Loading...
HomeMy WebLinkAboutPermit Mechanical 1986-2-14 "~"'---"~ ""'0 .-- -..-.. Job Address I f1(o '2. o-n.~ ~'t CITY Ur SPRINGFIElD COMBINATION APPlICATION/PERMIT EilERGY SOURCES: Heat Hater Heater Range ValuE of Work: - ."~..~ --- .--.--..-.-, I INSPECTION liNE 726-3769 I INFDRlIATJON L1Nl l 726-3753 Sq. Ftg. 1.lain ~q. Ftg. Access. Sq. Ftg. Other New Add Alter Rep. --Fence Demo Change/Use -Other- - legal Description BuildinQ Permit Info: Describe Work{i.e., Familv nesidence With Attached Garaoe) Jj~T:; M,-~~ .t)-~ tAJ~ ~ Build Sin91e 0- 00 o o -...9 00 Address \ 0 \0 """L (V ...b~0.1 r,WJJvU'.--.~ ~~ ~. Phone Owner' Construction lender Address UlSIGN TEAH (name) Phone (address) (lies. no.) (exoirfl's) (ohone no. \ _. A ~, ~r ... Primary Structural Electrical Mechanical CONTRACTORS ~,\.\<..\"' \'\'w.-"-\...~.:J> (name) g 21 2.1 \"".lJ)O\(fu.., (addres~ 1 11~~rn~1 (exoirp~l (ohonp. no_) Genera 1 Plumbino Electrical ~1echanieal PlUlIBI NG ELECTRICAl ITLI~'~ MECHANICAL NO.1 Each single fixture FEE I CHARGE .1Jn >>. r"1lRIiE. Residence of SQ. FT. furnace/burner to BTU's Relocated buildin9 (new fix. additional) New circuits alts. or extensions Floor furnace and vent S.F. Residence (1 bath) Duplex (1 bath) each Additional bath SERVICES Recessed wall <;O~r:P np.:ltpr ilnri VPr'lt , Storm Sewer LL~.;:h,,-, ~ ( o.OD Temporary Construction Change in existing rp<;.j1eflC":p multifamily, comm. or tnfiuo;trial Of amps.1 ICOW~./IND. FEEDERS [Install/alter/relocate fii<;.trih. fppfier<;. [Of amp..[ Appliance vent <:;poarate Stationary evap. C'ooler Vent fan with ..inole duct Vent system apart from I hea t; no or A. C. Mechanical exhaust hood nnd fiur.t. I I I I li<;,OC' [ I Wa ter serv; ce Sewer Wood stove/heater (-'oJ r, L , -t:.,. :Jtc~ ISSUANCE OF PFR!iIT TOTAL CHARGES /0.00 TOTAL CHARGES TOTAL CHARGES i ), 0 0 WHERE STATE L'H REQUIRES that the Electrical work be done by an.'Electrical Contractor, the electrical portion of this perr.lit shall not be valid until the label has been signed by an Electrical Supervisor and returned to the Building Division I HAVE CAREFUllY EXAMINED the completed application for permit, and do hereby certify that all information hereon ;s true and correct, and I further certify that any and all work oerformed shall be done in accordance with the Ordinances of the City of Springfield and the laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPArKY will be made of any structure without the permission of the Building Division. I further certify that my registration with the Bui1der1s Board is in full force and effect as required by ORS 701.055, that if exempt the basis for exemption is noted hereon, and that only subcontractors and employees who are in compliance with ORS 7Ql.055 will b~ used on this project. SIGNATURE W.4n it,) Ma.--L FOn OFFICE USE DilLY /./ Sq. Ftg. ilain x Sq. Ftg. Access x Sq. Ftg. Other x 2 OAT~ NN~E(please print) ~}~ (.) /3rl/t....EY Zone Fire Zone Flood Plain Tvpe/Const. Bed rooms Stories Units Occy Load Occ'y Group Value Value Value TOTAL V AlUA TI ON BUilDING PERHIT Charges and Surcharges Plan Ck. Comm/Ind ____________~/Bldo Pp!" Fep Plan Ck. Res 30%/Bldo Per Fee [ Fence I DfjRlo I'sidewalk I A/C Pavin9 i Curb Cut I Systems Development Charoe (1.5%) " PLUt~BING PERMIT Charges and Surcharges iO .00 ------------ .l.(O ElECTRICAl PERiHT Charges and Surcharges MECHANICAL PERMIT Charges and Surcharges Total Comb. Permit __L~:.Q.9_____ , Co 0 TOTAL ../1 diD.Oc) I -----;- ---..- , e COMBINATION APPLICATION/PERMIT (CAP) I. Applicant to furnish A. Job Address B. legal Description 1. ~xample- Tax Lot 100, Lane County Map Reference 1/ OJ 43 2. exam~le- Lot 1. Block 3, 2nd Addition to ~prlngtield Estates C. Name. etc. of owner and construction lender D. Energy Sources 1. example- heat/electrical ceili~Q/or forced air Qas 2. example- waterheater/electrical/or solar E. Square footage or valuation, etc. 1. examole- 1250 sq. foot house, 500 sq. foot garage 2. example- if new project. check-new.- if addition. check add, etc. F. Building pennit information: ", 1. example - construct single family house with an . attached garage 2. exam21e - remodel existing garage into family room 3. examyle - convert single family residence into restaurant (change of use) G. Value of work as defined in Section 303 (a) of the Structural Specialty Code H. DESIGN TEAM 'AND CONTRACTORS To avoid design or construction delays. Building Division Staff must be able to contact appropriate persons regarding design information or job site corrections, etc. II. Abbreviated Plumbing, Mechanical, & Electrical Schedules A. Except where blank spaces occur in the description portion of the Mechanical and Electrical Schedules, the applicant need fill-in only the No. Boxes adjacent to the appropriate item(s) to be installed ' B. Full Plumbing, Mechanical, and Electrical Schedules are available at the Building Division 1. To conserve space on the permit form the 'schedules have been abbreviated 2. If the item(s) to be installed are not covered on the abbreviated schedules you should consult the fu 11 schedu 1 es C. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND' CHARGES ON THE SCHEDULES D. As noted on the CAP, the label must be delivered to the electrical contractor for signature by his electrical supervisor. The general contractor is.not authorized to -sign the electrical label. - Ill. Applicant to sign and date , Whenever possible, the initial application will be used as a worksheet only. Where possible, Building Division Staff will prepare a type written copy and return it to the applicant at the time the actual permit is issued-for his signature. IV. Fees and Charges Plan check fees are due and payable at the time of the application, and no plans will be processed until these fees are paid. All other fees and charges are due and payable when the permit is issued. V. FOR OFFICE USE ONLY PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPANCY: I PERMIT VALIDATION , r1~ Oi/ Y (11 , fA '-7 ... Ir) \..9 $~ ~ } V Pennit Clerk /L/ J Permit applicant exempt from registration with the Builder's Board because: Additional Project Infonnation: PLANS REVIEWED BY: name signature . .,'. -~~ date