HomeMy WebLinkAboutPermit Miscellaneous 1999-7-27
" .
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
.
225 Fifth Street. Springfield, Oregon 97477
~
JOB NUMBER
QQ'OI3
INSPECTION L1N E: 726,3769
OFFICE: 726,3759
LOCATION OF PROPOSED WORK: .I () 71f t. 11\ 4, "I (<; . U ' R '\
ASSESSORS MAP' II-a'!, - '35' - 3,
I (\f) I "1Yt~
TAX LOT: o;;"<.Qd - "S"t. 00 , lo~~ :
'[
OWNER' c::.,. LA ,K
ADDRESS' 100 I /0/1 A ,,../
CITY: "bt>R..,rJl.C1'l!' "
PHONE:
7 '2-1... - :>'1..Q.I '
STAT~' ,<) e....
ZIP: ") 7 c[.(b7
DESCRIPTION OF WORt<.
ee. - AS;>N<1L 'T 7"'~.I::....~& Lr:;T
NEW..
REMODEL
..... ADDITION
DEMOLISH "'...._,.. OTHER
VALUE:
ADDRESS
ADDRESS
/QOJ., )/fit ,,/ ~T
CONST.
CONTRACTOR'
PHONE
7'{q-':nr?
ARCHITECT:
NAME
A,::r, :!;'.J,('Of3'bO,J
CONTRACTOR'S NAME
EXPIRES
PHONE
PLUMBIN'"
MECHANICA' .
(,1rJ .,.,12../..-'1"1" r ,,"^,~T
1'.1l...lrll.l2..L,N....
~
GENERA' .
ELECTRICA' .
NO, FEE CHARGE
Single Fixture
Relocated Bldg.
{new Ilx. addtll
Water Service
It.
Sanitary Sewer ft.
Storm Sewer ....0
It. 6iflr..-
Backflow Device
Nn
FFF
t'HARGc1
PLUMBING
MECHANICAL
Furnace/burner & vent
< 100000 BTUs.._______ __,_" ....... ...._m.."
Furnace/burner & vent
> 100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit healer
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
lrom AC or htg.
Mechanical exhaust
hood and ducl
Permit Issuance
$10,00
TOTAL PERMIT
TOTAL PERMIT
Alll:::j~I:'Jl\J("...lf' rI'."..........,.';...__ "_",
fO!'OW ~Ules (HjI,I!IDI(~M1~0:r.;;}'
Notification CenlAr, T!;1f~o rules are set forth
':; Sf,f: 952-o0~~88~cftn~oNJgo UAA 952-001-
0090. You ma'ZONrlliJI ""r;oe ^. ~.!:l: ~t:las :"
callmg the center, ,~NC/1~,~,lP~ If.llfj ~llne J
:;:;rr.ber for ttltl<t5}1!g&n Clfllliy i"Jofj~catlon
CentewATER1HEI\'l:!i"',,?A 1).
- OFFICE USE -
NOTICE:
QUAD AREA THISPERMITSHALLEXPIR~tN~WUHI'\,
. OF BLDGS: AU'HUHILt:UUNUt::RTHIS~g!jf\\1fjlfsNe-;-
OCCY GROUP: CvivJr.l;:r4Ct:E;3RtSABAN~IFC!lrq>E:
. OF STORIES:~' 'Xl:J D,W PERIQD. HEAT SOURCF'
so. FT.
$IS0. FT.
VALUE
so. FTG ACCESS
X
X
X
SQ, FTG MAIN
SQ. FTG OTH ER
TOTAL VALUE OF PROJiCT
PLAN CHECK FEF
RCPTN
DATE
BY
I BUILDING PERMIT
I':: State
SurcharRe
I MECHANICAL
I .. Stale
Surcharae
I PAVING
PLUMBING
6.
1.0S' 't" ,y.S"
DEMOLITION
State
Surcharge
FENCE
VALUE $_
SIDEWALK
CURBCUT
FT.
FT,
SUBTOTAL
PERMITS "
SYSTEMS
, DEVELOPMENT
~ l\::>. '51l
TOTAL PERMIT FEES I j,. I fa. '50
EXCLUDING ELECTRICA' '-P
......_--.-.._..~
. REQUIRED INSPECTIONS.
It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To reQuest an InspectIon, call
726-3769 (recorder), state your CIty desIgnated job number, Job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a,m. will be mede the same working day, requests made after 7:00 a.m. will be mede
the following work day. '
SITIli INSPSOTION, To b. ROUQH PLUMBINQ, PAVINQ, Aft.r gr.v.1 I. In
made after excavation, but . ,ELECTRICAL It._ place but prior to placIng
prIor to setup of forms. MECHANICAL: No work Is to asphalt or concrete.
be covered until these
inspections have been made
and approved,
UNDERSLAB PLUMBING,
IiLIiOTR'OAL .
MECHANICAL:,To be made
before any work Is covered.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materlele end before
framIng Inspection.
FRAMING: To be made 'afte;
the roof, all framing. fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete end
the rough electrical, plumbing
and mechanical are approved.
,FO,OTINQS " FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
CONCRETE SLAB: To be
mede after alllnslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete Is placed.
~ \
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied,
FIRE & SEPARATION WALL:
Located and constructed
accordIng to plans.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing.
electrical, mechanical. To be
made prior to installation of
floor Insulation, decking or
floor sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board.
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished,
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing,
SIDEWALK & DRIVEWAY:; . ,
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material In
place.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Coda
a speclsllnspector shsll be employed
by the Owner I Contractor during
construction of the followIng work. A
copy of the special testing reports ehall
be furnished ,to the 6ulldlng Division.
STRUCTURAL CONCRETE: In
excess of 2500 P,S.1. (306 a,1)
STRUCTURAL WELDS:
Performed on the job, (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations, (306
a.6)
SPRAYED ON
FIREPROOFING: UB,C,
Standaras 43.8,
SPECIAL GRADING.
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the Clty's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25,10,11).
l./"'"
STRUCTURAL MASONRY: (306
a.7)
-;;5h,(2.0V'0.. ~~
"In addition to the Inspec-
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code,
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping. etc. must be completed before
requesting this Inspection.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL BUILDING: Requested after the final plumbing. electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
DAT"
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction. \J
'-(Slgnalure ~, I _ .A-
I,) f /
;.,......
AMOUNT RECEIVED: cl> llo .SO
3Soo~
VALIDATION:
RECEIPT ':
,
(6:te
7-27 - qq
DATE PAID:
'1-~-c;"'l
~
RECEIVED BY: