HomeMy WebLinkAboutPermit Building 1996-9-23
.
COMM ERCIALlIN DUSTRIAL
PERMIT APPLICATION
SPRINGFIELD
225 Fifth Street, Springfieid, Oregon 97477
ASSESSORS MAP'
NEW
REMODEL
-,
JOB NUMBER \J.\ t ()\(~.r "1-
INSPECTION LINE: 726.3769
OFFICE: 726,3759
TAX LOT' rn'l.W
t<.1\-< [~~ , . ~I'I
PHONE:~nt" ~
-
ZIP~1-
"'-. IS
-Si~..
V:~~ENE !'-i .~
NAME
ADDRESS
DEMOLISH OTHER '
I
In
I
I
I
1
1
,.
I
1
I
I
I TOTAL PERMIT
ARCHITECT'
GENERAL:
PLUMBING:
MECHANICA"
ELECTRICAl'
PLUMBING
NO,
FEE
CHARGE
Single Fixture
Relocated Bldg.
(new fix. addtll
Water Service
ft.
Sanitary Sewer
It.
Storm Sewer
It.
Backflow Device
TOTAL PERMIT
- OFFICE USE -
QUAD AREA:
. OF BLDGS:
LAN D USE:
" OF UNIT~'
OCCY GROUP'
CONSTR. TYPF'
HEAT SOURCE:
. OF STORIES:
SQ, FT,
S/SQ. FT,
SQ. FTG MAl N
x
SQ. FTG ACCESS
x
SQ. FTG OTHER
x
PLAN CHECK FEF
RCPT*
OATF
I DEMOLITION
-
I BUILDING PERMIT
15% Slate
Surcharac
I r~[~, ,,,rJJS'kL 3Ub
15% Slate
Surcharae
I PAVI NG
I fjf.{~ y..;
&- l. lQ)
1.?,Q9
I PLUMBING
5% State
Surcharqe
FENCE
VALUE ~
SIDEWAL~
FT,
I CURB CUT
FT,
CONST,
CO TRACTOR' EXPIRES PHONE
61-lJ1p l/21p.(17 ,54/711'7713
MECHANICAL
j
Cl:iARClJ
I
I
j
I
FFF
Furnace/burner & vent
< 100,000 BTUs
Furnacel burner & vent
> 100,000 BTUs
Flqor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationaryevap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanicar exhaust
hood and duct
Permit Issuance
$10,00
HANDICAP ACCESS:
FLOOD PLAIN'
lONING'
LIGHTING POWER BUDGET:
WATER HEATER:
VALUE
TOTAL VALUE OF PROJECT
IfYJj)ff) CO
t -
BY
SUBTOTAL
PERMITS
SYSTEMS
. DEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
4\p~ .\o~
ill
.
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, carr
726-3769 (recorder), state your City designated job number, Job address, type of inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
I
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and a/l pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S,1. (306 a,1)
STRUCTU RAL WELDS:
Performed on the job, (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board Interior wall covering is
applied,
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a,6)
SPRAYED ON
FIREPROOFING: U.B,C,
Standards 43.8.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is In
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU-LAM BEAMS: inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed, (2501 U.B.c,
STDS, 25-10,11),
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing,
STRUCTURAL MASONRY: (306
. a,7)
v
MASONRY: Steel location,
bond beams groutlng or
verticals in accordance with
UBC 2415,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material in
place.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
*In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
-------------------------------------------------------
FINAL MECHANICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
~"~:;G~ ~
FINAL PLUMBING
FINAL ELECTRICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMEN~ ~-'~ -\- ~6~P-
PLANS REVIEWED BY
DAT"
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
Date
AMOUNT RECE).~n' 4\01. (dt
RECEIPT' CJ.:'):-J,,':{) .
DATE PAID:_~ q ;.r~'YIfL-
RECEIVED B;:~'