HomeMy WebLinkAboutPermit Electrical 1982-3-16 (2)
I'~ ~
INSPECTION LINE
726-3769
,I
I
I
I
I
legal Description
n.. C~,; /t7~
CITY OF SPRINGFIELD
COMBINATION APPLICATION/PERMIT
I ENERGY SOURCES:
Heat
Water Heater
RO"_$I"
Value of Work:
..
INFORMATION LINE
726-3753
..
Job Add,e"
{elf"
1!lt~JI!.V
/7-r,;z -fpj.'.:.fJ,- '-!L
,
Sq. fig. Main
Sq. Ftg. Acun.
Sq. Fig. Other
_New_Add_Alte,_Rep.
_Fence_Oemo_Change/UI8
_Other
~
~
....
~.
Addre"
/.(;t..,-u.-
Phone
Building Permit Info: Describe Work (i.e" Build Single
Family Residence With Attached Garcae)
...\::)
~
Owner
~I
, I' I
Construction lend.r
t)~,r7
/0.1 ..-J..-.. I
(fLit ."'A",,'1 ,',4.J4 II
n~
Add,e..
I DESIGN TEAM
I Primary
I Structural
Elettrical
.Mechanical
CONTRACTORS
General
PIJmbina
Electrical
Mecnanical
Phone
(name)
(address)
(lies. no.)
(exp;'.,) . i. '
-'r
(phone no.)
(nome)
(address)
(lies. no.)
(exoi,e,)
(ohon" no,)
PLUMBING
ELECTRICAL
FEE . CHARGE NO. FEE . CHARGE NO,
Residence of
'9' ft. \'"..,...
New circuits, alterations
i or extensions /1).Pf}
SERVICES
Temporary Construction
Amps.
..
FEEDERS
Amps.
.. .. '..
MECHANICAL
NO. .
FEE . CHARGE
Dualex (I bath) each
furnace/burner to
'''.TU's
Appliance ...ent /
separate
Stationary ....ap.
cooler
Vent fan with
sinale duct
Vent system aport from
heatinA or A.C.
Mechanical exhaust
hood and duct
Each sinale fixture
Relocated building
(n.w fix. additional)
S.F. R.sid.nce
(1 both)
Additional bath
Wat.r s.nice
Storm Sewer
H.at Puma
Air handl.r to
10.000 CfM
Air handl.r o....r
10.000 CfM
"
I
I
I
I
I
I
i
S.w.r
Wood .to..../h.ater
,.~.
ISSUANCE OF PERMIT
TOTAL CHARGES
TorAL CHARGES
iJ, iJ.f. TOTAL CHARGES
WHERE STATE LAW REQUIRES that the Electrical work be done by .he Electrical Contractor, .he .I.ctrical portion of Ihi. permit shall no' be valid until a
lab.1 has b..n .igned by an Electrical Contrador and attadHtd to the olemical panel.
I HA VE CAREfULLY EXAMINED the completed application for permit, and do hereby certify that 011 information hereon I. true and correct, and I further
c.rtify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfi.ld and the law. of the Sta_ of o,egon
pertaining to the work de.cribed herin, and that NO OCCUPANCY will be made of any .tructure without the permission of the Building Divi.ion. I further
certlfy that my registration with the Builder'. Board is in full force and cPffect as required by ORS 701.055, that if exempt the ba.i. for exemption i. noted
heron, and that only subcontractors and employee. who are in compliance with ORS 701.055 will be used an this project. .
Basis for Builde,'. Board exemptio~ . .
NAME (please print) ~ D IJ ,~"'- tC.....
CIGNATURE
fOR OffiCE USE ONLY
'R._ (f)
~~TE >.l1hLj
Zone
fire Zone
Flood Plain
Type/ Canst.
'l.tJdraom.
c.'orle~
Unit-
ntcy Load
"'ccy Group
~. Fig. Main
Sq. fig. Access
Sq. fig. Other
.
Value
x Value
x Value
TOTAL VALUATION
BUILDING PERMIT
Charges and
Surcharges
Plan Ck. Comm/lnd
65%/ Bldo Per Fe.
Plan Ck. Re.
30%/ Bldo P.r Fe.
System. De....lopm.nt
Chara. n.S,,"l
PLUMBING PERMIT
Charge. and
Surcharge.
fence
Demo
l Total Comb. Permit
ELECTRICAL PERMIT
Charg.s and
Surcharge.
//.i.?6
. ..f;~
Sidewalk
AIC Pavina
MECHANICAL PERMIT
Charges and
Surcharges
Curb Cut
I TOTAL
lIt'. Iii)
COMBINATION APPLlCA T10N/PER.P)
I. Applicant to furnish
A. Job Address
B. legal Description
1. example.tax lot 100, lane County Map Reference
2. example-Lot 1. Block 3, 2nd Addition to Springfield
C. Name, etc. of owner and construction lender
D. Energy Sources
1. example-heat/electrical ceiling/or forced air gas
2. example-water heater/electrical/or solar
E. Square footage or valuation, etc.
1. exomple.1250 sq. foot house, 500 sq. foot garage
2. example-if new project, check new-if addition, chec
add, etc.
F. Building permit information:
1. example-construct single family house with an atta
garage
2. example-remodel existing garage into family roort'
3. example-convert' single family residence into
restaurant (ch.ange of use)
G. Value of work os defined in Section 303 (a) of the
Structural Specialty Code
H. DESIGN TEAM AND CONTRACTORS
To avoid design or construction delays, Bui.iding Divis
Staff must be able to contact appropriate persons reg
design information or job site corrections, etc.
II. Abbreviated Plumbing, Mechanical & Electrical Schedule:
A. Except where blank spaces occur in the description pc
of the Mechanical and Electrical Schedules, the applic
need fill-in only the No. Boxes adiacentto the approl .
item(s) to be installed
B. Full Plumbing, Mechanical, and Electrical Schedules
are available at the Building Division
1. To conserve space on the permit form the schedul.
have been abbreviated
2. If the item(s) to be inslalled are not covered on th
ated schedules you should consult the full schedul
C. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES"
CHARGES ON THE SCHEDULES
(
'"
CITYr. SPRIN.GFIE~D~
City Hall
Springfield, Oregon
Department of Public Work.
OFFICIAL RECEIPT
,(
'I
ptt
No.
~ - ( In 19 f(z..
Rec'd From r ~.(JJ fJ/J.<I~L
Address fJ ,u.t ~t I ~ ~'
Q/J_
Date
B 58218(1
(
,~
i"
d
_d
Received For:
tYh. "p,~ 4"-':~
, 4'?~
CI
1I/0,~
,I#,
#//J:ik,-
(
(l
(
J. f;"\ il ,q Lt
r- ! r~
(I
(
(I
('
(,
,~
I
",
"
(/
Ii //J, t/()
Amount. Receive~.~
~~ "'
-Z',.I
lw.L
(
AUT"'OIUZI:O SIO,.."TUlUl:
.HIUO...YU.....UlL ".'10'11:"1' I:UGI"., 011 ".01
i
..."., \...
(
(
III. Applicant to sign and date l-:- ,
Whenever possible. the initial application will be used as a
worksheet only. Where possible, Building Division Staff will
prepare a typewritten copy and return it to the applicant at
the time the actual permit is issued for his signature.
IV. Fees and Charges
Plan check fees are due and payable at the time of the application,
and no plans will be processed until these fees are paid. All
other fees and charges are due ond payable when the permit
is issued.
V. FOR OFFICE USE ONLY
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPANCY:
Additionol Project Informotion:
PLANS REVIEWED BY:
name
signaturr-- .
Permit Cier"
""ate