .into.concrete'wall for stopJog,reinforcing bars, tWo\2Eanchors at each end. Prior to ,installat!on,,'the predrillea--holes-were- ~leangd::'With- a:::im:ish: ~nd _ compressed air. Verified minimum embedment-depth-of-6". Anchors'were secured with, Epcon A-7 epoxy adhesive (ISS -''ER55601 expiration date 12-29-10). .' To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C:, except if noted,above. Reviewed By: ~~~~D\if~.~ 1. NOV 1 7 2009 [ -I !d' /h.-i. ~ Michaei L.:~eF Technical Manager c: EWEB- Mike Stickling (em ail) EWEB- Wally McCullough (em ail) OBEC- Pete Slocum (eniail) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield MLM:sc . '. ' ~ t . ." . This repof1. andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part .... ." thereof be disclosed without FEl Testing & Inspection, lnc.'s written authorization. 750 NW CanelJAvenue' Cavallis, Qegoo 97330' pIlcr1e(541) 757-4698, fax (541) 757-2991 29540 BAirpcx1Road' Eugene, Oregon 97402, phone (541)684;)849. fax (541 )684-J851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 3824844 . fax (541) 382-4846 (~ft) 11.'11""'."'''''1111'.'''. GeotP.d1nirnl & Construc:lion Servirns CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED TEST DATE 11-09-09 11 :30-09 11-30-09 Hold AGE (DAYS) 7 28 28 kt Compressive Strength of Concrete 'ASTM C 39) PROJECT Hayden Bridge Water Filtration Plant Expansion 8i5l 4-\~~~J~~nc~ BP NO. I, ~008,00225. ; DATE PROJECT NO. REPORT NO. EWEB 500E. 4~ Ave. Eugene, Oregon 97440 11-09-09 2087168 6736 11-02-09 CAST BY A. Fenstermacher DATE RECEIVED 11-03-09 4000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 40-SE7 CEMENT MAX SIZE AGG. 3/4" Super; Eclipse; AEA AIR CONTENT 4.6% 1 TICKET NO. 3500736 SLUMP 8" 630F YARDAGE 9.0 OF 18.0 TIME 10:10AM 4W F WEATHER Partiy Cioudy SPECIMEN STORAGE ASTM C 31 Filter building; east half of suspended slabs above 24" FW/BW pipes and center suspended walkway, west side. From suspended walkway. AREA (IN.') .12.56 WEIGHT (LBSI 8.45 COMPRESSIVE STRENGTH JPSIl 4510~-- AVERAGE STRENGTH (PSIl TIME OF TEST 7:35 AM TOTAL LOAD (LBS) 56590 REMARKS: Jake Stucky (Wildish) was advised of on-site test results. .. 1- End Cones 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top or bottom) 6 - Side (pointed lop or bottom) Reviewed By: ;J1.'i.~~ Michael L. Meyl ~ Technical Manager ~.~~~u~~~. 1 NOV 1 8 2009 c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC-. Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City ot Springfield Knife River MLM:sc .:!J TYPE OF FRACTURE*. 3 This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specffic process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 750 NW Cornell Avenue' Corvallis, Oregon 97330 . phone (541) 757-4698 . fax (541) 757-2991 29540 B Airport Road . Eugene, Oregon 97402' phone (541) 684-3849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 3824844 . fax (541) 382-4846 ~ ~fEt Page 1 of 1 11~'llflCl;.l~.'~a'IlIJ\'IIII/LII Gcv""'; .nlcal & Construction Servire; . Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Oate: 11-04-09 500E. 4th Ave. Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-24480 2)15l ~O>.-\~ 6n:~ Inspector: D. Delatte 10 No.: 1 080867-88 ICC Inspection of: Reinforced Concrete Weather: Partly Cloudy , Continuous Inspection: 0 Contractor: Wildish Building BPNo.: @08-00225 ' Periodic Inspection: 0 Performed final inspection on the reinforcing steel for two (2) inter tie tunnel walls. A preliminary inspection was performed on 11-03-09 (:ef: FQr:.eport ~:24452). .-- -~~.- Observed the placement of-4,0-yards'of Knife River 4000 psi. concrete (mix 40-SE7) into areas noted above: Concrete was-placedbywheei.barrow and .was mechanically consolidated.' Cast one (1) s'.;j 'of fo0r (4) 4'''x.8" compressive. strength cylinders. Notified Jake Stucky (Wild ish).. of tneon'site resulls:--c. Slump _ - 4 1/2"; concrete temperature - 64F; air teIl1P~i8ture ~'58F; air-content-':'3.60/o'. - To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: !h,~.~ Michael L. Meyer Technical Manager c; EWEB- Mike Stickling (em ail) EWEB- Waily McCullough (em ail) OBEC- Pete Slocum (emaii) Wildish Building Co.- Kevin Fitzjarrell (em ail) Wildish Building Co.- Jake Stucky (email) City of Springfield . [)~cg~D~~ J NOV - 9 2009 "::\1 }; MLM;sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall nol be reproduced in part or full and/or any part thereof be disclosed \'Vithout FE1 Testing & Inspection, Inc.'s written authorization. 7m NW ComeIIAvenue' Cavalfrs, Qegoo 97330, phme(541) 757-4698, fax (541) 757-2991 29540 BAirport Road, Eugene, Oregon 97402 . phme (541) 684;)849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 3824844 . fax (541) 382-4846 EWEB 500E. 4th Ave. Eugene, Oregon 97440 ~ftt 11:L'llml;"I~~'1:1;.IlIJl.IN. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION fJ( ~1;c-~ II ,;cal & C'AYlStnJdion ServicEs Compressive Strength of Concrete fASTM C 39\ PROJECT Hayden Bridge'Water i ,- Filtration Plant Expansion ~~:~~ [3.008-00225 11-04-09 2087168 6683 DATE PROJECT NO. REPORT NO. 25101 BPNO. 10-07-09 CAST BY A. Fenstermacher DATE RECEIVED 10-08-09. 4000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 40-SE7 .CEMENT MAX SIZE AGG. 3/4" Super; Eclipse; AEA AIR CONTENT 5.5% 1 TICKET NO. 3444076 SLUMP 8" 71" F YARDAGE 10.0 OF 10.0 TIME 12:45 PM 62. F WEATHER Clear SPECIMEN STORAGE ASTM C 31 Filter building 6" walls; southeast quadrant, west half of north and south walls; northwest quadrant, west half of walls. AVERAGE TEST AGE AREA WEIGHT TOTAL COMPRESSIVE STRENGTH TIME OF TYPE OF DATE (DAYSl (IN.'l (LBSI LOAD (LBSl STRENGTH (PSIl (PSI) TEST FRACTUREH 10-14-09 7 12.56 8.49 56195 4470 8:50 AM 2 11-04-09 28 12.56 8.48 69850 5560 10:55 AM 2 11-04-09 28 12.56 8.43 71070 5660 1- 5610 I' 11:00AM 2 Hold I I REMARKS: Jake Stucky (Wildish) was advised of on-site test results. "1- End Cones 2 - Cone/Split 3 -Columnar 4- Diagonal 5- Side (lOp or bottom) 6-Side (pointed top or bottom) Reviewed By: t1~e:r- Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (em ail) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield Knife River MLM:sc This report and/or enclosed lest data is the confidential property of the client to whom it is addressed and pertains to the speCific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing,& Inspection, lnc,'s written authorization. 750 rwJ Cornell Avenue. Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 29540 B Airport Road, Eugene, Oregon 97402 . phone (541) 684-3849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 3824844 . fax (541) 382-4846 ~ 6J..."....."'p...'.'..'p.'......'......J. ,.. ." .....t.. .. .....;~.. ':.;"::.. Page 1 of 1 1I:"'lmfl';.I\'~':';"IIIU..w.l Geoted1nical & Construc:OOn SeMoes Daily Field Report Client: EWEB 500E. 4th Ave. Eugene, Oregon Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon 2Y\61 \-\G.L\cUn 6n ~ Oate: Project No.: Report No.: Inspector: 10.No.: 11-03-09 2087168 E-24452 D. Delatte 1080867-88 ICC Inspection of: Reinforcing Steel Contractor: Wildish Building Weather: Clnside- _...., BP No.: 2008-00225' Continuous Inspection: 0 Periodic Inspection: 0 Performed preliminary inspection oDJhe. reinforciQg steei for two (2) inter tie tunnel walls._Reinforcingsteel was checked Jar grade, size;:-Iaps;-quantities,-Iocations, ties, ciear'ance and .supports~'-"A"JinaUnspection 'will D!l-:performed prior to concrete --~ ' - . . To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: Ih .. '" fiL ----- Michael ~.;J;r Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (em ail) Wildish Building Co.- Jake Stucky (em ail) City of Springfield -. MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the speCific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection. lnc.'s written authorization. 700 rwJ ComeII Avenue' CavaJrIS, Qegoo 97330. phone (541) 757-4698, fax (541) 757-2991 29540 BAirportRoad. Eugene, Qeg0097402. phone (541)684;)849 . fax (541)684-3851 . 62979 NE Plateau Drive, Sutte3' Bend, Oregon 97701. phone (541) 3824844. fax (541) 382-4846 ~ ~"''''t ~.rt Page 1 of 1 1'~'IItICl;.I~..'~;'IlII~.IH. Geotechnical & Construdion Services Daily Field Report Client: EWEB 500E. 4th Ave. Eugene, Oregon Project: Hayden Bridge Water Filtration 8Iant'Expansion-, . , ..0_. ..., 3'151 ~~rB~~ Oate: Project No.: Report No.: Inspector: 10 No.: 11-02-09 2087168 E-24455 A. Fenstermacher 5258882-49 ICC Inspection of: Reinforced Concrete Contractor: Wildish Building Weather: Partly Cloudy . BP No.: \2008:00225 / ~-- Continuous Inspection: 0 Periodic Inspection: 0 Pe.rformed final inspection on the reinforcing steel for filter building, east half of suspended slabs above 24" FW IBW pipes and center section of suspended walkway on west side. A preliminary inspection was performed on 10-30-09 (ref: FEI report E- 24445). Observed the placement of 18.0 yards of Knife River 4000 psi concrete (mix 40-SE7) into areas noted above. Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" compressive strength cylinders. Notified Jake Stucky (Wildish) of the on-site resuits. Slump - 8"; concrete temperature - 63F; air temperature - 48F; air content - 4.6%. To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: th. ~'Ar--- Michael L. Meyer Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 rwJ CaneIIAvenue' CavalfIS, Oregon 97330, phore(541) 757-4698' fax (541) 757-2991 29540 B Airport Road . Eugene, Qegoo 97402 . phone (541) 684;)849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701. phone (541) 3824844 . fax (541)382-4846 ---- ~ ~P..t .~tt Page 1 of 1 11:ll'IIIIC'l;<llf"~a.tIIIJ~1IW!I G:...,U:..,; " .;caJ & Construc:OOn Servire; Daily Field. Report Client: EWEB 500E. 4th Ave. Eugene, Oregon Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon oC\5l t-\rotc\en b'f1clgL Oate: Project No.: Report No.: Inspector: 10 No.: 1 0-30-09 2087168 E-24445 A. Fenstermacher 5258882-49 ICC Inspection of: Reinforcing Steel Contractor: Wildish Buiiding Weather: Overcast BP No.: r26~8,00225 Continuous Inspection:. 0 Periodic Inspection: 0 ~~ Performed. prelimina.ry in_~peclionori the reinforgjD9 -sieeCfor~ building east half suspended.slaos over 24" FW IBWpipes-anc{ center suspended walkway on the west side. ',Reinforcingsteel w..asc:.heck,:d'for~grade,..~ize; 'l<3ps;:,qiJ.?[ltiJiesi.~locations, ties, clearance-and supports. A final Inspection Will be performed pnor to concrete placement. To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: A.--/.~ Michael L. Me..;lr Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (em ail) OBEC- Pete Siocum (em ail) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield f{tj) ~~ a 'W ~r) lrLINOV - 9 2009 . J L - I MLM:sc This report andlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 700 rwJ Cornell Avenue. CavaJIis, Qegoo 97330, phone'(541) 757-4698, fax (541) 757-2991 29540 BftJrportRoad' Eugene, Qegoo 97402, phone (541) 684;)849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 3824844 . fax (541)382-4846