Loading...
HomeMy WebLinkAboutNotes, Work PLANNER 9/4/2009 " [City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 LAND DIVISION PLAT PRE-SUBMITTAL CHECKLIST Partition Project Name: Geoff Cossen Partition Project Proposal: Partition a residential lot into two LDR parcels Case Number: PRE2009-00023 Project Address: 2660 G Street Assessors Map and Tax Lot Number(s): 17-03-36-11, TL 9100 Zoning: Low Density Residential (LDR) Overlay District(s): Drinking Water Protection (DWP) Applicable Refinement Plan: Refinement Plan Designation: Metro Plan Designation: Low Density Residential (LDR) Tentative Decision Date: February 27, 2009 Pre-Submittal Meeting Date: September 4, 2009 Application Submittal Deadline: March 3, 2010 Associated Applications: ZON2008-00076; SUB2009-00003; DRC2009-00002 rCI:W1106SP.RINGf:IELDJDEVEI!O~MENiTilREVIEWmEAMJiIl~h'!1':gc[~l!"":::J,;~,:"0,.::;'~1~1"'W~~~;t;~.":;1 I POSITION I REVIEW OF NAME PHONE I I Proiect Planner Land Use PlanninqAndy Limbird 726-3784 I Transportation EIT I Transportation Jon Driscoll 726-3679 I Public Works Civil Enqineer I Utilities Clayton McEachern 736-1036 I Public Works Civil Enqineer . Sanitary & Storm Sewer Clayton McEachern 736-1036 I I Deputy Fire Marshal Fire and Life Safety Gilbert Gordon I 726-2293 I i Community Services Manaqer Buildinq Dave Puent I 726-3668 I nA~~LIGANm~S;IDEv.EI!OeMENTiBREVIEWl;,T:EAM_;'~\1ij!"{~~..~"'lir~~~~1tllm Applicant/Owner Surveyor Geoff Cossen Joe Ferguson 335 E. 50th Avenue Joseph Ferguson Professional Land Surveyor Eugene, OR 97405 2130 Daphne Street Sprinqfield, OR 97477 9/2/2009 Dale Neceived:_fH/;"'" Planner: AL R 1 of 8 The items needed to make the application complete for review are incorporated below. NOTE: .. Conditions of Approval - taken from Notice of Decision dated: 2/27/2009 . Applicant Response - taken from: written statement submitted with pre-submittal application 8/27/2009 Condition #1: Prior to approval of the Final Plat, the applicant shall obtain a variance for the Parcell north-south street frontage pursuant to Planning Action DRC2009- 00002. The variance must establish a 45-foot frontage for Parcell on 26th Street, where 60 feet is required. Applicant Response: The variance was approved on 2/27/09, Case No. DRC2009-00002. Staff Finding: Satisfied. Condition #2: Prior to or concurrent with approval of the Final Plat, the applicant shall execute and record a public sidewalk easement for the western five feet of Parcels 1 and 2. Applicant Response: The dedication of this easement is on the face of the plat. Staff Finding: Satisfied. Condition #3: Prior to or concurrent with approval of the Final Plat, the applicant shall execute and record a public right-of-way dedication for the southern five feet of Parcel 1 as generally depicted on the tentative plan. Applicant Response: The dedication of this right-of-way is on the face of the plat. Staff Finding: Satisfied. Condition #4: Prior to issuance of occupancy for a dwelling on Parcell, a 5-foot wide curbside sidewalk shall be constructed along the entire G Street frontage of Parcel 1. The sidewalk shall be constructed to City Standards and connect with the existing sidewalk at the intersection of 26th and G Streets. Applicant Response: This will be done with building construction, prior to issuance of an occupancy permit, as noted in the condition. ' , ' St"aff Finding: Pending. Confirmation of sidewalk installation Will be done when building inspections are nearing conclusion. Condition #5: Prior to approval of the Final Plat, at least three street trees shall be installed along the 26th Street frontage of Parcels 1 and 2 as generally depicted on the tentative plan. Applicant Response: A bond or deposit will be posted with the City prior to final plat approval. Staff Finding: Pending. A deposit of $250 for each required street tree can be submitted to the City and the funds will be placed in escrow. Upon completion of the tree planting, the applicant can request refund of the deposit, and the City will inspect the site to confirm street tree installation. 9/2/2009 Date Received: Planner: AL f/'//Jn1 , I 2 of 8 Condition #6: Prior to issuance of occupancy for a dwelling on Parcell, at least two street trees shall be installed along the G Street frontage of the property. Applicant Response: This will be done prior to issuance of an occupancy permit, as noted in the language in the condition. Staff Finding: Pending. . See comment above regarding street tree deposits. Condition #7: Prior to approval of the Final Plat, the applicant shan execute and record an Improvement Agreement for 26th Street for sidewalk and street lighting improvements. . Applicant Response: Draft Improvement Agreements are submitted with this application. Staff Finding: Partially satisfied. The Improvement Agreement should be printed on legal size paper and executed by the property owner/applicant prior to submittal of the final Plat. Condition #8: Prior to approval of the Final Plat, the applicant shall execute and record an Improvement Agreement for G Street for street trees and street lighting improvements. Applicant Response: Draft Improvement Agreements are submitted with this application Staff Finding: Partially Satisfied. See comments in #7 above. Condition #9: Prior to approval of the Final Plat, the applicant shan obtain necessary permits and install private sanitary sewer lines to serve. Parcel 2 and the dwelling on Tax Lot 9200 as generally depicted on the tentative plan. Applicant Response: The sewer lateral lines have been permitted, constructed, and inspected by City staff. The new laterals have been connected to the public sewer by the City's contractor. Staff Finding: Satisfied. Condition #10: Prior to or concurrent with approval of the Final Plat, the applicant shall execute and ,:ecord a 5-foot wide private sewer easement to benefit Parcel 2 and Tax Lot 9200 as generally depicted on the tentative plan. Applicant Response: Draft easements are included with this application and shown and referenced on the plat. Staff Finding: Satisfied. Condition #11: Prior to approval of the Final Plat, the applicant shall coordinate with SUB Electric and other utility providers as may be necessary to relocate private utility lines serving the existing dwelling on Parcel 2, including but not limited to electrical power, telephone, and cable TV. Applicant Response: The conduits are in place, waiting final plat approval to switch over to the new underground lines. Location and construction was' coordinated with SUB. Staff Finding: Partially Satisfied. New electrical meter box and conduit appears to be installed. However, property owner does not have to await final platting for installation to occur. 9{2{2009 Date Heceived: '1/'1 / ~ 'f Planner: AL I I 3 of 8 Condition #12: Prior to approval of the Final Plat, the applicant shall obtain necessary permits and install the underground utility lines serving Parcels 1 'and 2 to the satisfaction of the utility providers. In accordance with the applicant's project narrative and SDC 4.3-125, all utility lines shall be placed underground. Applicant Response: The conduits are in place, waiting final plat review to install the new underground lines. Location and construction was coordinated with SUB. Staff Finding: Partially Satisfied. See comments in #11 above. Condition #13: Prior to or concurrent with approval of the Final Plat, the applicant shall execute and record a suitable utility easement across the Parcell "panhandle" extension for the benefit of Parcels 1 and 2. Applicant Response: Draft easement is included with this application and shown and referenced on the plat. Staff Finding: Satisfied. Condition #14: Prior to approval of the Final Plat, the applicant shall obtain necessary permits and install the water service for Parcell as generally depicted on the tentative plan. Applicant Response: SUB has agreed to locating the service from their line in 26th Street as shown on the tentative plan. Installation is waiting for the approval of the final plat. Staff Finding: Satisfied. Condition #15: Prior to or concurrent with approval of the Final Plat, the applicant shall execute and record a 5-foot wide Public Utility Easement along the west side of Parcel 2; and along the west, south and east sides of Parcell as generally depicted on the tentative plan. Applicant Response: Easements are created on the face of the plat. Staff Finding: Satisfied. Condition #16: Prior to issuance of Final Occupancy for any dwelling on Parcel 1, at least two paved off-street parking spaces shall be developed on the site for each dwelling unit. Applicant Response: Two spaces, one for each unit, will.be located in the driveway. Two spaces, one for each unit and separated by a wall, will be inside the garage. This will be completed prior to issuance of an occupancy permit, as noted in the language in the condition. Staff Finding: Satisfied. Staff will confirm driveway construction and paving prior to occupancy. 9{2{2009 Date Received:~/"" Planner: AL 4 of 8 Condition #17: Prior to approval of the Final Plat, the applicant shall obtain necessary permits and install a paved residential driveway off 26th Street to serve Parcel 2 as . generally depicted on the tentative plan. Unused portions of the oversize curb cut shall.bereplaced with verticalface curb and gutter in accordance with City . standards. Applicant Response: The driveway has been permitted, constructed and inspected by the City. Staff Finding: Satisfied. Condition #18: Prior to approval of the Final Plat, the applicant shall obtain necessary permits and replace the curb cut and driveway approach located near the midpoint of the south property line of Parcell with vertical face curb, gutter, sidewalk, and planter strip (as appropriate). Applicant Response: A bond or deposit will be placed with the City so that this curb cut can be used during construction of the duplex and removed/replaced concurrent with the other concrete work on Parcell (driveway and apron, garage floor, and sidewalk along G'Street). Staff Finding: Partially satisfied. Applicant shall coordinate with Public Works on this issue. Separate encroachment permits and paving deposits maybe required for both the new and existing driveways to facilitate this request. Condition #19: The applicant shall provide and maintain adequate vision clearance triangles at the corners of the site driveways in accordance with SDC 4.2-130, including but not limited to proper placement of street trees and other on-site vegetation to ensure vision clearance areas are unobstructed. Applicant Response: VCTs will be maintained at driveway corners andat the intersection of 26th Street and G Street. Staff Finding: Satisfied. Condition #20: Prior to or concurrent with approval of the Final Plat, the applicant shall install new addressing numbers on the existing house to represent its address assignment on 26th Street. Applicant Response: This will be done prior to final plat approval. Lisa Hopper has been contacted. Staff Finding: Satisfied. Heads Up Comments: 1.. \ 9{2{2009 Date Received: fA! J...., 1 Planner: AL 50fB THIS APPLICATIQN IS: o COMPLETE FOR PROCESSING . . . ~_INCOMPLETE AND .NEEDS MISSING INFORMATION NOTED ABOVE City Planner Date THIS IS NOT A DECISION ON THE PI!AT. The plat pre-submittal meeting shall be held within one year of the date of the Land Division Tentative approval. A complete Land Division Plat application shall be submitted within 180 days of the pre-submittal meeting. If the applicant has not submitted the Land Division Plat application within these time frames, the Land Division Tentative approval shall become null and void and re-submittal of the Land Division Tentative application shall be required per SDC 5.2-140. I, the owner/applicant, intend to submit all missing items indicated herein to the City within the ISO-day timeline. Owner/Applicant's Signature. Date 9{2{2009 Date Received: Planner: AL 1/'1/JP'I { 6 of 8 Land Division Plat Applic'~tion Process (see next page for a diagram of this process) 1. Applicant Submits a Land Division Plat Application for Pre-Submittal - ".- The' application must conform to the Land Division Plat Pre-Submittal Requirements Checklist on pages 5 & 6 of this application packet. . The purpose of pre-submittal is to ensure the applicant has all items necessary for a complete submittal. . A pre-submittal meeting to discuss completeness is mandatory., . Pre-submittal meetings are conducted every Tuesday and Friday, from 10:00am - noon. . We strive to conduct the pre-submittal meetings within five to seven working days of receiving the application. . 2. Applicant and the City Conduct the Pre-Submittal Meeting . The applicant, owner, and design team are strongly encouraged to attend the pre- submittal meeting. . The meeting is held with representatives from Public Works Engineering and Transportation, Community Services (Building), Fire Marshall's office, and the Planning Division. . The meeting is scheduled for 30 to 60 minutes. . The Planner provides the applicant with a Pre-Submittal Checklist at the end of the meeting specifying the items required to make the application complete if it is not already complete. . The applicant will then have 180 days to make the application complete for submittal and acceptance by the City. 3. Applicant Submits a Complete Land Division Plat Application . When the applicant has addressed all items on the Pre-Submittal Checklist" and the City Surveying Section has notified the applicant's surveyor that the plat and other documents are sufficiently refined, the applicant can submit a complete application to the City Survey Section located in the NW Quad of City Hall. . The application must conform to the Land Division Plat Submittal Requirements Checklist on page 6 of this application packet. . If the submittal is deemed complete, the City Survey Section will sign-off on the City Survey approval sheet and send the applicant to the Development Services Department for application submittal and fee collection. . Planning staff checks and signs the mylars. 4. Applicant Records Plat at Lane County &. Submits Plat and Documents to City . After Planning staff checks and signs the mylars, the plat may then be recorded by the applicant's surveyor at Lane County. ' . After plat has been recorded at Lane County, applicant submits five (5) recorded, rolled paper copies of the plat and three (3) copies of required documents to the Development Services Department prior to the issuance of building permits. Date Received:--1/'1/~ L- Planner: AL , LAND DIVISION PLAT APPLICATION PROCESS , Applicant submits land division plat application for pre-s'ubmittal (See Land Division Plat Pre-Submittal Requirements Checklist) 1 City departments review application for completeness and hold pre-submittal meeting to discuss completeness issues with applicant and applicant's representatives. ~~ Applicant addresses incomplete items. I City Surveyor checks application and returns comments to applicant's surveyor. ~ -. ~ 1 City Surveyor conducts field check and .1 returns comments to applICant's surveyor / Applicant's surveyor corrects plat and returns to City Surveyor. Applicant's surveyor sets new monuments and flags existing ones. 1 Once no errors appear on the plat and a current title report is submitted, applicant's surveyor is given ok to submit complete land division plat application. 1 -- After ok given from City Surveyor and applicant has addressed all incomplete items from pre-submittal, applicant submits complete application to the City Survey Section (See Land Division Plat Submittal Requirements Checklist) 1 City Survey Section signs-off on City Survey approval sheet and sends the applicant to the Development Services Department for application submittal anq fee collection. 1 . Planning staff checks and signs mylars and notifies applicant's surveyor of approval. 1 Applicant takes plat and accompanying documents to Lane County for recording. 1 Applicant brings copies of recorded plat and documents to Development Services Department. Date Received: 'f/r/Jn.,'. Planner: AL . Revi?ed 9{26{07 Molly Markarian 8 of 8