Loading...
HomeMy WebLinkAboutComments PWE 6/27/2008 Memorandum City of Springfield Subject: June 27, 2008 Liz Miller, Planner Jesse Jones, Civil Engineer DRC2008-00038, Alibi Tavern MDS Date: To: From: The Engineering Division has conducted a site visit and reviewed the materials provided with the subject application. The comments beiow are provided for your use in preparing the land-use decision. Please contact me with any questions. Site Description The subject site is located at 2422 and 2430 Main St.. The applicant is proposing an addition and remodel of the building. Finding: ~ursuant to Chapter 3.03.4.A of the City's Engineering Design Standards and Procedures Manual and Section 4.4 of Portland's Stormwater Management Manual, solid waste storage areas shan be covered and hydraulicany isolated from potential stormwater runoff, and directed to the sanitary sewer system. Recommended Condition: The applicant shall cover, hydraulically isolate, and drain to sanitary sewer, the solid waste storage area. Date Received: I; ./2...7/ D r PIl:\nner; LM . "~'t