CITY OF SPRINGFIELD SYSTBKS DBVBLOPMKNT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: DAVID CLYDE
Location: 1714 MAIN ST
Developement Type: C Building Size:
1. STORM DRAINAGE
Impervious Sq Ft 1.0 X 0
2. SANITARY SEWSR
Number Of PFUs
(see Page 2)
- CITY
1. 0 X 10
3. TRANSPORTATION
Number Of Units X
Trip Rate
Transportation Total
4. SANITARY SIlWER - KWHC
Number Of PFUs
o
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1. 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
TOTAL SDC
Reviewed By: TROY MCALLISTER
X
x
X
Job No.: 960487A
Lot Size:
X
0.216
Per Sq Ft
44.75
Per PFU =
X
Cost Per Trip
Per PFU + MWMC Admin Fee
20.690
0.50
Date: 03/05/97
=
Page 1
" "it
$0.00
$447.50
$0.00
$0.00
$0.00
$0.00
$447.50
$22.38
$469.88
.
Job Number: 960487A
.
Page 2
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS =
Number of
New Fixture
Unit
Equivalent
Fixture
Units
o
o
o
o
o
o
o
o
o
o
o
o
1
2
1
o
o
2
1
2
3
6
2
6,
1
3
2
o
o
o
o
o
o
o
o
o
o
o
o
2
2
6
o
o
2
2
1
6
4
10
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
o
x
0.00 ~
0.00
o
X
0.00 =
0.00
CREDIT TOTAL =
$0.00
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)
COMMERCIALlINDUSTRIA~
PERMIT APPLICATION
~
.
JOB NUMBER 9~G'Y"A'''' !~
INSPECTION LINE: 726.3769
OFFICE: 726.3759
225 Fifth Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK' /7/'" ~#/R/ "5.?':
ASSESSORS MAP: 1'7 Y> ~~_."tt: ~ ~ J
TAX LOT: t::J/.l!r~
OWNER: J/1'V4//"( ~E r ~/R~
ADDRES;' 6~ E""' /~ 727,.4lYE
~p~c.&7E
/ ~HONF' '=? ~ ~ ~ ?d'"
. "I _ .,. _
CITY:
STATF'
~~.
ZIP'
9'7 "Y'tP/.
DESCRIPTION OF WORK: ~~'"'~ 7k~e5 ::~~~ ,?:; r:;;...,....-'"'; !?'
TM-/.CC ~ V';.dI~ -~~,...~e_.......~ ~
NEW REMODEL ADDITI N "i>E~~H OTHER VALUE: /-?-'~e
"
NAME
ADDRESS
PHONE
ARCHITECT'
34.S-S- (!~ CaNST. ~..<?"#,)If~~
CONTRACTOR'S NAME ADDR~~ a _ CONTRACTOR' ExpiRES PHONE
GENERAL:.LS-~ ~~-?t'................ ~:::;~ ~.:;,~- ~~~ ~'7"J97 ~41-~?,,?
PLUMBING:~+-r~~~_ ' '/ '
MECHANICAL:~
ELECTRICAl'
PLUMBING MECHANtCAL J
NO, I FEEj___C~4Rn~ Mn ~.. f'I:lABGj
FurnaceJ burner & vent
" Single Fixture 1/4i'. ~.- < 100,000 BTUs
Relocated Bldg, I Furnace/burner & vent I
(new fix. addtl! > 100,000 BTUs
Water Service Floor furnace and vent J
ft.
Sanitary Sewer I Suspended wall or floor r
It. mounted unit heater
Storm Sewer 1 Appliance Venl
ft. separate
I Stationary evap. /??/j
Backflow Device cooler
1 :z Vent Fan/Single /.te;'.-I
duct
I Vent System apart 1 I
from AC or htg.
I Mechanical exhaust I
hood and duct
I I
I I Permit Issuance $10,00 I
TOTAL PERMIT 1 9~. ...z> I TOTAL PERMIT I
- OFFICE USE -
HANDICAP ACCESS:
OUAD AREA'
LAND US.'
FLOOD PLAIN:
ZONIN(:'
. OF BLDG~'
. OF UNIT~'
OCCY GROUP:
"
CONSTR. TYp.'
LIGHTING POWER BUDGET:
. OF STORIE~'
HEAT SOURCE:
WATER HEATER'
SO, FT.
$/ SO. FT.
VALUE
SO, FTG MAIN
X
SO. FTG ACCES~ X
SO, FTG OTHER ~./~;t35~,~L
/ ~ 1j1/
/~~Z:>
TOTAL VALUE OF PROJECT
PLAN CHECK FEF ?'<- 3 ;>
RCPTM '< Y7~
DATE ,3--;;--'3 )
BY~-"
~/--
,
1 BUILOING PERMIT I
15% Stale "'S'1
Surcharp.e r~l
ME~~lli.CAlj~~ I
lII"~/.,..
5% Statt! -- - ~
Surcharae ~ I
I PAVING I
~ Sot:>
Y'~:3
'2. "':z.
/41 -~
/~~
- :V}
PLUMBING
I
~~I
I
FT, I
FT. I
~-~
.,. - > <=:>
::? ?,I!>
I DEMOLITION
5% State
SurcharQe
I FENCE
VALliE $
I SIDEWAi.~
I CURBCUT
SUBTOTAL
, ." 'PERMITS
SYSTEMS
DEVELOPMENT
'2/(j. ~~
I Y6"l~SB
. TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
6$t:7. "2 '3
. REQUIRED INSPECTIONS .
It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an inspection, call
726.3769 (reporder), state your City designated job number. job address, type of inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. wIll be made
the following work day,
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
.. ELECTRICAL & .
M'ECHANtCAL: To 'be made
before any work Is covered.
V ROUGH PLUMBING,
ELECTRICAL & ' " ,
MECHANtCAL: No work is to
be covered untll these
inspections have been made
,afld approved.
, '
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
ATTIC DRAFT STOPS &
CURTAIN WALLS . ,
SPECtAL tNSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Owner I Contractor during
constructlon of the following work. A
copy of ,the special testing reports shall
be furnished to the Building Division.
, ";..~
FOoilNGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place; but
prior to placing concrete.
y
FtREPLACE: Prior to placing
facing materials and before
,framing inspectlon. .
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and ~ech~nl_cal are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S,I, (306 a.1)
.. ,
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete is placed.
STRUCTURAL WELDS:
Performed on the job, (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
. Insulatlon and'requHed vapor~"'"
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied.
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a.6)
"
,\, -'. "......
. 'SPRAYED ON
'FIREPROOFING: U,B.c,
Standards 43,8,
. .'
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor Insulatlon, decking or
floor sheathing,
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a.11 &
Chapter 29)
y
LATH AND/OR GYPSUM
BOARD: To be made after all
iathlng and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed, (2501 U.B,C,
STDS. 25.10,11),
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing.
STRUCTURAL MASONRY: (306
a.7)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Instaliation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material in
place,
ROOF SHEATHtNG AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
*In addition to the inspec.
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compilance with the Building,
City or Development Code.
-------------------------------------------------------
.Y
FINAL MECHANICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish Inspection, All project conditions such as
landscaping, parking lot striping, etc, must be completed before
requesting this Inspection.
:V FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
Y FINAL PLUMBING
Y FINAL ELECTRICAL
FINAL FIRE DEPARTMENT
ADDiTIONAL COMMENTS:
PLANS REVIEWED BY ~- ~
, ,
DATE
'?-b'9?
By signature, I state and agree, that I have carefully examined the completed applicatIon and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
whO are in compliance with OAS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction. .
Slgnatura.
/?,vh ......dt
~
Dato
3-2.0-97
VALIDATION:
AMOUNT RECEIVED: ~ Si!, 0 f?- '3
/..4- 5'.;L'/
RECEIPT ':
DATE PAID:
RECEIVED BY'