HomeMy WebLinkAboutPermit Building 1988-3-8
-.-,"'-,......-.>...... ~- . ..' -..- _ '. ...",.
. _ _.... _....._....,... ~ .~......~__.~."', _....~.,..'i............._."'-_~......-.,...,
Rcce~pt !I-
.,
)(()KI
.. RESI~T1Al"
, APPLICA_/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
-=#= 4 f{
1
Job Location:
1d;203
/70"<.
CJrlaUr.-
3~ c//
o ~?fJlJ
AsoesBo1'3 Map #
Subdivision:
Tax Lot #
Q.mel':
G ~ _Leii~
a.-J!. / / \.:p:- ,
s;Jtoo l- 4At1M Phone:
\ I)"G
Address:
City:
n
n
n
NPJ,J
Additicn
Remodel
rn"'!Obi le Home
,(
Date of Application
3--8-:-ft
(;ontractors
~
~
\1)/
Zip:
'~-Mlv
. )J1 ff s;y- rr
""111'0 ~
GC/ ,~
Sigr.ed:
Date:
-?'1:5 - [{>f
Value
Address
Lise. 1/
Eroires
Phone
GeneraL ~~ cr ~'
PLumbing (XU rt...eA.-/
ELectricaL (LtA...ln~ ~../
/4schar.ical
Constl"t.lction LeMel'
It is ths respontrtbility of ths permit holder to see that all innpectioM are made at ths proper tim~, that each ~e8s is readabZe
fraom ths street, and that the pormit caN is 1.ocated at the front of the propePt:y.
-Bui!ding Dividor: approved plan shall remain on tM Building Sits at all times.
PROCSDURE FOR INSPECTION RE:OVEST:CALL 726-3769 (recorder) state your City designated job number, job adiress, type of in3pecticn
l'aqucsted and when you win be ready for inspcction, Contractors or OI.mers name and phone number. Requests received before 7:00 ar.I
..."ill be made th~ same day, requests made after 7:00 am will be made the next :JOrking day.
Reauiped InSD~~ticns
o
o
SITE INSPECTION: To be maae after
excavation, but prior tc Set up of
forms.
UNDERSLAB PLUI.fflINr., ELECTRTCAL &
: MECHANICAL: To be made befoI'e any
work is ..:zovcred.
o
FOOTING & FOUNDATION: To be mads
after trenches are excavated and
forms are erected, but priOI' to
pouring ccncret.:z.
o
UNDERG80UND PLUMBING; SEWE:R. W.1TE.1J.,
DRAINAGE: To be made prior to fil-
,Zing trenches.
O UlIDERFWOR PWUBING & MECHANICAL:
, To be made prior to installation of
. floor insulation or decking.
O POST AND BEAM: To be made prior to
instal.kltion of flool" insz:.lation or
, decking.
D ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No work is to be cotJered
.until these inspections have beer.
made and approved.
O FIREPLACE: Prior to pZacir.g facing
materials and before framing inspec-
tion.
O FRAl-1INC: Must bs requer;ted after
approval of rough plwr.bing, electri-
cal & mechanical. All roofing
bracing & chirrmcY8~ et.:;!. 11T'..lst be
:' completed. No work is to be con-
. ~ ..;.cealed until thio iMpection has
~ b6~ made and approved.
,",--.
D FIliAL PWMBIIIG
D FINAL MECHANICAL
D FINAL ELECTRICAL
10
o
Your City Desigr.ated Job Number 10:
O INSULATION/VAPOR BARRIER fNSPECTION:
To be made after all insulation a."'.d
'. required vapor barriers are in place
. . but before any lath, gypswn board or
u:zll covering is applied, and before
. any inaulation is eonceal.ed.
fS[sO/99
I DE,'.fOLITION OR :'.,'OVED BUILDIiiCS
=:J SanitaJ'Y se'..Jer ::!apped at p~op~r~:J' lir:e
.=J Septi:1 tank fT.....?cd and filZe~ z.Jith gra~e7..
o
-, Final - fl'hen above ite.'7fs are cempleted
~ and when demolition is complete or stru~-
ture moved and premises cleaned up.
DRYWALL INSPECTION: Tc be made
after all drywall is in place,
but prior to any taping.
O MASONRY: Steel location, bond
beam3, grouting or verticals in
accordance with U.B.C. Section IMoqile Hemes
2415.
O WOODSTOVE: After iMtal.1.ation is ~O 8- Blocking and Set-up
~l.e~. I ? .
~ ~ P/"umb1-1'l{J connectt.ons -- sewer ~ water
O CURB & APPROACH APRON: After forms p Electrical Connection - Blocking, set-up
are cre:1ted but prior to pouring~) and plumbing connections rrr...st 1;e approved
oonarete. .' before requesting elec-;rical inspec-;ion
D SIDEWALK & DRIVEWAY: For all con-:::J . .
crete paving within street right- Accessory Bu1-L:~ng
of-way, to be made after all exca-
vating c~let~ & form work & sub- Winal _ After porcr..es, skirting, decks,
base matel'1.al 1-n. pla:1e. > %" ~tc. are complet~d.
O PENCE: When compl~te -- Provide.
gates or movable sections through
P.U.E.
o
o
I
-1
All. project conditions, ouch as the installation of street trees, ca~letion of the
l'equired landscc:pi7".g, etc. ~ must be satisfied before the BUILDING FINAL can be requestad.
FINAL BUILDING: The Final Bui'Lding Inspection must be requested after the Final PlwnbiP1:J
Electrical, and Mechanical Inspectio11iJ kava been made and approved.
I4ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fENT TO BE MADE AT NO COST TO CITY I Page 1 of 2 I
JOB NO. x-f~ )tfr;
I Zone:
Lot Sq. Ftg.
S , f lot CJlJerag<
!I- of Sto1'i8S
Total Height
T_t''''';j~ "'t'hy
SOLAR 'jiESS
Occu.pancl./ c.
WT TYPE
Interior
Corner
Panhandle
Cut-de-saa
ITEM SQ.FTG X I Value
Main
Ga:r<aae I
Carool't I
Acc8ss0ru I
I
TOTAL VALUE I
Is.D.c. fval.UC) I
1.5 :r
Bui lding Perrrri. t
State Sla'charge
Total Cha.~ges
lITEM I NO. I FEE
F1.:rtures
I Reeidential 11 bath) I I
!sanitary Sewer I I
I Wate1'" I I
I I
Plumbing Pe"". t
State Surcr..apge
Total Charaes
lITEM 1110., FEE
Res. Sa. fta.
Nmu/Ertend C1.l'CU1.ts I I
I Temporary Service I I
I I
Ele~trical Permit
State Sur~harqe
Total Chm>ces
lITEM
I Furnace !!TV'S
I E::haust Hood
I Vent Fan
I WoOdStOV8
1110'1
I I
I I
I I
I 1
Pemt Issuance
Hechanica.l Permit
State Surcharac
Total ~0~'!
I -- Eii!:loACHMENT --
I Sec-mttl Daoosit
I Storage
I Main te1Ul'rl.:!R
lpcrrrrit
I Total Chal'Ql!S
I Curbcut
I Sidmva lk
Il'en:Je
l Electrica l Labs Z.
I Nolri te Home
i
I
I TOTAL AMOUNT DUE:'
I
/ Cf 3,;2. 4-1
I
::'/('1_ I
I
CHARGE
FSE
I
I
1/5.~f)
I .75
1/5.751.
I CHARGE I
i I
I
I
I
/"'\.00 I
7S
11.5 -'7.'5' .
I CIIARGE
I
I
I
I z.1() I
cD5 .00 I
/ ' ;;(51
I
67,1~'
Page 2
REQ.-
L-COG~
Type/Cor.st: . Bedrooms:
II EnerGY SO".J.rces
Setbacks I Heat
House Caraqe I Access. I I Watel" !If?atPl''
I Range
I Firev Lace
I wooc/:; to".
I
I Lot Faces -
I
I P.L.
lIIorth
lEast
ISouth
IWest
Tu'Oe
Fees
Building Value & Permit
This permit is granted on the express condition that ths sa"id construction
shalL, in all respects, conform to the Ordinance adopted by the City of
Springfield, incZuding the Zoning Ordinance, regulating the ccnstl'Ucticn
and u~e of buildings, and m~y be suspended 01' revoked at cr.y time upon vio-
lation of any provisions of said Ordinances.
I.
I
I
1
I,
IPlan Check Fee:
I Date Paid:
I' R~cdpt #:
S<gned:
Plumbing Permit
No person shall construct, instaZl., alter 01' change any netJ 01' e::isting
plumbing 01' drainage system in whoLe or in part, unLess such person is the
legal possessor of a valid plumber's license, except that a pe:oson may do
plumbing work to property which is owned, leased or operattzd by the appli-
~t. ~
Electrical Permit
Where State LaLJ requires tr.at the electrical 'WOrk be done by an Electrical
Contractor, the electrical portion of this permit shall roOt be valid until
the Zabel has been signed by the Electrical Contractor.
Mechanical Permit
.
I.
I
I
r
I
I .
Pl.an Exarm.ner
vate
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all i~fo~tion hereon is truB and correct, and I
further certify that any ar.d all tJOrk perfoP:TIed shall be done in accor-
dance with the ()Pdinances of the City of Springfield, and the: u:p;s of tho
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be mde of any structure withou.t permission of the Building Di-
vision. I further certify that ~ly contPaCtors ar~ emp~yee8 who arB in
compliance with ORS 701.055 will be used on this project
~~
Signed
3 -f-f(
Date