HomeMy WebLinkAboutPermit Plumbing 1997-8-15
COMM ERCIALIIN DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97'477
~
;l 67 2.E
... ....
JOB NUMBER27/ 2 Z ~
INSPECTION LINE: 726.3769
OFFICE: 726.3759
...... .....
.
ASSESSORS MApo
/7
,'{,.;;
IAA{lt/"t
1- /
S'-t-
LOCATION OF PROPOSEO WORK'
J0./0
CI,3
TAX ~~.~..~~.. O/76l
7<1(; 9C C /
OWNER'
ADDRES~o
CITY'
(6 ( Jll.1J To. l \
..7 ~ I d vv1. ~/'" S'-t
fTI"'.) :),_CJ
//A00({
STAT~'
OIL
'ZIP:
97'-17/
7)',.,99-
PHONE:
DESCRIPTION OF WORKo
NEW"< REMODEL
C-a.. ,
Pu.d.:::.
v"~IT,,,(/ ~
ADDITION
DEMOLISH
OTHER
VALUE:
NAME
ADDRESS
PHONE
ARCHITECT:
CONTRACTOR'S NAME ..::> a v..., 'C
GENERA' 0
ADDRESS
CONST.
CONTRACTOR'
EXPIRES
PHONE
PLUMBIN'"
MECHANICA' .
ELECTRICAl'
I PlUMRING I MG'f'l::IAf:il.C.AL
I NO FEE r.HARGF I I EEF "1:i6Dnc
I Single Flxlure Furnace/burner & vent
< 100.000 BTUs
I Relocaled Bldg. I I Furnace/burner & venl
(new Ilx. addlll > 100.000 BTUs
I I Water Service I I I Floor furnace and vent I
fl.
I I Sanitary Sewer I I I Suspended wall or floor I . I
It. mounted unit heater
, I I Storm Sewer I I Appliance Vent I Z--I ~~
fl. separate
I I Backtlow Device uA(~tv I Stationary evap. I I
cooler
I I (:"'tJ' PGtlr f~' Vent Fan/Single I I
duCI
., I <;0 CJOeJ ~7()1 Vent System apart I I
from AC or hlg.
, c-ll.6 r')vc.., I I MeChanical exhaust I I
hood and ducl
I :2 ~ S) ()cYd 6,U 141tS Wt5 I i 2~
I Permit Issuance. I S10.00
I TOTAL PERMIT TOTAL PERMIT .M1I'AJ .- I /S~
- OFFICE USE -
HANDICAP ACCESS:
FLOOD PLAIN'
ZONINC'o'
LIGHTING POWER BUOGET:
WATER HEATER:
o OUAD AREA'
LANO U"Fo
. OF BLDG'"
· OF UNIT~'
OCCY GROUP'
· OF STORIES'
CONSTR. TYPF'
HEAT SOURCF.
sa. FTo
s/sa. FTo
VALUE
sa. FTG MAIN
sa. FTG ACCESS
sao FTG OTH ER
X
X
X
TOTAL VALUE OF .PROJECT
PLAN CHECK FEr
RCPTM
DATF
BY,
I BUILDING PERMIT
15% Slate
Surchal}Je ,
MECHANICAL I
11S/h1""V~
5% Slale 7t-" ..,/1..
Surcharoe t J i-,.,:. j
I PAVING I
~:6'~
. I. 2.,;)
I PLUMBING
5% State
SurcharQe
FENCE
VALUE $
SIDEWALK
CURB CUT
I DEMOLITION
FT. ,
I
I SUBTOTAL
PERMITS
I SYSTEMS
DEVELOPMENT
FT.
.\:-"
. - I
.T01A~.PERMIT FEES
, EXCLUDING .ELECTRICAI
.2~ ,20
.
.
-~
.~.. ~
It Is the responsibility of the permit holder to see that all Inspections are made atlhe proper tlmeo To requeSI an Inspecllon, cal
726.3769 (recorder). state your City designated Job number, Job address. Iype of Inspection requested and when you will be read,
for Inspectlon,Requests received before 7:00 aom. will be made the same working day, requests made after 7:00 a.m. will be mad,
the following work day.
SITE INSPECTION: To be,
made after excavation, but
prior to setup of forms.
REQUIRED INSPECTIONS
UNDERSLAB PLUMBING,
. ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH'PLUMBING,
ELECTRICAL &
MECHANICAL: No work Is to
be covered until these
Inspecllons have been made
and approvedo
PAVING: After 'gravel Is In
place but prior to Placing
asphalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches Bre
excavated and forms Bre
erected, all steel In place, but
prior to placing concreteo
ATTIC DRAFT STOPS &
CURTAIN WALLS
SPECIAL INSPECTIONS: In accordance
Section 306 of Ihe State Speclslty Code
a special Inspector shall be employed
by the OWnerl Contractor during
construction of Ihe following Work. A
copy of the special testing reports shall
be furnished 10 the Building Division.
FIREPLACE: Prior to placing
faCing materials and before
framing Inspectlono
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduIt,
piping, accessories and other
anCillary equipment Items are
In place but before any
concrete Is placed.
FRAMING: To be made after
the roof, all framing, tire
blocking and bracing are In
place and all pipes, chimneys
and Vents are complete and
the 'rough electrical, plumbing
and mechanIcal are approved.
STRUCTURAL CONCRETE: In
excess of 2500 PS.1. (306 a.l)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERGROUND: Plumbing,
electrIcal, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to Covering or f/lllng
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applledo
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
HIGH STRENGTH BOLTING:
During all bolt Installsllon and
tightening operallons. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43.6.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor shealhlngo
- SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.l1 &
Chapler 29)
POST & BEAM: To be made
prior to Installation of floor
InSulation, decking or floor
Sheathing.
.
LATH ANDIOR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
Plastering Is applied or before
gypsum board Joints and
fasteners Bre taped and
finished.
GLU.LAM BEAMS: Inspecllon
Certificate by sn spproved
agency, furnished 10 the Clty's
Building Division betore
beams are placed. (2501 U.8,C.
STDS. 25'10,11)0
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415. .
SIDEWALK & DRIVEWAY:
Required for all concrete
paving wllhln slreel right of
way, to be made after all
excavating complete and form
work and sub-base material In
place.
Oln addition to the Inspec.
tlons specified, the Building
Official may make or require
" CURB AND APPROACH olher Inspections ot any
. ROOF SHEATHING AND APRONS: After forms are construction work 10 ensure
NAILING' Prior to Installing erected but prior to placing compliance with the BUilding,
. . any roof ~overlng. ---c~~r~~______________.3~~~':.':~lop~~n.:..~~:...._
---------~---------- SITE PLAN REVIEW BOARD: Must be requested 2 days In sdvance
FINAL PLUMBING of the date you wish Inspection, All project conditions Such as
landscaping, parking 101 striping, etc. musl ~e completed before
requesting this Inspecllono
FINAL BUILDING: Requested after the flna' plumbing, electrlcsl,
mechanical and Fire Oepartment Inspections are made and
'approved No Occupancy of the premises can be made until 8
Certlflcale of Occupancy has been Issued by Ihe Building Division
and posted on Ihe premises.
FINAL ELECTRICAL
./'
FINAL MECHANICAL
30"
...,
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENT'"
PLANS REVIEWED BY
. DATE
a IIcatlon and do hereby certify thl't alllnformsllon
~r;~~~;:~~f;~:f~~;~~~:':~~~~~~~i~;~~;~ll~~~~~t~t~ho~~ifrfi~gtl:~Ji~fl~~~;~~=,~~:~:,:::~r~:~::~C~~~~d5~it!:~::~s~:~!~~;~~:~~
t t ra without permlss on 0 e u
will be made of any s ruc u I I b sed on thle prolecto
who are In compliance with ORS 701.055 w leu time that project address Is readable trom the
h ' r e to ensure that all required Inspections are reqUeS\ed :~~hl~~r~~;;oved 'set 01 pla".s will remaln"on Ihe'slleat sll
I furt er ag e I d I localed at Ihe front ot the proper y, , \ . ,'.'.
slreet. Ihat the perm t car s, 0 '.0 0 .. 0 ,
limes during construction. ~
~-<< (2. ~ . Date
Signature / / I/,
VALIDATION:.
AMOUNT RECEIVED'
RECEIPT '0
Z-G;, .'2...:J
7.J76'71
DATE PAID:
RECEIVED BY'
o/%~
~(
, '