Loading...
HomeMy WebLinkAboutPermit Plumbing 1997-7-3 . COMMERCIAL/INDUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 ~ . JOB NUMBER c:;.?...... ~-.a INSPECTION LINE: 726.3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORK' ~ 2~C> .~.hY' ASSESSORS MAP' ,r>~ -_'3~-/.o/ OWNER' -;:;"7~ p:f"?J'.r~ ADDRESS: ? /~~, ~ ~~ - '7 ~ 752- €-~~ TAX LOT' ~..."..---- PHONE: 64!ii::6-266":>' NEW REMODEL ~r....._~ " , ADDITION STATE: _~~ ~ 'ZIp: 7?~, ~- 7~~~ :?A?€"'~~~~ ~y.-"V ~~~ CITY' DESCRIPTION OF WORK: DEMOLISH OTHER VALUE: NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME GENERA' . PLUMBING: ADDRESS CaNST, CONTRACTOR N EXPIRES PHONE ',., Ii '~ - ~r' ~ MECHANICA' ' ELECTRICAl' PLUMBING NO FEE I ~HARG' j I I 7.<::'.-1 /-;a - Mr:CHANICAL '''' ~~~ ("l-.l4Dr.U:: Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent SuspenCled wall or floor mounted unIt heater Appliance Vent I separate Stationary evap. I cooler Vent Fan/Single I duct Vent System apart I from AC or htg. . Mechanical exhaust I hood and duct I Permit Issuance. $10.00 I TOTAL PERMIT I Single Fixture Relocated Bldg, (new fix, addtll Water Service ft, Sanitary Sew'!!.. ;.1 , , --? -7'.0 It. Storm Sewer 7~ ft, Backflow Device 1 '/ I I I I TOTAL PERMIT I I I "2~4 - OFFICE USE - HANDICAP ACCESS: FLOOO PLAIN' ZONING: ' LIGHTING POWER BUDGET: WATER HEATER' QUAD AREA' . OF BLDGF' LAND U"~' · OF UNITF' OCCY GROUP' . OF STORIES: CONSTR. TYPF' HEAT SOURCF' SO. FT, $/ SQ. FT. VALUE SO, FTG MAIN x X X SO, FTG ACCES" SQ, FTG OTHER TOTAL VALUE OF ,PROJECT PLAN CHECK FE!: RCPTN DAT~ BY I BUILDING PERMIT 15% State Surcharoe I MECHANICAL 15% Slate Surcharae I PAVING PLUMBING 5% State Surcharoe I FENCE V"II~ t I SIO-EWALK I CURBCUT ~ ~- '0. ..... h .-'" I DEMOLITION I J I I I FT, I SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT FT, TOTAL PERMIT FEES EXCLUDING ELECTRICAl ::4/6. -- . . Itla the respOnsibility of the permit holder to see that ell Inspections are made at the proper time, To request an Inspection, cal 726.3769 (recorder), state your City designated Job number, Job address, type of Inspection requested and when yOU will be read, for Inspection. Requeata received before 7:00 a,m. will be made the same working day, requests made after 7:00 a,m, will be mad, the following work day. SITE INSPECTION: To be, made after excavation, but prior to setup of forms. REQUIRED INSPECTIONS UNDERSLAB PLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these InspeCtions hsve been made and approved.' PAVING: After 'gravel Is In place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches Bre excavated and forms are ~ erected, all steel In place, but prior to placing c.oncrete. ATTIC DRAFT STOPS & CURTAIN WALLS SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Coda a special Inspector shalt be employed by the Ownerl Contractor during construction 01 the fOllowing Work. A copy of the special testing reports shall be furnished to the BUilding Division, FIREPLACE: Prior to placing facing materIals and before framing Inspection, CONCRETE SLAB: To be made after all Inslab building service equipment, conduIt, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and alt pipes, Chimneys and vents are complete and the "rough electrical, plumbing and mechanlca' are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S,1. (306 S,l) STRUCTURAL WELDS: Performed on the job, (2722 f) < UNDERGROUND: Plumbing, electrical, gas, s::InJt::tQ1 qPWA', ~torm ~'llWlr.,water and aralnage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations, (306 a.6) SPRAYED ON FIREPROOFING: U,B,C, Standards 43.6, UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor Sheathing. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,ll & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH ANDIOR GYPSUM BOARD: To be made after all lathing and gypsum board, InterIor and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the Clty'a Building Division before beams are placed, (2501 U,B,C, STDS, 25'10,11), STRUCTURAL MASONRY: (306 e,7) FLOOR INSULATtON & VAPOR BARRIERS: To be made prior to Inslallatlon of decking or floor Sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material In place. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. .'n addition to the Inspec. tlons specified, the Building Official may make or require CURB AND APPROACH other Inspectlone of any ROOF SHEATHING AND APRONS: After forms are construction work to enau'e NAILING: Prior to Installing erected but prior to placing ~rt~~;a~;:e~I~';,,~~~ g~~~~ng, any roof covering. concrete, _______________________ ----------------------- --------- SITE PLAN REVIEW BOARD: Must be requested 2 days In advance FINAL PLUMBING of the date you wish Inspection. All project conditions such as landscapIng, parking lot stripIng, etc. must ~e completed before requesting this Inspection, FINAL BUILDING: 'Requeeted efter the final plumbing, alectrlcal, mechanical and FIre Department Inspections Bra made end . approved No occupancy of the premises can be made until 8 Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENT!'" PLANS REVIEWED BY ----- / /,r~ // DATE 7"'~~,? t d a IIcatlon and do hereby certify thl't all Information By signature, I etate and ~g~~~ :~~:tlh~~v;e~~~~f~~~ ~~~~~:~I;h::r~~~~~o~me~Psha~ ~a do~:~n hae~:f~d:~~~h~~t~~h~g~~~~~c~~ ~~;~~ gt;~7 ;~~nCg~;~~~, 'and the Law:r~I~~~o~t~:~~: ~~~~f:gP;a7:~~I~I~I~~;~,eI7u~;he::~~lIy that onl; contractors and employees will be made of any structure without p d on this project. who are In compliance with ORS 701,055 will be use time that project address Is readable from the I further agree to ensure that all required Inhsp~~t~~n:f ~~eer:~;::t~~ ::'~ht~~r~~;;oved 'set of plans will remain on the site at all street, thai Ihe permit card Is located at t e, r , limes during consn 11'/4 Date 1/-1 ~ ?-- ","""" j r I' ;. 7_ -y.., "7 #' o.c:o DATE PAID' /'" . AMOUNT RECEIVED: {D. (' :;(' ........~ VALIDATION: 2&5/~ RECEIVED BV: r./';'" ~ RECEIPT N', ""