HomeMy WebLinkAboutPermit Building 2001-11-5
~,
I
)
~
225 North Fifth Street
Springfield, OR 97477
.
.
I Job# 01-01115-01 I
Page 1 of 4
TRANS#;01-0007178
DATE:NOV 052001
AMT RECD:2 $ 5478,85
CHANGE:
CASHIER:061
CITY OF SPRINGFIELD, OREGON
RESIDENTIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 01-01115-01
Office: 726-3759
Inspection line: 726-3769
location Of Proposed Site: 6674 Moses Pass Spr
Assessors Map#: 17023411
lot: 91 Block: Addition: 2
Owner:
Address:
Tax lot #: 09100
Subdivision: levi Landing
Dennis Minium
Phone Number: 541-747-8495
City/State/Zip: Springfield, OR 97478
New Value: $126,336
Scope Of Work: Single Family Residence
8745 Thurston Road
Contractor Type
General Contr
Electrical Contr
Mechanical Contr
Plumbing Contr
SFR same as 01-00648-01 6681 Simeon Ct
Contractor
Registration # Expiration Date ~ Phone
62682 12/11/2001 ~~\J~ 541-747-8495
:{"\~ 'fO~\J\
~Y".~ .\\\'
~~ r.;.((..'-" <:r.\J~
Antone Electric !(;. ~'r\:v ~ "\~,? ~ ::/~ 541-688-4444
~;~1: Snyder Road, Junction City, OR ...,O<\\C<-~~"\ S '0~()(,;.((.. ....Q}'f)
'''' c ~v a,(,;.() <' ,?
Elling a<r16(l(,\J~~ ,,.<(' ('6/~~!.2003
675 E 40Th. Eugene, OR 97405 'rV>~ ,..,c ,~ >(\;;
('.~,' . VI"
Don Lewis Plumbing 330f6, ./~"~ 6/10/2001
500 Greenfield Street, Eugene, OR 97404 ,.,
Dennis Minium
8745 Thurston Road, Springfield, OR
97478
541-688-1931
To request an inspection call the 24 hour recording at 726-3769, All inspections requested before 7:Q9
a,m, will be made the same working day, inspections requested after 7:00 a,m, will be made theJolI'dwinll
working day, r::..,5\lrci"o~ 'I:>\~\O~""
R . d I' ,,,,'l'l10 ()\0QJ,'0 5~n.r;J::J\'"
eqUlre nspectlon,s nO" \\'- '0"'- <">.':l~' 5-'
, 010'0 0 '0'\ \~\ 01'-'<' 1~\0
I BuildiOll 1 O~. /,.0 050 ~ ~0 ~O(\~
I t II d d t f t' d II f ' '-(~t' li!o.09 ~~ t' ,,,~QJ'th r;\ I ^('\ u/n(\ f d' ,
- ns a groun ro a 00 lng, an ca or Inspec Ion n conJuc Ion WI ,001 ng~anu or oun atlon I
-After trenches are excavated. ~\ ~'l'l \~\~; (,0(\~:r::J:S".~ c.Ol~.~0 '~,o'\"~
-After forms are erected but prior to COn~~tRlaCeD'~'n1. 0'O\'l>~.~0 'I:>\~~\.~"\'
-Prior to floor insulation or decking. ~o\oIj 1'-~9J>:J,,) ~'l>'!c.0(\\0 \0~0(\ :~,?>'I:
-Prior to decking. \(\0 !).-(O ~\Y;\0 ~00 \.'000
-Prior to cover. oo~ c.-8:0\\<::' 0\\0\ /,.0\\5
-Before covering sheathing with finish materials..>~'(j (,0<::'
- Prior to cover. \\
- Prior to Cover
- Prior to taping,
- When all required inspections have been approved and the building is complete.
Verify Ground Rod
Footing
Foundation
Post and Beam
Floor Insulation
Ceiling Insulation
Shear Wall Nailing
Framing
Wall Insulation
Drywall
Final Building
Temporary Power
I Electrical - -I
-Approval required prior to SUB energizing pole.
Street Improvement: Fully Improved
Curb Cut?~ Improvement Agr.?O
San Sewer Depth (Ft): 6 4
Storm Sewer Available? ~
Special Req.:
Security Required:
Bond Begin DateTime:
Special Instructions:
Other Utilities:
...
~.
Rough Electrical
Electrical Service
Final Electrical
Underfloor Plumbing
Underfloor Drain
Rough Plumbing
Water line
Sanitary Sewer line
Sanitary Sewer Cap
Final Plumbing
Underfloor Mechanical
Rough Gas
Rough Mechanical
Gas Service
Final Gas
Final Mechanical
SW-Curbside
CC-Standard
Project Supervisor:
.
.
I Job# 01-01115-01 I
Required Inspections
Electrical
Page 2 of 4
- Prior to cover,
-Must be approved to obtain permanent power.
-When all electrical work is complete,
I Plumbing
- Prior to insulation or decking,
- Prior to cover or placement of concrete.
- Prior to cover.
- Prior to filling trench,
- Prior to filling trench.
-Capped within five feet of the property line and capped with an approved material as required b
-When all plumbing work is complete,
I ., Mechanical --I
- Prior to insulation or decking.
- Prior to cover,
-After line is installed and line has been connected to a minimum of one appliance. Pressure tel
- When all gas work is complete,
- When all mechanical work is complete,
:- -. PublicWorks~--1
- After forms are erected but prior to placement of concrete
- After forms are erected but prior to placement of concrete
Sidewalk Type:
Additional ROW?
Size Of line (in):
Downspouts/Drains:
Enchroachment Permit:
Curbside - 5'
o
8
To Curb and Gutter
San Sewer Tee (in): 6
00/00/0000 00:00 AM Bond End DateTime: 00/00/000000:00 AM
NO OCCUPANCY OR SEWER HOOKUP UNTIL CITY ACCEPTS INFRA~
Types Of Warning Devices Reqd.
Zoning: LDR
FloodPlain? 0 Wetlands? 0
Journal numbers
1:
Comments:
Overlay District:
# of Street Trees:
land Use: Single Family Dwelling
Pave Driveway? ~
2
2:
3:
Additional Requirements:
Required Attachments:
Source Locn:
Material:
Planner: Sam Gollah
Urban Growth Boundary?O Glenwood Area? 0
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA: X-Light Gray
Flood Plain FEMA: 1167 Of 2975
~
.
"
J
Construction Types:(VN) Wood Frame
Occupancy Groups: Dwelling
# Of Buildings: 1
# Of Bedrooms: 3
Handicap Access? D
rArea (Sq. Feet)
Main: 1480 Accessory~OO
Fee
Hourly Plan Review
Total Plan Check
Building Permit
State Surcharge For Building Permit
Building Administrative Fee
Total Building
Minimum Electrical Permit Fee
Wiring Footage 1,000 Sq Ft or less
Wiring Footage Each Add') 500 Sq Ft
Temporary: 200 Amps or Less
State Surcharge. Electrical
Administrative Fee - Electrical
Total Electrical
Minimum Plumbing Permit Fee
Two Bathrooms
State Surcharge. Plumbing
Administrative Fee. Plumbing
Total Plumbing
Hood and Exhaust
One to Four Outlets
Minimum Mechanical Permit
Administrative Fee - Mechanical
Less than 100,000 BTU
Vent Fan to One Duct
Dryer Vent
Mechanical Issuance
State Surcharge. Mechanical
Total Mechanical
New Sidewalk
New Curbcut
Multiple Permit Discount. 2nd Permit
Tolal Public Works
Residential - Single Family - Storm
Residential Improvement MWMC
Job# 01-01115-01 I
.
Accessory Structure
# Of Stories: 1 Height (feet): 19
Current Units: Proposed Units:l
Census Code: New SF . detached
Total:1880
Paid On Receipt#
Plan Check
10/10/2001 6949
Building
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
Electrical
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
Plumbin!l
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
Mechanical
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
Public Works
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
Svstem Development
11/05/2001 7178
11/05/2001 7178
Value/Quantity
Page 3 of 4
Fee Amount
2
$90,00
$90.00
126,336
$653.40
$45,74
$52,27
$751.41
1
2
1
$,00
$106,00
$38,00
$50,00
$13,58
$15,52
$223.10
1
$,00
$254,00
$17,78
$20,32
$292.10
1
1
$9,00
$4,00
$.00
$3.92
$12.00
$18,00
$6,00
$10.00
$3.43
$66.35
1
3
1
75
1
1
$65,00
$65,00
$-30,00
$100.00
3,438
1
$938.44
$34,83
..'
."
.
Job# 01-01115-01 I
Paid On Receipt#
System Development
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
11/05/2001 7178
.
Page 4 of 4
Value/Quantity Fee Amount
I
/~'
Fee
MWMC Administrative Fee
SDC Administrative Fee
Residential Sanitary MWMC
Residential - Improvement
Residential - Reimbursement
Sanitary Sewer SDC Reimbursement
Sanitary Sewer SDC Improvement
Total System Development
1 $10,00
$142,28
1 $332.86
1 $659.76
1 $155,13
19 $406,03
19 $308,56
$2,987.89
S,F. Residence - Willamalane
Total Willamalane SDC
Willamalane SDC
11/05/2001 7178
1
$1,000,00
$1,000.00
Planning Plan Review
Total Planning
Planninll
11/05/2001 7178
1
$50.00
$50.00
Address Assignment
Total Permits w/o Srchg
Grand Total
Plan Check Type
Permits w/o Srchll
11/05/2001 7178
1
$8.00
$8.00
$5,568.85
Checked By
Date Completed
Comment
Initial Review-Res
Lisa Hopper
Steve Templin
10/12/2001
10/19/2001
NO OCCUPANCY OR SEWER HOOKUP
UNTIL CITY ACCEPTS INFRASTRUCTURE
Engineering-Res
Planning-Res
Structural-Res
Sam Gollah
10/23/2001
10/22/2001
Tom Marx
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701,055 will be used on
this project.
I further agree to ensure t all required inspections are requested at the proper time, that each
address is readab om th street, that the permit card is located at the front of the property, and the J
approved set plans will r main)O ..J.~ite ~ all times during construction, /
. ~ If c:;/o{
Signature ore /