HomeMy WebLinkAboutMiscellaneous Compliance Report 2009-7-7 , o III1f1Cl8 I r 111& 525 NW Second Street, Corvallis, Orogol197330 d 800.3B3J1855 ph 5[11.75R1302 Ix 541.7532264 www.claircolllpanv.com July 7, 2009 r~ --------- City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 '-l-oq fS~2. ~-tI{~4MM.CM.ofAr1(f{.~ Dave Puent, Building Official PS#2 Elevator Enclosure - 1" Plan Review - Conditions of Approval PeaceHealth at RiverBend - Sacred Heart Medical Center Project - Parking Garage #2 1141-021-3 COM2007c00509\ '.c- -.. ""-' Clair Company, Inc. (CLAIR) has completed the plan review for the above referenced Submittal for the Peace Health at Riverbend, Sacred Heart Medical Center Project, PS #2 Building. This plan review has been conducted on behalf of the City of Springfield and CLAIR recommends approval with conditions of the associated documents. . Attention: Subject: Project: CLAIR Project No.: Building Permit No.: CLAIR requests that the permit applicant/designer respond in writing to each comment in the Conditions of Approval plan review document by adding an applicant response row directly below the CLAIR review comment field and fill in the indicated fields on the attached EXCEL2000 document along with submitting all necessary requested submittals. If you have any questions or need clarifications regarding the ihfonnation we have provided or requested, please do not hesitate to contact our office at (541) 758-1302 or by email ataclairr7i)claircomoanv.com. Sincerely, duff!-- Allan Clair, C.B.O. Project Manager Cc: Al Gerard, City of Springfield Fire Department Kirk Haskell, PeaceHealth Bill Shaw, Berry Construction CLAIR Project File #1141-021.3 Attached: # I - Codes and Standards #2 - Submittal Log #3 - Plan Review Document if 525 NW Second Street. Corvallis, Oregon 97330 d BOO.383.88S5 ph 541.758.1302 Ix 541.753.2264 www.claircompany.com July 31,2009 fAf. - City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 i .J /'001 '5" '2. ~to".-n,.r ~ . NdW ~ ~,. Attention: Dave Puent, Building Official Subject: PS#2 Elevator Enclosure -1" Back Check - Notes to Inspector Project: PeaceHealth at RiverBend - Sacred Heart Medical Center Project - Parking Garage #2 CLAIR prOjcct{o' i i~i--v~0>--'- -... Building Perm; 0.: COM2007-00509' Clair Company, In. CLAIR) completed the plan review for the above referenced Submittal for the PeaceHealth at Riverbend, Sacred Heart Medical Center Project, PS #2 Building. This plan review has been conducted on behalf of the City .of Springfield and CLAIR recommends approval with notes to inspector of the associated documents. If you have any questions or need clarifications regarding the information we have provided or requested,please do not hesitate to contact our office at (541) 758-1302 or by email atacIairrQ)c1aircomoanv.com. Sincerely, duff!-- Allan Clair, c.B.O. Project Manager Cc: Al Gerard, City of Springfield Fire Department Kirk Haskell, PeaceHealth Bill Shaw, Berry Construction CLAIR Project File #1141-021-3 Attached: # I - Codes and Standards #2. Submittal Log #3 - Plan Review Document City of Springfield Berry Architects Peace Health at RiverBend Sacred Heart Medical Center Project . Parking Garage #2 Elevator Enclosure Height (feet): S-2 I-B 8 Tiers 87'~5" max , -7-0"1 (7~ *"1.. ~H~~. f1~ (1.."" Wolf ~ ' . Occuoanc'f Group'(sl: Tvoe of Construction: Stories: 248.774.18 sf Building Area (Sq. Ft.): Occupant Load: 1.244 total 167 oer tier S~rinklers: None - standoioes on Iv Alarms: none Fire Wall: 2-hr an. RMP Please respond in writing to each comment by creating a response row to each item. This plan review document is created in Microsoft EXCELOO. Each city comment is a whole number. Your response to each item will be a x.1 number. For example, City comment is Item 1.0, your response is Item 1.1. Each of your responses will be shown in bold face type, Indicate which detail, specification, or calculation shows the requested information. Responses such as "see plans" or "plans comply" or citing a code section does not resolve a review comment or expedite plan approval. An explanation of how compliance with the code requirement is achieved and a reflection of that explanation in the construction document with the revisions clouded is our expectation. Your complete and clear response will expedite the re-review and approval of this project or deferred submittal. Thank you for your assistance. Item # City Comment From City Comment Date Construction Document or Plan Sheet and In<:>fA\ City Comment I Applicant Response Response From Response Date Status of Item Elevator Enclosure - Plan Review CLAIR 7/7/2009 General Please clarify how ventilation for the new enclosure will be orovided. 2007 OSSC. Section 1203.1 Please cfarify how egress and exit lighting requirements for the new enclosure will be provided. 20070SSC, Section 1205.1 Condition ofl Aooroval 2 CLAIR 7/7/2009 General Condition of Aporoval 3 CLAIR 7/7/2009 A1.1 June 23, 09 Enclosing the elevator lobby MAY void the current exception in NFPA 72 that allows the omission of elevator lobby smoke detection for elevator recall; this lobby is no longer in an outdoor area or location that is open to the weather. Please clarify whether 1. this lobby will be heated and 2. if there are existing hoistway or elevator room smoke or heat detectors intertied to a building fire alarm system; if both 1. and 2. are implemented, please provide an elevator lobby smoke detector for firefighter recall and connect to the existing fire alarm system. 2007 NFPA 726.16.3.5. Condition of Aporoval 10f2 SHMC - Parking Garage #2 Elevator Enclosure 1st Plan Review - Conditions of Approval July 7,2009 CLAIR: 1141-021-3 ~- ~w< For questions call CLAiR at (800) 383-8855 City of Springfield Berry Architects Peace Health at RiverBend Sacred Heart Medical Center Project Parking Garage #2 Elevator Enclosure .'J~ '"""'eco"w"'~~0 . Occuoancy Grouol!;.}: TYDe of Construction: -=C\~l:'lrie5: Height (feet): S-2 i-B 8 Tiers 87'-5" 'max 7-J.1-d0l, 1'5*'1- tA-tHr.,~~. /S<f"bewlL-cw",. 248.774.18 sf Building Area (Sq. Ft.): Occupant Load: 1.244 total 167 Der tier Sl?rinklers: None - standoioes only Alarm!';: none Fir. Wall: 2-hr @ RMP Please respond in writing to each comment by creating a response row to each item. This plan review document is created in Microsoft EXCELOO. Each city comment is a whole number. Your response to each item will be a x.1 number. For example, City comment is Item 1.0, your response is Item 1.1. Each of your responses will be shown in bold face type. Indicate which detail, specification, or calculation shows the requested information. Responses such as "see plans" or "plans comply" or citing a code section does not resolve a review comment or expedite plan approval. An explanation of how compliance with the code requirement is achieved and a reflection of that explanation in the construction document with the revisions clouded is our expectation. Your complete and clear response will expedite the re-review and approval of this project or deferred submittal. Thank you for your assistance. Item # City Comment From City Comment Date Construction Document or Plan Sheet and Irmt.,~\ City Comment I Applicant Response Response From Response Date Status of Item Elevator Enclosure. Plan Review CLAIR 7/7/2009 General Please clarify how ventilation for the new enclosure will be ~ovided. 2007 OS_SC. Section 1203.1 _ Enclosure area shall be naturally ventilated by the addition Bill Shaw/Berry 7/16/2009 of two operable sashes into the storefront system per Architects attached drawing A1.2R (hard copy to be submitted as Supplemental Information). Sashes shall be approx 7 s.f. each giving a total ventilation area of approx. 14 s.f., or 4% of the enclosure area of 348 s.f. The nature of the space is such that general use thereof is closely connected to operation of the exterior door, providing de facto ventilation to the space. The operable sashes will be used to augment this as deemed necessary. Given the occupant load and the intended use of the space we believe this to be adequate. 1.1 lof4 SHMC - Parking Garage #2 Elevator Enclosure 1st Back Check - Notes to Inspector July 31, 2009 CLAIR: 1141-021-3 For questions call CLAIR at (800) 383-8855 ~U1