COMPRESSION.REPORT
~
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477.
(541)746-9649 - (541)746-7163 fax
,.Q..atl!: __ _c~YQysI.21, 2009 CCB#176269
~,p, No,: Co.43-t
P,b:'No.: . - ...'
Cast By: Pete Furlong
Client:
Address:
Matt Keenan
KPFF Consulting Engineers
1201 Oak'Street, Suite 100
Euger:e, OR 97401
Project No.: 722-90101-36
P 'N ,Maple Elementary School
rOJ. ,ame: Pl!.l?lic !mp!ovemen\ 2009
/ Lo~tiori: 2109 J)3tre.etj
Springfield, Oregon
Date Rec'd: 08/21109
Weather:
k~ad:
Total:
Supplier:
Knife River
Slump (in.): ASTM C143
Max. Aggr. Size:
Air Content: ASTM C231
.Air Temperature (F):
Material Temp, (F): ASTM C1064
Max Temp (F):
'Min Temp (F):
Specimen Size:
Unit Weight (pcf): ASTM C138
Time Cast: 7:15 AM
Additives:
Results Reported To:
.Field Test Data
11/2"
3/4"
'"
Plac~ment Data: > Mater ."I.~ Concrete
,Curb and gutter along G street, southside, between the two drivelanes (bus turn around and
'parent drop-off/visitor parking)' '
Location Sampled At:
,See placement Data
Date Cast: 08/20/09
Ticket No.: IMiX No.:
3442468 2436CE2009
Desil'ln Strenqth (Dsi):
" ,11
..1' - Co'ne (both erids) 2,~ ConeNerticalCracks (one end)
Remarks:
cc:
. Cylinder No,
09-1661
09.1662
09-1663
09-1664
Test Date
8/27/2009
9/17/2009
9/17/2009
9/17/2009
58~
75"
Yardage
4x8
f
9
Curing Conditions:
ASTM
Clear
Contractor
-
reauired 4:000
Compressive Strength Data ASTM C39
Dlaced 4,000
Age (days) Field Cure
(days)
7
28 1
28 1
28
.' Diameter or
Dimensions
(Inches)
Capping Method
Lab Cure
(days)
Cross Secl Area Cylinder WT.
(s.l,) (Ibs,)
Ma~. load (Ibs,) compip~~)ength Fracture Type" Test Time
C617 C1231
6
,27
27
27
3 - Columnar
4,00
12,57
8.4
48,945
3,890
2
1:43 PM
x
5 ~ Side frac _ureEj (at top of bottom)
J
6 ~ Top fractures (same as #5,but end of cylinder is pointed)
R~S ectfully submitted,
Pr ~t;;;;Ctries, Inc,
Seven E, Wilder
Laboratory Supervisor
4 ~ Diagona'l IN no cracking at ends
Springfield School District - Bill Hirsch
John Hyland Construction - Jeff Durmaj
Robertson Sherwood Architects. Dave Guadagni '
City of Springfield - Denny Wright
These results re/<jte only to the specific samples tested and may not be indicative of other locations, This report cannot be reproduced, except in full,
without written permission by Professional Service Industries, Inc,