INSPECTION REPORT FORM
CLIENT NAME Breeden Bros., Inc.
JOB # 78- 1564
I
I'
I:
LOCATION River Hills Subdivision, 724 Montview Way DATE November 1 & 3. 1985
Weather Cond: Cloudy, Cool
Workmen: John Pickett, backhoe operator
Layout carpenter
11/1'- Excavation progressed to remove topsoil to expose previOUS bar-run
trench backfill under footing walls. Trench backfill was previously
placed in 1978 under program recommended by this firm and J.Q.
Tompkins, engineering geologist.
Builder proposed that previously excavated lower level garage and
family room to be coris tructed on slab on grade be ra i sed on'e foot.
Backfill of bar-run material was recommended as base for, slab pours,
11/3 - Bar-run backfill placed and compacted'in lower slab level. A
crushed rock or pea gravel ,levelling course is recommended to fill
voids prior to concrete pour.. ",',
Assure that all footing sections bear on bar-run trench backfill
areas. Compact surface of open graded material prior to footing
pour.
,"
I
,
~~;~:n~~
~
.
Schaudi, Siemm & Wild, Inc,
.
CONSULTING ENGINEERS, SUflVEYORS AND PLANNERS
3aa High Street
503/485-8383
Eugene, Oregon 97401
INSPECTION REPORT FORM
CLIENT NAME Breeden Bros., Inc,
JOB If 78-1564
LOCATION River Hills Subdivision, 724 Montview Wa'l DATE November 1 & 3. 1985
Weather Cond: ,Cloudy, Cool
Workmen: John Pickett, backhoe operator
Layout carpenter
11/1' - Excavation progressed to remove topsoil to expose previous bar-run
trench backfill under footing walls. Trench backfill was previously
placed in 1978 under program recommended by this firm and J.Q.
Tompkins, engineering geologist.
Builder proposed that previously excavated lower level garage and
family room tO,be constructed on slab on grade be raised one foot.
Backfill of bar-run material was recommended as base for, slab pours.
11/3 - Bar-run backfill placed and compacted'in lower slab level. A
crushed rock or pea gravellevell ing course is recommended to fill
voids prior to concrete pour.. ,,',
Assure
areas.
pour.
that all footing sections bear on bar-run trehch backfill
Compact surface of open graded material prior to footing
,"