HomeMy WebLinkAboutPermit Building 1991-5-7
./~"
...
-
CO M M ERCIAL/I N DUSTRIAL
PERMIT APPLICATION.
225 Fifth Street, Springfield, Oregon 97477
e
JOB NUMBER 31 () ~ R;S
SPRINGFIELD
~
INSPECTION LINE: 726.3769
OFFICE: 726,3759
LOCATION OF PROPOSED WORK: .1J50 MAIII/ tTRE..t:T
ASSESSORS MAP: .f7-(J':J-:J~ -4 j .
. TAX LOT' 413
OWNER' S'Yi'ANB r~
ADDRESS: ~o.<.::; ""RALDY \.A I-~vv I ANt-:
CITY: S?i?U\lf..FI t:= Lf) . STAT'" O"K' ZIP: S7"i'7'7
DESCRiPTION OF WORK: l;l,olc..cel-rlel"1t C"">t i,.';:r x' (..n' ,\cr-hile \-rDlI~ +~L..Oft\('I".
I
NEW;(>(J( REMODEL ADDITION
NAME
ARCHITECT'
'flr'-
I
DEMOLISH
PHONE:
7~c...- ~
OTHER
AODRESS
CONST.
CONTRACTOR'S NAME ADDRESS CONTRACTOR #
GENERAL: SvrANIB ~a; &td~ie~l(x~~ 7dk,~~t-'
PLUMBING:'St--eVf',<:;HiAI1L~II~ PO.l}-Sx'hSS:\ h~~_ t-..c;~;':;
MECHANICAL: 1'11', _
ELECTRICAL: 1 ~ Ai (c1e\'S (-- (l"ct, i (' -;:)R~\'(l'" ::J.() ... t::r-c.
PLUMBING
NO.
Single Fixture
Relocated Bldg.
(new fix. addtll
J Water Service
It.
Sanitary Sewer
It.
Storm Sewer
It.
FFF
Backflow Device
LJ1\n\:) II Q J
~
TOTAL PERMIT
QUAD AREA:
~~"-JW
'\
~0
\
. OF BLDG""
OCCY GROUP:
# OF STORIES:
SQ. FT.
SQ. FTG MAIN
SQ. FTG ACCES'"
SQ. FTG OTH ER
PLAN CHECK FEr
RCPP
.,.,...
I BUILDING P~IT
5% Slate
SurcharQe
MECHANICAL
\~ c:o
.15
I
r.H4RGF I
I
I
4f\~1
I
I
I
15.cO!
I
I
I
I
.55COI
VALUE:
PHONE
EXPIRES PHONE
~S/q';i ~"'AA
'I 04~"'~~
-'
MECHANICAL
NO
Furnace/burner & vent
<100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit Issuance
TOTAL PERMIT
- OFFICE USE -
LAND USE: ~ ~()O
.\
# OF UNITF'
CONSTR. TYP.'
HEAT SOURCE:
$/SQ. FT.
X
X
X
I PLUMBING
5% State
SurcharQe
FENCE
VALUE $
15% Slate I SIDEWALK
Surcharae _
I PA~~J\uJ. 8t>:~(\J:_N..&,1 CURBCUT
HANDICAP ACCESS:
"\8S-rfid ~
.".
I
~~I
I
I
I
I
I
I
I
I
I
$10.00 I
"I~
~(A
)~
FLOOD PLAIN'
ZONING: (\ .-C.-
fc
WATER HEATER'
LIGHTING POWER BUDGET:
?-
VALUE
TOTAL VALUE OF PROJECT
DAT.
BY
I 5~_OO'
~.1-t:;,.
I Ch!"&,<:.~ I
~!~
500
SUBTOTAL
PERMITS
I SYSTEMS
. DEVELOPMENT
FT.
FT.
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
Rq A_S J
J 5.0sl
S .'rl.5I'
I
I
16~.15
-
,/ REQUIRED INSPECTIONS
.
. ,
1 .''\.
It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspectIon, call
726-3769 (recorder), state your City desIgnated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the followIng work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pi pes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering is
applied.
\,/
UNDERGROUND: Plumbing,
electrical, g~S I ary sewer,
storm sewe, ater nd
drainage IIn. e made
prior to covering or filling
trenches. .
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to'plans:-
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing.
LATH ANOIOR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, Is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
finished.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
SIOEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material In
place.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
USC 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner! Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYEO ON
FIREPROOFING: U.SC.
Standards 43,8.
SPECIAL GRAOING,
EXCAVATION ANO FILLING:
During earthwork. (306 a.11 &
Chapter 29).
GLU,LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25,10,11).
v
STRUCTURAL MASONRY: (306
a.7)
rn 1-\ B\~ JJ! ~(I.t
<=t- \)\ rob
~ridL
v-
* In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENT""
/
PLANS REVIEWED BY
DATF
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with OAS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card Is located at the~ron f he property, and the approved set of plans will remain on the site at all
times during constructIOn.
Signature " ~ Dato \ ~d/q
- l .../' ~n/j,//7 AA./t'T'C/;?/'at(f1,7f.A/'hIV(}e/ / '/ <-
AMOUNT RECEiVED' 1~"3. '1'5 DATE PAID....::s. '}.cr (
RECEIPT': I '1' q ~ (0 RECEIVED SY: ~ _ )
VALIDATION:
v
..
.
CITY OF SPRINGFIELD
DATE OF Lt..."",
April 24, 1991
JOURNALNUKBER
91-04-49
APPLIcANT
Timothy D. Hovet, Operations Manager
Sycan B Corp.
~405 Baldy View Lane
Springfield,' OR 97477
PRO,,,,,,.! II..''''''
Sycan B Corp.
3405 Baldy View Lane
Springfield, OR 97477
-
I ~D 111cuA,v
Development Services Department
EXPLANATION OF THE NATURE OF THE APPLICATION
*
Type II Site Plan Review to consider the establishment of a manufactured home
dealership with a 12' 'x 60' manufactured home .for office space. Manufactured homes
sales (SDC 18.020(2)(d)) is a permitted use, subject to Site Plan review.
DECISION
Preliminary Site Plan approval, with conditions as of the date of this letter.
OTHER USES THAT MAY BE AtrrBORIZED BY THE DECISION
None.
SITE INFORMATION
The property is is located at 1250 Main Street and is currently vacant (Assessor Map
17-03-35-41, Tax Lot 203). The property is flat and vacant. The property is zoned
Community Commercial and is.designated Community Commercial in Metro Plan diagram.
The property is not in any adopted refinement plan area. The property is bordered on
the north by an existing manufactured home park, on the east by commercial property
with an existing older house, on the south by Main Street and on the west by
residential _ the south lot is zoned Community Commercial - the north lot is zoned
Low Density Residential.
-', .;.
. i;;1- t;;-O
.:.
:1 :':-'.,
"
r'VI ""i v'\ S+ -
..
.
,
" ~ ,
," .
NOTICE OF DECISION JO. NO. 91-04-49
Page 2
CRITERIA OF APPROVAL (Ref. Section 31.060 of the SDC).
(1) COMPLIANCE VITH THE SUBMITl'AL REQUIREMENTS OF SECTIONS 3.050 AND 31.050 OF THIS
CODE.
The application was accepted by the City on April 9, 1991.
(2) PROPOSED ON-SITE AND OFF-SITE PUBLIC AND PRIVATE IMPROVEMENTS ARE SUFFICIENT TO
ACCOMMODATE THE PROPOSED DEVELOPMENT AS SPECIFIED IN ARTICLES 31, 32, TOE
APPROPRIATE ZONING AND/OR ZONING OVERLAY DISTRICT ARTICLE AND ANY APPLICABLE
REFINEMENT PLAN.
.. f}'~~":':
,
Utilities
The property is served by a private 4" sanitary sewer line which crosses Tax Lot
3800 to the west and runs south to the site of a former office. This line must
be shown on the Final Site Plan. There is an existing storm drain on the
property which will drairl that portion to be paved. Grading must be shown on the
Final Site Plan. A backflow prevention device for. the. water line will be
required.
, ",
LandscallinlI
The park strip along Main Street will require street trees, as well as the the
Irequired 5 foot-wide front yard setback (2" in caliper and spaced 30 feet apart).
The existing landscaping stops approximately half-way along the west property
line. Although the property immediately to the west is zoned Community
Commercial, the applicant is strongly encouraged to continue the landscaping in
the form of a laurel hedge to protect the existing residential use. The names
and locations of the street trees need to be shown on the Final Site Plan.
Building Code Issues
The proposed use of a manufactured home as an office space is a commercial use.
The manufactured home must be designed to comply with State Structural Code
requirements for floor loads of 50#/sq.ft; with concentrated loading up to
2,000#. The manufactured structure must be labeled as complying with this
requirement. The exit system must comply with. .code requirements for commercial
occupancies.
Setbacks
a. Office structures which are located closer than 20 feet to the property line
shall have walls facing. the property line protected by one-hour fire
resistive construction, including a parapet wall extending 30 inches above
the roof. Openings in such walls shall be protected by 3/4 hour fire rated
assemblies when located between 5 and 10 feet from the property line.
Openings are not permitted when the structure is closer than 5 feet from the.
property. line.;' -'::. ':. . . ':': ',; '.;,.:.\~.
I .', :. I " , .' ~,. ~ ("..,tl"~!""
i . , · ~ ' . .j;::q;jf;~~~~;r
.
"
,
,
."
.'
"
NOTICE OF DECISION JO. NO. 91-04-49
Page 3
b. The plan submitted did not show the front yard setback or the front yard
landscaping setback dimension. These dimensions must be shown on the Final
Site plan.
If the proposed office needs to be relocated, the new location must be shown on
the Final Site Plan.
Outside trash recePtacles
Although no trash receptacles were shown on the plan submitted, any outside
receptacles need to be screened from view and shown on the Final Site Plan.
(3) ~M""..ORIED NATURAL (INCLUDING REGULATED'VETLANDS) AND HISTORIC FEATURES OF THE
SITE HAVE BEEN ADEQUATELY CONSIDERED IN THE PROJECT DESIGN.
There are no inventoried natural or historic features on this site.
(4) PARKING AREAS AND INGRESS-EGRESS POINTS HAVE BEEN DESIGNED SO AS TO FACILITATE
TRAFFIC AND PEDESTRIAN SAFETY, TO AVOID CONGESTION AND TO MINIMIZE CURB CUTS ON
ARTERIAL OR COLLECTOR STREETS AS SPECIFIED IN ARTICLES 31, 32, THE APPROPRIATE
ZONING AND/OR ZONING OVERLAY DISTRICT ARTICLE AND ANY APPLICABLE REFINEMENT PLAN.
Access
The existing driveway along Hain Street is oversized and marked wfth gouges from
previous use. If the driveway is further det~riorated by the proposed use, a new
driveway will be required to be constructed with a maximum width of 35 feet and 8
foot-wide flares. At that time, the driveway should have a straight grade from
the back of the sidewalk to the curb line and be depressed 1" to 2" inches below
the back of sidewalk grade. No additional access is being proposed or granted as
part of this application.
Parkin&
The parking requirement for the manufactured home sales use is 1 space for each
300 square feet of gross floor area (sales and service), SDC 18.070(3). The five
parking spaces shown on the plan submitted meet this requirement. The typical
parking stall dimensions are 9' x 18'; these dimensions must be shown on the
Final Site Plan. A bike rack will be required to be shown on the Final Site
Plan.
<..
Pavinp;
The parking and circulation area will be required to be paved as shown on the
plan submitted. An extruded curb or wheel stops will be required in the area
where the parking spaces are shown. In addition, an extruded curb or other
approved device will be required along the east end of the paving area to
delineate the property line and aid in draining the property. Since the area
where the manufactured homes will be displayed is considered "static storage",
only gravel will be required in that location.
, .,~
" .
""~. -::
,
,
-
NOTICE OF DECISION JO. NO. 91-04-49
Page 4
WAT NEEDS TO BE DONE BY THE APPLICANT TO OBTAIN FINAL SITE PLAN APPROVAL?
1. A Final Site Plan drawn to scale is required within 90 days of the date of this
letter. The following changes need to be shown:
a. The location of the sanitary sewer line.
.b. A grading plan for the area to be paved.
,
c.' The additional landscaping/street trees.
d. Relocation of the office structure, if necessary.
e. The front yard setback and the front yard landscaping setback dimension.
f. Screening of outside trash receptacles, if necessary.
g. The parking stall dimensions.
h. The bike rack.
i. The extruded curb/wheel stops.
2. A signed Development Agreement. This agreement ,will be prepared by staff to be
signed after the appeal period is over.
3. The back flow prevention device.
4. Certification that the manufactured home meets commercial standards.
A...uu~ONAL INFORMATION
The application, all documents and evidence relied upon by the applicant and the
applicable criteria are available for a free inspection and copies will be available
at a cost of $0.75 for the first page and $0.25 for each additional page at the
Development Services Department, 225 Fifth Street, Springfield, Oregon.
APPEAL
If you wish to appeal this Type II Site Plan Review decision, you must do so within
10 days of the date of this letter., Your appeal must be in accordance with
Springfield Development Code, Article 15, APPEALS.
, .'.....
'... ',t"
.... .. .,'.
. .-
..,f.;'.
,1.: .".
."' "
. ,-,
. . I' .. ('~; ," .
,.:.:,
."
;', '.
,.lO'
, .
'.
,
-
NOTICE OF DECISION JO. NO. 91-04-49
Page 5
QUESTIONS
Please call the Development Services Department at 726-3759 if you. have any questions
regarding this process.' ,
.- "
PREPARED. BY
'..'1
" ~.; '.'
Gary M. Karp
Associate Planner
Copy To: DRC Members
Property Owners/Residents within 300 feet of the subject property
.'
.,' .."
I,
.' .
'-
~'.GFIELD . .. ... ...
."\..,,.t:=;~
,~.:~~:~";~:':~ :,_:~l
225 FIITD STREET . c,~<~..;:-: ,'.<:'" ELECTRICAL PERMIT APPLICATION
. . ._~..' M~ ~
. SPRINGFIELD, OREGON 97477 ,.,~<'.;:;-';'" n T"'\38'"=<-.
. :INSPECTION REQUEST: 72~r:;JJ~,~:~.")";;'^C' ~/...,..... _" City Job Number '--'\\1 } ......)
OFFICE: .726-3759 .' . ..' \-J.'-A- 1__
... "'~;""'id<-<6'V\~~'~" ..EE SCDEDULK BELOV >f
1. L.OCATIO~F~I!!SJllliLATION b>-'" _~7.. ..
1,L-jF;{ ) \ '{ 'l \ 1 1\.n :..-.~ ....~;.:~ . New Resldential-Single or .
. - .. ."no'>"". Mul ti-Family per dwelling uni t. .. .
'.:\0'''''- .
\ -m~~~~\ON cJ)~n~ SerVlce Included: Items Cost Sum
. '. JOB DESCRIPTION -+-
N\ \'-\ (\ ()f\ f\ 0 ^' A
Permits are non-transferable and expire
if work is not started within 180 days
of issuance or if work is .suspended for
180 days.
2. CONTRACTOR INSTALLATION ONLY
Elec t ri cal Con t rac to~L\, :~ d...Rx-s
Address /Jq~ n1DnfLoU
Ci ty Euo\U\. Q....- Phone 4~ S -01 Zl-
Supervisor L~cense Number ~ q YJ() S
Expiration Date In~Q
Constr Contr. NUniber-C)::t~C\I.o
Expiration Date \ ~r
"Sfgnature'of SUp~ng.Elec~rician
.k ~- YA~'.
Jwners N~m~ ~i\(\)[\ D . D.
Address 2-Ar)~.k .~(\ ~~.l ~l~
Ci ty~.; Phone.J18 &144-
O\INER INSTALLATION
The installation is being. made on
property I own which is not. intended
for sale, lease or rent;
Owners Signature:
--------~- ----------
.. DATE:._ _5'n L{ I ~
. ""'''''in I: L 11 _1'1L.f'14
RECEIVED BY: (~'U.Lx.A.../
1500 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each.Manuf'd Home or
Modular Dwelling
Service or Feeder
$ 85.00
$ 15.00
1$ 35.00 ,~S
B.
Services or Feeders (10 Branch'Circuits
'included). Installation, Alterations
or Relocation:
100 amps or less
101 amps to 400 amps
401 amps to 600 amps
601 amps to 1000 amps
Over 1000 amps/volts
Reconnect Only
$ 35.00..
$ 60.00
$ 90.00
$130.00
$300.00
$ 35.00
C.
Temporary Services or Feeders
Installation, Alteration or Relocation
200 amps or less
201 amps to 400 amps
Over 401 to 600 amps
Over 600 amps or 1000 volts
$ 35.00
$ 40.00
$ 80.00
see "B"
above
Branch Circuits
New, Alteration or Extension Per Panel
One Circuit
.Two .to ten Circuits
Each Addt'l ten or
portion thereof
$ 35.00
$ 50.00
$ 15.00
E;
Miscellaneous (Service/feeder
-Each installation
Pump or irrigation
Sign/Outline Lighting
Signal Circuit or
limited energy. panel
not included).
$ 36.00
$ 36.00
5.
$ 36.00
21~_CD
~I ~'.~~
SUBTOTAL OF ABOVE .
5% State Surcharge
TOTAL
....... 10
.
.
WfVLU
SITE PLAN REVIEY DEVELOPMENT AGREEMENT
THIS DEVELOPMENT AGREEMENT, hereinafter "Agreement", is entered into this 7[/1
day of May, 1991 (the "Effective Date") by and between the CITY OF SPRINGFIELD,
hereinafter "City", and Sycan B Corp., hereinafter "Applicant", in accordance wi th
Section 31.090, and Sections 3.070(3), 3.080(3), 3,090(3), and 3.100(3).
RECITALS
*
YHEREAS, on the
Plans submitted by the
j7.nV day of May, 1991, the City approved
Applicant for the purpose of allowing:
the Modified Site
CITY JOURNAL NUMBER 91-04-49. Type II Site Plan Review to consider the establishment
of a manufactured home dealership with a 12' x 60' manufactured home for office
space. The property is located at 1250 Main Street and is currently vacant
(Assessor's Map 17-03-35-41, Tax Lot 203). This property is zoned Community
Commercial (CC); the Metro Plan designation is CC. Manufactured home sales (SDC
18.020(2)(d) is a permitted use, subject to Site Plan Review.
YHEREAS, in consideration for Site Plan approval, the issuance of a Building
Permit, and the issuance of an Occupancy Permit, as specified in the Springfield
Development Code Section 31.090, Applicant agrees to comply with all the standards of
the Springfield Development Code and Springfield Municipal Code which may be
applicable to this development project unless modified or excepted by the Site Plan
Review Development Agreement, Planning Director, Planning Commission, Building
Official or their agents, or the Fire Marshal, which modifications or exceptions
shall be reduced to writing.
YHEREAS, in consideration for Site Plan approval, the issuance of a Building
Permit, and the issuance of an Occupancy Permit, as specified in the Springfield
Development Code Section 31.090, Applicant agrees to comply with the following
specific conditions imposed by the City as part of the Site Plan approval:
1. All improvem~ts must be constructed/installed as shown on the Final Site Plans
dated gtlv 7.:.., 1991.
/'
2. The installation of a backflow prevention device.
3. The certification that the manufactured home meets commercial standards.
THEREFORE IN CONSIDERATION OF THE FOREGOING RECITALS YHICH ARE EXPRESSLY MADE A PART
OF THIS AGREEMENT, CITY AND APPLICANT AGREE AS FOLLOYS:
AGREEMENT
1. FINAL SITE PLAN. The applicant has submitted a Final Site Plan in
accordance with Section 31.080 of the Springfield Development Code.
2. STANDARDS. The applicant agrees to fulfill all applicable standards
specified in the Springfield Development Code and the specific standards listed in
RECITALS prior to occupancy, unless certain standards have been deferred to a later
date in accordance with Section 31.110 of the Springfield Development Code.
Site Plan Development Agreement
1
1;)50
fJ1 Cd V; yf ,
.
.
I
~ .,,-
3. CONDITIONS. The Applicant agrees to fulfill all specific conditions of
approval required by the City listed in RECITALS prior to occupancy, unless certain
conditions have been deferred to a later date in accordance with Section 31.040(4)(b)
of the Springfield Development Code.
4. MODIFICATIONS. The applicant agrees not to modify the approved Final Site
Plan without first notifying the City. Modifications to the Final Site Plan shall be
reviewed in accordance with Section 31.100 of the Springfield Development Code.
5. MAINTAINING THE USE. The applicant agrees to the following:
(a) The building and site shall be maintained in accordance with the
provisions of the Springfield Development Code in order to continue the use.
(b) It shall be the continuing obligation of the property owner to
maintain the planting required by Section 31.140 of the Springfield Development Code
in an attractive manner free of weeds and other invading vegetation. In addition,
plantings in the vision clearance area shall be trimmed to meet the 2 1/2 foot height
standard in accordance with Section 32.070 of the Springfield Development Code.
(c) Parking lots shall be maintained by the property
condition free of litter or dust, and deteriorated pavement
improved to maintain conformance with these standards.
owner or tenant in a
conditions shall be
(d) Undeveloped land
of trash and stored materials
shall not be used for parking.
within the development area shall be maintained free
in a mowed and attractive manner. Undeveloped land
6. In addition to all other remedies which may be provided by law or equity
(including but not limited to penalties provided by applicable State Law or City
Ordinances), Applicant agrees that City may enforce Applicant's responsibilities by
withholding Applicant's Final Occupancy Permit, and terminating any Temporary
Occupancy Permit which may have been granted.
7. Any Final Site Plan approved becomes null and void if construction does not
commence within two years of the date of this Agreement.
IN VITNESS VHEREOF, the Applicant and the City have executed this Agreement as of the
date first hereinabove written.
:;f/11
Date '
BY:
~
~.
~Am,;ilyZJ.M< t:r'/a.L:bIJ' /"'0I~t'~ ~/l,8'
APPLICANT
BY:
STATE OF OREGON, County of
"..vIA., '7 , 1991.
1i.....<7J.<" j) H<II=-
LltN6
Personally appeared the above named
, who acknowledged the foregoing instrument to
Site Plan Development Agreement
2
-,' -' Ii
.
.
be their voluntary act.
Before me:
NOt~c
/L
for Oregon
My Commission expires
3 - ~ -q 7...
EYI-11
Date
CITY_ ./
BY: ~ A ~ ~ !:l'/-!"
Plan~Manager
STATE OF OREGON, County of
a Lf '7 n.--- , 1991. Personally appeared the above named
. 'r IlJulJ , who acknowledged the foregoing instrument to
be thei voluntary act. Before me
: j~O~& 'Ore
~
My Commission expires
Site Plan Development Agreement
3
.
__':3"
.
CITY OF SPRINGFIELD
APPLICATION FOR DEVELOPMENT COORDINATION' APPROVAL
The undersigned hereby request that the following real property more particularly
described below be considered for Development Coordination Approval in accordance
with Article 18 of the Springfield Comprehensive Zoning Code.
The applicant must furnish the following information:
1) Legal description(s)
2) Proof of ownership
3) Proof of authority for applicants acting as the owner's agent
Total Land Area: 27,540 Sq. Ft. Zoning District: C:~
I
,
Property Location:
1280 Main Street Springfield, Oregon
').03
Map and Tax Lot #: l7-03-35-4l~
Plans Prepared By: Joseph D. Baudo
Telephone # 74,l0350
Owner( s) :
Joseph D. Baudo
Telephone # 741-0350
Telephone #
Builder:
Joseph D.Baudo
Telephone #
741-0350
Description of Intended Use:
Sales Center for Model Homes (Manufactured Housing)
FEES:
. Development Coordination fees are based on the value of the project to be reviewed.
Please check one of the following:
$100,000.00 or less valuation........,..$ 30.00 Received by -;:;::'-'9-g~
$100,000.00 - $250,000.00...............$ 60:00 -- D t ~
$ $ $ a e --- -"!7-r--
250,000.00 - 500,000.00............... 90.00--
$500,000.00 or more......................$150.00 -- lih'TU:7.3'c;,.'<..'3"'3,/
I do hereby declare that all plans submi~t~d.fulfill and comply with all provisions
set forth by Section 18.01 through 18.07 of' the Springfield Comprehensive Zoning Code.
APPLICANT:
NAME (please Rrint): Joseph D. Bando
SIGNATURE: C'\r'~~.>V... n. (~c..,~/,( __.-.-.'..-
oJ ~ ~
TITLE: 'Owner
ADDRESS: 1280 Main Street
TELEPHONE: 741-0070
Springfield, Oregon 97477
.
~A
~