HomeMy WebLinkAboutPermit Building 1995-8-8
r
.
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
~
~OB NUMBER q5'Ab-:::> ,
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726-3769
OFFICE: 726-3759
~A.h</ ?~~-/,
" .
LOCATION OF PROPOSED WORK: :7 /~
ASSESSORS MAP' / ?~5~, v2.
OWNER:. /-(,f/~T~~;;r "-/~.>i "'t"- ~
~~. ,,~. ~ ~
ADDRESS:_/~-7,? ./'::~~-- )<f;>:> ~
C;./&;~~ ".
CITY'
TAX LOT:
"CJJ '2. "::>~
PHONF'
4/fi?-r -"3"? '?,/
STATE:
~.
ZIP: "'7?~';:"'" <--
'"'
~~.~
.jO (~6'<: -.:" ~ /.),~ V-~.!i )
OTHER VALUE: ~ -~ ..
, ,r
DESCRIPTION OF WORK: &~ -..~
,
NEW
~t
REMODEL
ADDITION
DEMOLISH
NAME
ADDRESS
PHONE
ARCHITECT:
CONTRACTOR'S NAME
GENERA' /~. /-~',:,-
" ~ ,.
PLUMBING'
CONST.
,g.,~~;::;""''''':a' .!::. ~_ CONTRACTOR' EXPIRES PHONE
_ ~~~7,_ ~/ ..9Y""'4" A~-?<-~
'*
- -
MECHANICA' '
ELECTRIC" , '
I
I NO
I
I
I
I
I
-I
I
I
I
I
I
I
PLUMBING
MECHANICAL
FEE
Nn ~I=I=
rl-l600C
CHARGE
Single Flxt'ure
Relocaled Bldg,
Inew fix, addU)
Water Service
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit healer
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duCI
Vent System apart
from AC or hlg,
Mechanical exhaust
hood and duct
Sanitary Sewer
It,
It.
Storm Sewer
It.
Backflow Device
, '
Permit Issuance
$10,00
TOTAL PERMIT
TOTAL PERMIT
- OFFICE USE -
LAND USF'
HANDICAP ACCESS:
OUAD AREA:
FLOOD- PLAIN:
. OF BLDGS:
. OF UNITS:
CONSTR, TYp.,
HEAT SOURC.'
ZONING:
LIGHTING POWER BUDGET:
OCCY GROUP:
. OF STORIES:
WATER HEATER'
sa, FT,
$/SO. FT,
VALUE
sa, FTG MAIN
SO, FTG ACCESS"
sa, FTG OTHER
x
x
x
TOTAL VALUE OF PROJECT
PLAN CHECK FEE
RC PP
DATF
BY
I BUILDING PERMIT I
15% Stale 7'1'
SurcharQe .r1J
I MECHANICAL
15% Slate I
Surcharoe ..
I PAVING ~ I "
/ /.~_7t?
. 3> ;)
."3":z. _
I PLUMBING
'DEMOLITION
5% State
SurcharQe
FENCE
VALUE $
I SIDEWALK
I CURBCUT
FT,
SUBTOTAL ""
PERMITS ' "-\- -,
SYSTEMS
DEVELOPMENT
,~ ,
FT,
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
1/9,?.r
.
REQUIRED INSPECTIONS .
,
It Is the responsibility of the permit holder to see that all Inspections are made at the proper time, To request an Inspection, call
726.3769 (recorder), state your City designated Job number, Job address. type of Inspection requested and when you wUI be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. wll] be made
the following work day,
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING.
ELECTRICAL 8.'
MECHANICAL: No work Is to
be covered until these
Inspections have been made
and approved.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
..'
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete. .
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
,Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division,
ATTIC DRAFT STOPS &
CURTAIN WALLS
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches. -
FRAMING: To be made after
the roof, all framing. fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanIcal are approved.
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied,
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
STRUCTURAL CONCRETE: In
excess of 2500 P'S,1. (306 a,1)
CONCRETE SLAB: To be
made after all Inslab building
'Service equipment, conduit,
piping, accessories and other
ancIllary equipment items are
In place but before any
concrete Is placed.
STRUCTURAL WELDS:
Performed on the job, (2722 f)
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations, (306
a,6)
SPRAYED ON
FIREPROOFING: U.B,C,
Standards 43.8,
UNDERFLOOR: Plumbing.
electrical, mechanical. To be
made prIor to Installation of
floor Insulation, decking or
floor sheathing.
SPECIAL GRAOING,
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing,
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board.
Interior and exterIor, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished,
GLU-LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed, (2501 U.B.G,
STDS, 25-10,11),
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material In
place,
y
STRUCTURAL MASONRY: (306
a,7)
;Pr.l)'.:V-~ 0'~"h"::'
~ - . f ("~" , r
~~/~~-:-""
MASONRY: Steel location,
bond beams grouting or
verticals In accordance wIth
UBC 2415,
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
"In addition to the Inspec-
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code,
-------------------------------------------------------
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection, All project conditions such as
landscaping, parking lot stripIng, etc. must be completed before
requesting thIs Inspection.
FINAL ELECTRICAL
FINAL MECHANICAL
.r
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
OAT"
By sIgnature, I state and agree, that I have carefully examIned the completed application and do hereby certify thf-t all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division, I further certify. that only contractors and employees
who are In compliance with ORS 701,055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the
street, tha~the ermlt card Is loc ed at the front of the property, and the approved set of plans will remain on the site at all
tImes during onstruct~
Signature ~.~ ~--r-' Date v.~J7'~ -
VALIDATION:
AMOUNT RECEIVED: //~.?-r-
/~y/
RECEI PT .'
DATE PAID:
RECEIVED BY:
'i2' -e.::;;..<;--
+--