Loading...
HomeMy WebLinkAboutCorrespondence Miscellaneous 7/3/2008 f " CIVIL ~~ Br~nch Engineering, Inc. 310 5th Street. Springfield, Oregon 97477. (541) 746-0637. Fax (541) 746-0389 "\ PRINCIPALS: James A. Branch, P.E., P.LS. Rene Fabricant, S.E., P.E. Michael Lane Branch, PE. Oamien Gilbert, P.E. Renee Clough, P.E. July 2, 2008 Branch No. 06-081 Mark Metzger Development Services City of Springfield 225 Fifth Street Springfield, OR 97477 Re: Submittal of Revised Tentative Subdivision for Gordon Hoerauf Dear Mark, In response to your comments regarding the paved driveway accessing Lots 3, 4 and 5, please find enclosed a revised copy of the tentative subdivision plan showing the new driveway design. Due to future development issues of Lot 4, the driveway access has not been paved at this time. The possibility of damage to the curb as shown on the original tentative plan and uncertainty as to the future roof drain location has caused the need for this change. The paved access and roof drain location will be at the builder's discretion when a structure is placed on Lot 4. Sincerely, rJ~ Dan Nelson, LSI Branch Engineering, Inc. Encl: Date ReCeiVeel:.1./.2..J ()( Planner: MM I . 07-03-0 SP01 :07 RCVD ./ STRUCTURAL TRAFFIC / TRANSPORTATION SURVEYING