Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2009-8-24 ~..... ~rtl Geotechnical & Construction Services 1I~'IUlrt;<lI~..'~l.IIII~" Client: Project: Hayden Bridge Water Filtration Plant Expansion Springfield, Oregon 3~51"~'1~ E.>'n~ ~. EWEB 500E, 4th Ave, Eugene, Oregon Inspection of: Reinforced Concrete Contractor: Wildish Building Weather: Clear BPNo:~ .?008-00225 ~ Page 1 of 1 Daily Field Report Date: Project No.: Report No.: Inspector: ID No.: 08-24-09 2087168 E-23719 D. Delatte 1080867-88 Ice Continuous Inspection: 0 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for west half of north and south walls for filter basin (fig. to top of wall) and wall in existing flume and elevated slab section, 80' to 120' from north end. Preliminary reinforcing steel inspection was performed by our office on 08-18-09 (filter walls) and 08-21-09 (flume wall) (ref: FEI report E-23673 and E-23706), Observed the placement of 40.0 yards of Knife River 4000 psi concrete (mix 2440K1 UOKS) into areas noted above, Concrete was placed by pump and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" concrete test cylinders from load 1. Slump - 61/2"; air temperature - 49F; concrete temperature - 70F; air 'content - 3.7%. Jake Stucky (Wildish) was advised of the on-site test results. To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above, Reviewed By: /h.i.~~ Michael L. ~eyr!: Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building CO,- Jake Stucky (email) City of Springfield' MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc,'s written authorization. 7ffJ NN CcmeIIAveoue' Cavalfts, CJregx197330' phone (541) 757-4698, fax (541) 757->2991 29540 BAiI]lOl1Road' Eugere, Oregon 97402 . phone (541) 684-3849 'fax(541)ll8<h3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701. phone (541) 382-4844. fax (541) 382-4846 \&- ~fEI Page 1 of 1 '1~'lrt[I'J;.I~~~~~'II'lil1W!l Geotechnical & Construdi:Jn Servires Daily Field Report Client: EWEB 500E. 4th Ave, Eugene, Oregon Project: Hayden Bridge Water Fillration Plant Expansion Springfield, Oregon (fiSt( BJ3i[0U,bn c~ Date: Project No.: Report No.: eel ,Inspector: . 10 No.: 08-21-09 2087168 E-23706 A. Fenstermacher 5258882-49 Ice Inspection of: Reinforcing Sieel Contractor: Wildish Building Weather: Clear BPNo::'-2008-00225 Continuous Inspection: D Periodic Inspection: 0 Performed preliminary inspection on the reinforcing steel for north flume section: 80' to 120' from north end, wall and elevated slab, Reinforcing steel was checked for grade, size, laps, quantities, locations, ties, clearance and supports. A final inspection will be performed prior to concrete placement. To the best of our knowledge, the work in-progress was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above, Reviewed By: ~~~/~~ Technical Manager c: EWEB- Mike Stickling (em ail) EWEB- Wally McCullough (email) OBEC- Pe1e Slocum (email) Wildish Buildin9 Co.- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (em ail) City of Springfield " MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andfor any part thereof be disclosed without FEI Testing & Inspection, fnc.'s written authorization. 7fIJ twJ CaneII Avenue' CavaJ~ 0'eg:)197330' pha1e(541) 757-4698' fax (541) 757-2991 29540 BAirpatRcad . Eugene, 0et;p197402' pIme(541)684J849' fax (541 )684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701. phone (541) 382-4844. fax (541) 382-484B ~\~",p . ~tt. 11~'llllrt;.I~~'~a'IIIH.I~I. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP , POUR LOCATION TEST DATE 08-20-09 I' 09-10-09 I 09-10-09 I Hold I AGE (DAYS) 7 28 28 ~, (~AJ;t~ 1.1ml & Clll1sfrudon SP.rvicEs Compressive Strength of Concrete (ASTM C 39\ 395'1 BPNO. Hayden Bridge Water DATE Filtration Plant Expansion PROJECT NO. _ Springfield. Oregon , () 'I, .REPORT NO. J..\fu.j Clitl bU-Lcl%t lUll 2008-00225 EWEB 500E. 4th Ave. Eugene, Oregon 97440 PROJECT 08-13-09 CAST BY D, Delatte 4000 psi 4000 psi SACKS 2440KIVOKS CEMENT Super: Eciipse; Air 1 TICKET NO, 3442258 760 F YARDAGE 10.0 OF 640 F WEATHER Overcast Slab on grade for FTW pump base, DATE RECEIVED SPECIMEN SIZE SUPPLIER MAX SIZE AGG, AIR CONTENT SLUMP TIME SPECIMEN STORAGE mo AREA (IN.') 12,56 WEIGHT (LBS) 8.52 COMPRESSIVE STRENGTH (PSI) 4970 AVERAGE STRENGTH (PSI) TIME OF TEST 12:05 PM TOTAL LOAD (LBS) 62405 REMARKS: Jake Stucky (Wildish) was advised of on-site test results. .. , _ End Cones 2 _ Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top or bottom) 6 - Side (pointed lop or bottom) Reviewed By: A . 'Z- /L..-,___ Michael L. ~eyel' Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) vVildishBuilding Co.- Jake Stucky (email) City of Springfield Knife River . , MLM:sc 08-20-09 2087168 6590 08-14-09 4" x 8" Knife River 3/4" 4.2% 61/4" 8:40 AM ASTM C 31 TYPE OF FRACTURE"" 2 This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. . 750 r-ffl Cornell Avenue . Corvallis, Oregon 97330' phone (541) 757-4698 'fax(541) 757-2991 29540 B Airport Road . Eugene, Oregon 97402, phone (541) 684-3849 'fax(541)684-3851 62979 NE Piateau Drive. Surte 3 . Bend, Oregon 97701 ' phone (541) 3824844 . fax (541) 382-4846 EWEB 500E. 4th Ave. Eugene, Oregon 97440 A~""~ ~yrt. .1~'fIIHCI;.I~~'l:'Ulllh'.liI. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 1 SAMPLED TEST DATE 08-19-09 Og-Og-Og Og-09-09 Hold AGE (DAYS) 7 28 28 ~~ Geoterl'1nirnl f/, C'.onstn dion ~ Compressive Strength of Concrete (ASTM C 39\ PfI'5 '1 BPNO. Hayden Bridge Water DATE Filtration Plant Expansion PROJECT NO. Springfield,_Og'gon ' _. REPORT NO, ~C\cn-~Ql~_ Qcl, ' . '200~,00225 1 08-19-09 2087168 6587 PROJECT 08-12-09 CAST BY A, Fenstermacher DATE RECEIVED 08-13-09 4000 psi SPECIMEN SIZE 4" x 8" 4000 psi SACKS SUPPLIER Knife River 40-SE7 CEMENT MAX SIZE AGG. 3/4" Super; Eclipse; AEA AIR CONTENT 3.3% 1 TICKET NO. 3442226 SLUMP 7" 790 F YARDAGE 10.0 OF 30,0+ TIME 11:00 AM 770 F WEATHER Partly sunny SPECIMEN STORAGE ASTM C 31 Flume: north section 0-40' elevated slab, 40'-80' elevated slab and walls; south section 80'-120' elevated slab and wall: center section of west wall (approximately 22' long) for filter basin (fig. to bottom of roof) 1" iiflin filter wall. AREA (IN.') 12.56 WEIGHT (LBS) 8.53 COMPRESSIVE STRENGTH (PSI) 4460 AVERAGE STRENGTH (PSI) TYPE OF FRACTURE" 5 TIME OF TEST 12:25 PM TOTAL LOAD (LBS) 55985 REMARKS: Jake Stucky (Wildish) was advised of on-site test results. .. 1- End Cones 2 - Cone/Splil 3 - Columnar 4 - Diagonal 5 - Side (lap or bottom) 6 - Side (pointed top or bottom) Reviewed By: A.~~~ - Michael L. ~ey/ - Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield Knife River MLM:sc RECEIVED AUG 2 4 2009 This report and/or enclosed test data is the confidential property of the client 10 whom it is addressed and pertains to the specific process and/or malerial evaluated. As such, infonnation contained herein shall nol be reproduced in part or full and/or any part thereof be disclosed without FEl Testing & Inspection, Inc.'s written authorization. 750 r-.NV Cornell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 2954O BAirport Road' Eugene. Oregon 97402. phone (541) 684-3849 'fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~fEI 11:r.'llllrt:"II~':f~.IIIH.m. CLIENT DATE CAST STRENGTH REQUIRED STRENGTH PLACED PRODUCT CODE ADDITIVES LOAD NO, CONCRETE TEMP AIR TEMP POUR LOCATION LOAD 3 SAMPLED ,\ " , ,~ -. ~~ ~ c~;~~ IIl:rn1 & CnlStnJdion SenAcEs Compressive Strength of Concrete lASTM C 39\ DATE RECEIVED 07-22-09 SPECIMEN SIZE 4" x 8" SUPPLIER Knife River MAX SIZE AGG. 3/4" AIR CONTENT 3,5% SLUMP 7" TIME 9:00 AM SPECIMEN STORAGE ASTM C 31 North and south entry slabs at coa9ulant PROJECT Hayden Bridge Water DATE Filtration Plant Expansion PROJECT NO. Sprin9field, Oregon ,REPORT NO, 2:A5'l f\~dtr$~c~ ga: ' 2008-00225 EWEB 500E. 4th Ave. Eugene, Oregon 97440 TEST AGE AREA WEIGHT TOTAl COMPRESSIVE ,DATE IDAYS) (IN') (LBS) LOAD ILBS) STRENGTHIPSIl 07-28-09 7 12.56 8,59 55375 4410 08-18-09 28 12.56 8,61 70095 5580 08-18-09 28 12,56 8.64 70770 5630 Hold BPNO, CAST BY A. Fenstermacher 07-21-09 4000 psi, 4000 psi SACKS 40-SE7 CEMENT Super, Eclipse, AEA 3 TICKET NO. 3444739 79" F YARDAGE 10 OF 74 67" F WEATHER Clear Remaining slabs-an-grade sections for filter building. building. Filter building southwest slab, northeast comer. AVERAGE STRENGTH (PSI) , TIME OF . TEST 8:25 AM .1 .' 9:30 AM I 9:35 AM I 5605 REMARKS: Jake Stucky (Wildish Building Co.) was advised of on-site iest results. .. 1- End Cones 2 - Cone/Split 3 - Columnar 4 - Diagonal 5 - Side (top or bottom) 6 - Side (pointed top or bottom) Reviewed By: fJJ .'-/,~ Michael L. Mey( Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) Wildish Building Co.- Kevin Fiizjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield Knife River MLM:ld 08-18-09 2087168 6541 TYPE OF FRACTURE" , 5 3 5 This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertaif!s to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc:'s written authorization. 750 mv Cornell Avenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991 2954O B Airport Road, Eugene, Oregon 97402 . phone (541) 684-384g . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 . phone (541) 382-4844 . fax (541) 382-4846 ~ftl Geotechnical & Construction Servires 11~'lmrt;.t~~'~;'llll~"-"!I Client: Project: Hayden Bridge Water Filtralion Planl Expansion Springfield, Oreggn ~f'l5l . t1o.>j c:ie.n f; r\.d..g~ Qa\- EWEB 500E. 41h Ave. Eugene, Oregon Inspection of: Reinforcing Steel Contractor: Wildish Building Weather: I:;lear BP"No-:O 2008"00225 --...-- ',."." .:. '~-'" ". . KR ~ Page 1 of 1 Daily Field Report Date: Project No.: Report No.: Inspector: ID No.: 08-18-09 2087168 E-23673 0, Delatte 1080867-88 ICC Continuous Inspection: 0 Periodic Inspection: 0' Performed preliminary reinforcing steel inspection on the west half of south and north walls (approximately 23' long) for filter basin (ltg. to top of wall). Reinforcing steel was checked for grade, size, lap, placement, quantities and clearance. Contractor has one , (1) side of form in-place at this time. Final inspection will be performed prior to concrete placement To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above, Reviewed By: Ih:;t;.~ Michael L. Me'" Technical Manager c: EWEB- Mike Stickling (email) EWEB- Wally McCullough (em ail) OBEC- Pete Slocum (em ail) Wildish Building Co,- Kevin Fitzjarrell (email) Wildish Building Co.- Jake Stucky (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of. the client to whom it is addressed and pertains to the specific process and/or malerial evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, Inc.'s written authorization. 7'3J WI CaneIIA"""ue' CavalfIS, Oregoo 97330, phone (541 ) 757-4698. fax (541) 757-2991 29540 BAirport Road . Eugene, 0reg0097402' phone(541)684-3849' fax(541)684J851 62979 NE Plaleau Drive, Suile3' Bend, Oregon 97701. phone (541) 382-4844 . fax (541) 382-4846 / ~ ~....... ~rt. Page 1 of 1 11l.'lIlltl;.II~'~a'lllJt.ltllll Geotechnical & Construction SeNices Daily Field Report Client: EWEB Project: Hayden Bridge Water Filtration Date: 08-13-09 500E. 41h Ave. Plant Expansion Project No.: 2087168 Eugene, Oregon Springfield, Oregon Report No.: E-23642 ~F\51 ttf>-.'-lckn e:,n~ Qtl. Inspector: D. Delatte 10 No.: 1080867-88 Ice Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: 0 Contractor: Wildish Building BP No.: . -2008-00225 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for slab on grade for FTW pump base. Preliminary reinforcing steel inspection was performed by our office on 08-12-09 (ref: FEI report E-23633). Observed the piacement of 10.0 yards of Knife River 4000 psi concrete (mix 2440KIUOKS) into slab, Concrete was placed directly from truck and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" concrete test cylinders. ,Slump - 61/4"; air temperature - 64F; concrete temperature - 76F; air content- 4.2%. To the best of our knowledge, the work inspected was in accordance with plans dated 02/2008 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: jJ1.<-t:.~ Michael L. Meyer Technicai Manager c: EWEB- Mike Stickling (em ail) EWEB- Wally McCullough (email) OBEC- Pete Slocum (email) WildishBuilding Co,- Kevin Fitzjarrell (email) Wildish Building Co,- Jake Stucky (email) City of Springfield rr t:'C E. AII/'O . "IU(] " '. ~O '- luug MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full andlor any part thereof be disclosed without FEI Testing & Inspection, Inc,'s written authorization. 700 NVI/ Cornell Avenue' CorvaIis, Qegon 97330 . phme (541) 757-4698 . fax (541) 757-2991 29540 B Airpcxt Rood ' Eugene, Qegon 97402 'phme (541) 684-J849 . fax (541) 684-3851 62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541) 382-4844 . fax (541)382-4846