Loading...
HomeMy WebLinkAboutPermit Building 1995-8-8 r . COMMERCIAL/INDUSTRIAL PERMIT APPLICATION ~ ~OB NUMBER q5'Ab-:::> , 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726-3769 OFFICE: 726-3759 ~A.h</ ?~~-/, " . LOCATION OF PROPOSED WORK: :7 /~ ASSESSORS MAP' / ?~5~, v2. OWNER:. /-(,f/~T~~;;r "-/~.>i "'t"- ~ ~~. ,,~. ~ ~ ADDRESS:_/~-7,? ./'::~~-- )<f;>:> ~ C;./&;~~ ". CITY' TAX LOT: "CJJ '2. "::>~ PHONF' 4/fi?-r -"3"? '?,/ STATE: ~. ZIP: "'7?~';:"'" <-- '"' ~~.~ .jO (~6'<: -.:" ~ /.),~ V-~.!i ) OTHER VALUE: ~ -~ .. , ,r DESCRIPTION OF WORK: &~ -..~ , NEW ~t REMODEL ADDITION DEMOLISH NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME GENERA' /~. /-~',:,- " ~ ,. PLUMBING' CONST. ,g.,~~;::;""''''':a' .!::. ~_ CONTRACTOR' EXPIRES PHONE _ ~~~7,_ ~/ ..9Y""'4" A~-?<-~ '* - - MECHANICA' ' ELECTRIC" , ' I I NO I I I I I -I I I I I I I PLUMBING MECHANICAL FEE Nn ~I=I= rl-l600C CHARGE Single Flxt'ure Relocaled Bldg, Inew fix, addU) Water Service Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit healer Appliance Vent separate Stationary evap. cooler Vent Fan/Single duCI Vent System apart from AC or hlg, Mechanical exhaust hood and duct Sanitary Sewer It, It. Storm Sewer It. Backflow Device , ' Permit Issuance $10,00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - LAND USF' HANDICAP ACCESS: OUAD AREA: FLOOD- PLAIN: . OF BLDGS: . OF UNITS: CONSTR, TYp., HEAT SOURC.' ZONING: LIGHTING POWER BUDGET: OCCY GROUP: . OF STORIES: WATER HEATER' sa, FT, $/SO. FT, VALUE sa, FTG MAIN SO, FTG ACCESS" sa, FTG OTHER x x x TOTAL VALUE OF PROJECT PLAN CHECK FEE RC PP DATF BY I BUILDING PERMIT I 15% Stale 7'1' SurcharQe .r1J I MECHANICAL 15% Slate I Surcharoe .. I PAVING ~ I " / /.~_7t? . 3> ;) ."3":z. _ I PLUMBING 'DEMOLITION 5% State SurcharQe FENCE VALUE $ I SIDEWALK I CURBCUT FT, SUBTOTAL "" PERMITS ' "-\- -, SYSTEMS DEVELOPMENT ,~ , FT, TOTAL PERMIT FEES I EXCLUDING ELECTRICA' 1/9,?.r . REQUIRED INSPECTIONS . , It Is the responsibility of the permit holder to see that all Inspections are made at the proper time, To request an Inspection, call 726.3769 (recorder), state your City designated Job number, Job address. type of Inspection requested and when you wUI be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. wll] be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING. ELECTRICAL 8.' MECHANICAL: No work Is to be covered until these Inspections have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete. ..' FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. . FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance ,Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, ATTIC DRAFT STOPS & CURTAIN WALLS UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. - FRAMING: To be made after the roof, all framing. fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanIcal are approved. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied, FIRE & SEPARATION WALL: Located and constructed according to plans. STRUCTURAL CONCRETE: In excess of 2500 P'S,1. (306 a,1) CONCRETE SLAB: To be made after all Inslab building 'Service equipment, conduit, piping, accessories and other ancIllary equipment items are In place but before any concrete Is placed. STRUCTURAL WELDS: Performed on the job, (2722 f) HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations, (306 a,6) SPRAYED ON FIREPROOFING: U.B,C, Standards 43.8, UNDERFLOOR: Plumbing. electrical, mechanical. To be made prIor to Installation of floor Insulation, decking or floor sheathing. SPECIAL GRAOING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing, LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board. Interior and exterIor, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished, GLU-LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 U.B.G, STDS, 25-10,11), FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material In place, y STRUCTURAL MASONRY: (306 a,7) ;Pr.l)'.:V-~ 0'~"h"::' ~ - . f ("~" , r ~~/~~-:-"" MASONRY: Steel location, bond beams grouting or verticals In accordance wIth UBC 2415, ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. "In addition to the Inspec- tions specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code, ------------------------------------------------------- FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project conditions such as landscaping, parking lot stripIng, etc. must be completed before requesting thIs Inspection. FINAL ELECTRICAL FINAL MECHANICAL .r FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY OAT" By sIgnature, I state and agree, that I have carefully examIned the completed application and do hereby certify thf-t all Information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division, I further certify. that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, tha~the ermlt card Is loc ed at the front of the property, and the approved set of plans will remain on the site at all tImes during onstruct~ Signature ~.~ ~--r-' Date v.~J7'~ - VALIDATION: AMOUNT RECEIVED: //~.?-r- /~y/ RECEI PT .' DATE PAID: RECEIVED BY: 'i2' -e.::;;..<;-- +--