HomeMy WebLinkAboutPermit Building 1997-7-2
~.
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
~
."
'JOB NUMBER 97 /d/c6
INSPECTION LINE: 726.3769
OFFICE: 726.3759
~ S1.
LOCATION OF PROPOSED WORi<. :?-O Z-6
ASSESSORS MAP:/?o.~ ~.~ -~
s..rtJ.
TAX LOT' .4?:? ~
PHONE: UL -(". .5 ell
OWNER' '~O~..... ~ L n-.I1. """"- . L: I... r
ADDRESS' t8 3 6&S' s: "Q. :,,,iv \ \.,1.; II LA AI~
CITY:--il..... i......A- \4.,\\\ ~~.~-STAT~. 0 (L
ZIP:_O J"I r,
o .{ "- \ < . / A / C""l...
DESCRIPTION OF WORK:\'rn 1f'''-1~ Ii' ....Oll!. ...~..,!. R.'GfJvUI S.-t. '"+Irf /I1"'M8(l~ ~"'r Ol/~O "LA] t .-.:
NEW REMODEL ADDITION DEM~L1SH OTHER VALUE: 3(/ It. ~
CDNTRACTOR'S NAME ADDRESS
GENERA" \.AI; VI a. .....di-.L fLcu.{;..at e-
/ ~1f:f.
~ /1:/7'~
NAME
ARCHITECT'
PLUMBING'
MECHANICA' .
ELECTRICA' .
PLUMBING
NO.
I
I
ft. I
It. I
II. I
I
- I
;; / 1-+ I
/ V / I
I
I
Single Fixture
Relocaled Bldg.
lnew fix. addtll
Water Service
Sanitary Sewer
Storm Sewer
Backtlow Device
.,
TOTAL PERMIT
OUAD AREA'
. OF BLDG'"
OCCY GROUP'
. OF STORIES: J -<t
SO. FTG MAIN
SO. FTG ACCESF
SO. FTG OTHER
So. FT.
/ ~ miJ
PLAN CHECK FFO
I BUILDING PERMIT
15% State
Surcharae
I MECHANICAL
15% Slate
Surcharoe
, PAVING
/?;J....Q
~.<15~ -
~ .,~
ADDRESS
PHONE
CONST.
CONTRACTOR'
I.:S'\/.L
EXPIRES
r-4Jr
PHONE
{. g 8 /.J(J (Ft7
A
~
FEE
I
II
1
1
I
1
I
I
I
1//1
/UI I'
I
I
I
CHARGE
MECHANICAL
Furnace/burner & venl
< 100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Floor furnece end venl
Suspended wall or lIoor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
Irom AC or hlg.
Mechanical exhaust
hood and ducl
I
1
I
I
1
I
I
Permit Issuance.
TOTAL PERMIT
- OFFICE USE -
LAND USE:
HANDICAP ACCESS:
FLOOD PLAIN.
ZONING' .
LIGHTING POWER BUDGET:
WATER HEATER.
. OF UNITS'
CONSTR. TYp.,
HEAT SOURro.
X
$'So. FT.
0]
VALUE
7 J. 000
x
X
,
000
~I
I
I
I
I"
I
I
I, $10.00
I
TOTAL VALUE OF .PROJECT
?df~
RCPP
DATF
BY,
PLUMBING
DEMOLITION
5% State
SurcharlJe
FENCE
VAlliE $
SIDEWALK-
SUBTOTAL
PERMITS
SYSTEMS
DEVELOPMENT
CURBCUT
FT.
FT.
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
2.~B. S/y
I
I
I
e
.'
It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, cal
726.3769 (recorder), state your City deslgnaled Job number, Job address, lype of Inspection requeSled and when yOU will be read:
for Inspection. Requests received before 7:00 a.m. will be made Ihe same working day, requests made after 7:00 a.m. will be mad,
the following work day.
SITE INSPECTION: To be,
-made after excavation, but
prior to setup of forms.
REQUIRED INSPECTIONS
UNDERSLAB PLUMBING,
, ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No Work Is to
be covered until these
Inspections have been made
and approved.
PAVIN G: AHer 'gravel Is In
place but prior to placing
asphalt or concrete.
\
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
ATTIC DRAFT STOPS &
CURTAIN WALLS
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specially Code
a special Inspector shall be employed
by the Ownerl Contractor during
construction of the fOllowing Work. A
copy of the special testing reporrs shall
be furnished to the Building Division.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
CONCRETE SLAB: To be
made aHer all Inslab building
service equIpment, conduIt,
piping, accessories and other
ancltlary equipment Items are
In place but before any
concrele Is placed.
- FRAMING: To be made aHer
Ihe roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are com prete and
Ihe 'rough elactrlcal, plumbing
and mechanlcar are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.I. (306 a.l)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage Ilnes. To be made
prior to Covering or fIlllng
trenches.
INSULATION & VAPOR
BARRIER: To be made aHer all
Insulallon and required Vapor
barriers are In place but
before any lath or gypsum
board InterIor wall covering Is
applied.
FIRE & SEPARATION WALL:
Located and cOnstrucled
according to plans.
HIGH STRENGTH BOLTING:
During all boll Install all on and
tightening Operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43.8.
UNDERFLOOR: Plumbing,
eleclrlcal, mechanical. To be
made prior to Installallon of
floor Insulation, decking or
floor sheathing.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earrhwork. (306 a.ll &
Chapter 29)
POST & BEAM: To be made
prior to Inslallallon of floor
Insulation, decking or floor
Sheathing.
LATH AND'OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
PlasterIng Is spplled or before
gypsum board Joints snd
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the Clly's
Building Division before
beams are placed. (2501 U.B.C,
STDS. 25.10,11).
STRUCTURAL MASONRY: (306
a.7)
~~4v .
v ~....C':>...;>
~~,~~~.
'In addlllon 10 the Inspec.
lions specified, Ihe Building
Official may make or require
CURB AND APPROACH other Inspections of any
ROOF SHEATHING AND APRONS: AHer forms are 'construcllon work to ensure
NAILING. Prior to Installlng erected but prior to placing compllsnce wllh the Building,
f . I concrete Clly or Development COde.
any roo Cover ng. _____________-:.____________________________
-----,-------- SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
FINAL PLUMBING Of the date you wish Inspection. All project condlllons such as
landscaping, parking lot striping, etc. must pe completed before
requesllng this Inspection.
FINAL BUILDING: Requested alter the flnsl plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved No occupancy of the premises can be made until 8
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor Sheathing.
SIDEWALK & DRIVEWAY:
Required for all Cone rate
paving within slreet right of
way, to be made after all
excavallng complete and form
work and sub.bsse material In
place.
)(
MASONRY: Steel location,
bond beams groullng or
verllcals In accordsnce with
UBC 2415.
y
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENT1='.
PLANS REVIEWED BY
. DATE,
IIcatlon and do hereby certify thl't slllnfermatlon
:i:?;li:~:; ~::~~::f,::~~!::~:::z~gii;?~;~~EggJ~::~:~r_:::.~;~::T~~o;::,:::t~.~J~1,:~~
will be made of any structure without pe ed on this project. "
who are In compliance with ORS 701.055 will be us r lime t'hat project address Is readable from the
I further agree to ensure that all required Insp~~~~n~ ~~eer~~;:r\:~ :~~ht~~r~~;roved 'set 01 plans will remain on the site st all
street, that the permit card Is located at the~ 6"7
times durin onstructlon'r ~ I 1,- ~ ~ I
/./ ....-;:; , 7 ~ Oat'
Signa ~;-/ ~c/A./f~7 -....::r~-
~,<vy DATE PAID: 7-5-J?
P' AMOUNT RECEIVED', ./ --1"" -..,
rVALlDATION: , "2.-'-s/~O RECEIVED BY: ~_ ~
RECEIPT': .. /Lf'