HomeMy WebLinkAboutPermit Building 1992-7-8
O?JI//A /l i:Y 'u0))('')
) "7"'7/, ./Y7 A-u } 0/ .-
~r)
A1i)
RESIDENTIAL
PERMIT APPLICATION
Inspections: 7126.3769
Office: 726.3709
),
LOCATION Of PROPOSED WORK'
/7ns
ASSEssor~s MAP:
LOT:
OWNER: ....__
ADDRESS:
CITY:
/'1rt0
Sr-.,
.JvI~/L}
~ I
;?T:
BLOCK'
STATE:
/JU
DESCRIBE WORK:
7>M.m~ r Av.r
NEW
REMODEL
~THER
CONST,
%~~Af~R .
ADDITION
DEMOLISH
CONTRACTOR'S NAME ADDRESS
GENERAL _.JotW_c::i6u~_4.-f2L~5~
PLUMBING:.. ___._
MECHANICAL'
ELECTRICAL'
QUAD AREA:
. OF BLOGS:
OCCY GROUP:
II OF STORIES:
WATER HEATI~R'
- OFFICE USE -
LAND USE:
. OF UNIT'"
CONSTR, TYPE:
HEAT SOURCE:
RANGE:
IB NUMBER 9r7/rJ),5'
225 Fillll Street
Sprln9f1eld, Omllon 97477
TAX LOT:
C)/5'oo
SUBDIVISION:
PHONE:
74/ - 24"?,:;-
ZIP: '7 ?G::>
~~
V
EXPIRES
_1/22hJ
, ,
PHONE
~73-Zm
FLOOD PLAIN:
ZONING CODE:
. OF BDRMS:
SECONDARY HEAT:
SQUARE FOOTAGE:
To request an inspection, you must call 726.3769. This Is a 24 hour recording. All Inspections requested before 7:00 {l,m, will be
mBclc ttlC same working day, Inspections requested after 7:00 a.m. will be made the following work day.
o Temporary Electric
D Site Inspection - To be made
aller eXI:avalion, but prior 10
sctlina torms.
o Undcrslab Plumbing/Electricall
Mechanical - Prior to cover.
o Footing - After trenches are
excavalud. .
o
Masonry - Stce:! location, bond
boalns, orouting.
o Foundation - Afler torms arc
erectecl but prior to concrete
placement.
o
Underground Plumbing - Prior
to filling trench.
o
Underlloor Plumbing/Mechanical
_ Prior 10 insulation or decking.
CI ~ost a,:,d Beam -. Prior to floor
IIlsulutlon or decking.
o Floor Insulation - Prior to
decking.
o Sanitary Sewer - Prior to filling
trench.
o Storm Sewer - Prior to filling
trench.
I I Wuter Lino - Prior to filling
trench.
o Rough Plumbing - Prior 10
cover.
REQUIRED INSPECTIONS
o Rough Mechanical - Prior to
cover.
D Rough Elecllical - Prior to
cover.
o Electrical Service - Must be
approved to obtain permanent
electrical power.
o Fireplace - PrIor to facing
materials amJ framing Insp.
%Framing - Prior to cover.
o Wall/Ceiling Insulation - Prior to
cover.
o Drywall - Prior to taping.
o Wood Stove - After installation.
o Insert - After fireplace approval
ancl Installation of unit.
o Curbcul & Approach - After
forms are erected but prior 10
placement of concrete.
I:=J Sidewalk & Driveway - After
excavation Is complete, forms
and sub-base material in place.
o Fence - Wlwn completed.
o Stroet Trees - When all required
trees are planted.
o Final Plumbing - WIH,m all
plumbing worl( Is complete.
o Final Electricnl - Wllt..:n nil
electrical work is cOlllplcle.
o Finnl Mechnnlcal - When alt
mecllantcal work Is cOlllpletc.
~inal Building - When :111
;~:~'reQllired inspecttons hnve been
approved and bllildinU is
completed.
o Other
MOBILE HOME INSPECTIONS
o Blocking and Set.Up ....:. When all
blocking Is complete.
o Plumbing Connections - Wilen
home has been connected to
water and sew'er.
o
Electrical Connection - WllUll
blocking, set.up, anel plulIllJinu
inslJcctions l13ve been approvlJ(1
and the home is connected to
the service panel.
o
Final - After all required
inspections are approvc(J and
porches, skirting, decl(s, and
venting have been installed.
Lot faces Lot Type. Setbacks J: THE PROPOSED WORK IN THE
Lot sq, fig, Interior I PL. HSE GAR ACC I ISTORICAL DISTRICT, OR ON
IN I THE HISTORICAL REGISTER?
Lot coverage Corner If yes, this application must be signed
Is I and approved by tile Historical
Topography Panhandle Iw I Coordinator prior to permit issuance.
Total height Cul-de.sac
IE I APPROVED'
BUILDING PERMIT
ITEM SQ, FT, X $/SQ, FT.
VALUE
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
Main
"Ill/A) .
This permit Is granted on the express condition ttlat the said
constructlon shall,ln all respects, conform to tile Ordinance
adopted' by the City of Springfield, including tllO
Development Code, regulating the construction and use of
buildings, and may be suspended or revol(ed at any time
upon violation of any provisions of said ordinances.
Garage
Carport
Plan Check Fee'
Total Value
#5A9~
J~~
.7S"
/,~ 7S-
SYSTEMS DEVELOPMENT CHARGE (SDC)
Date Paid:
Receipt Number'
Building Permit Fee
Received By:
State Surcharge
Total Fee
(A)
Plans Reviewed By
Dale
(B)
Systems Development Charge Is due on all undeveloped
properties within the City limits which are being improved.
PLUMBING PERMIT
ITEM
ADDITIONAL COMMENTS
FEE
Fixtures
Residential Bath(s) NO
Sanitary Sewer FT.
Water
FT,
Storm Sewer
FT.,
Mobile Home
Plumbing Permit
Stale Surcharge
Total Charge
(C)
MECHANICAL PERMIT
Furnace
Vent Fan
N'
By sIgnature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all
Information hereon is true and correct, and I further certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of ?regon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are In compliance with OAS 701.055 will be used on this
project.
Exhaust Hood
Wood Stove/Insert/Fireplace Unit
Dryer Ven t
Mechanical Permit
Issuance
State Surcharge
Tolal Permit
(D)
I further agree to ensure that all required inspections arc
requesled at the proper time, that each address is readable
from the street, that the permit card is located at the front
of the property, and the a set of plan:; will remain
on the sIte at 1m cUon.
MISCELLANEOUS PERMITS
Mobile Home
Sidewalk
It
Date
:;:;.----:
~~
State Issuance
~ignaturf' '
I
"'2
/
State Surcharge
Curbcut
It
Demolition
State Surcharge
VALIDATION:
RECEIPT NUMBER
:;-../$:;--
~.q/92.
''25,7S
/~
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Combined)
;s'.7$'
DATE PAID
AMOUNT RECEIVED
RECEIVED BY
Tolal Miscellaneous Permits (E)