SPRINGFIELD UTILITY BOARD
WATER SERVICE CENTER 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.subutil.com
August 4, 2008
Mark Metzger
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Mark:'
SUBJECT:
SU13DIVISION TENTATIVE #SUB2008-00032 DILLON .
Tax Map 17:02-35-42, Tax Lot 200, 7406 Main Street, Dillon Subdivision
Listed below are our comments for the above referenced development proposal:
1.
The proposed development is within the Springfield city limits and will receive water service
from the Springfield Utility Board (SUB).
2.
All new water system facilities and modifications to water system facilities both inside and
. !l.dj!lce.11t.t9:tne. prop<;Jsed d5've)opmentshall be placed in street right-of-way at a location and
derth Qf,~t!ry..tha!.me~ts;!h;:sJ~nqaTds;o,f.theSUB W~ter DivisionVq,'s: ':;n:Z"" .'''.il pc, ;p02~ m
.;. ,,_ ,1,1'>'-, >:;,-1~;'...,:'.. r;. '.~ -' ~r'l' (, ",:. :\q,~-,.';u:~i:r':J;; Cj:C-:'iiQ,.:- nc, ~'-JobrJ;::;Jj~
All water facility materials shall be to a standard that must meet SUB Water Division
specific!lti9!lS. c. ',.- . ',,:..
3.
4.
-. ! p
All workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5.
Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water. Division and the long-range needs of the City. These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission lines, pumping facilities,
and commLLry..ication lines.
6.
Please ask the developer to contact the SUB Water Division for detailed inf9rmation on the
materials and cpnstruction standards, detailed costs for installing SUB waterJaciIities, and a
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
7.
All water meters will'be placed in public right-of-way at a location identified by the developer.
EaSh lot:9.coparcel must have its own water service.
8,
,_,' ' .' ," ,. ",' ":. ~ :: '\. .r 'f '. ".' II,,' ~.' '-."; ,,' -.. : 'I /' . . . -; :," -;tr:::,~ ,;. .;
Water service facilities will be installed upon collection of developlhent'charges,' Development
policies and charges identified in:this.letter are subject to change,,'Actual charges will be those in
e'ffect at thejtime" ""ater, ~ervice is requested.' ,.....,.., ,<: .r:-. "; c "..... ,,',o,; ;.
'. .~, :' I '. : ;._ .
S:\SITEPLAN\7406 Main Street tentative subdivision 8-4-08.docx
.~. 'ed' ~/~/61
Date Recelv '
Planner: MM
9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes from wells, In every instance, care shall be taken to prevent groundwater contamination,
Contractors/developers/owners shall be responsible for the safe handling and storage of
chemicals, petroleum products, fertilizers, and the prevention of groundwater and storm water
runoff contamination.
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chiilitz at Springfield Utility Board Water Division for details at 726-2396.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.
Si",~ ~
I
J
Rebecca Templin, P.E.
Water Engineering Supervisor - Water Division
RA T:mk
cc: Justin Dillon, P.O. Box 51297, Eugene, Oregon 97405
Stacy Salladay, Branch Engineering, lnc" 310 Fifth Street, Springfield, Oregon 97477
S:\SITEPLAN\7406 Main Street tentative subdivision 8-4-08.docx