Loading...
HomeMy WebLinkAboutPermit Building 1996-10-28 SPRINGFIELD Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 960919 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 3650 MAIN ST Assessors Map #: 17023142 Tax Lot #: 02501 * owner: JIM GREAR Address: 1612 COLUMBIA ST Phone #: 360-695-7332 City/State/Zip: VANCOUVER, WA 98660 Description Of Work: OCCY INSP/REMODEL ADDITION Value: 0.00 Contractor Canst. Contractor # Expires Phone General: OWNER Electrical: BUILDERS ELEC 0004296 PO Box 10021 Eugene OR 974010000 12/10/96 485-0922 --- PLUMBING --- No. 6 Fee Charge 60.00 10.00 Single Fixture BACKFLOW DEVICE TOTAL PERMIT 70.00 - -- MECHANICAL --- No. 2 Fee Charge 6.00 10.00 Vent Fan/Single Duct Permit Issuance TOTAL PERMIT 25.00 QUAD AREA: 3CNC -- OFFICE USE -- LAND USE: 5300 Item REMODEL Square Feet 702 x $/Square Feet Value 3,000.00 TOTAL VALUE OF PROJECT 3,000.00 Plan Check Fee: 25.03 Rec #: 23450 Date: 10/11/96 Rec By: LORNE PLEGER BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PLUMBING Surcharge/Admin '38.50 3.09 25.00 1. 20 70.00 5.60 SPRINOFIELD Job Number: 960919 Page 2 SIDEWALK CURBCUT 16.30 16.30 SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 175.99 140.96 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 316.95 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following "*" work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete, FINAL ELECTRICAL - When all electrical work is complete. FINAL FIRE - When all Fire Department requirements have been met, been met, FINAL SITE PLAN - After all requirements have been met for Minimum Development Standards or from the Development Agreement. FINAL BUILDING - When all required inspections have been approved and the building is complete. - - - ADDITIONAL COMMENTS - - - APPLICANT WORKING WITH JULIA POWELL MINIMUM DEVELOPMENT STANDARDS REVIEW, JULIA POWELL-HAJDUK Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 10/28/96 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety, I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project, I further agree to ensure proper time, that project permit card is located at of plans will remain on t that all required inspections are requested at the address is readable from the street. that the the front of the property, and the approved set · -"-_:::}~. "do, .oo~;;o_ ;<'f/1h V" /Date ~a2[ ( SPRINGFIELD Job Number: 960919 Receipt Number: Date Paid: Amount Received: Received By: --- VALIDATION 232(, ~ ItJ-~ro :qh 3<6 to .ci'c;- fb Page 3 SPRINCFIELD Page 1 ENGINEERING DIVISION DEVELOPMENT PLAN REVIEW COMMERCIAL / INDUSTRIAL Developer: JIM GREAR Mail Address: 1612 COLUMBIA Tax Lot #: 1702314202501 Subdivision: ST VANCOUVER, WA 98660 Project Address: 3650 Lot: Blk: Eng. Job No,: 960919 Phone #: 360-695-7332 MAIN ST Rev. No.: Book: Street Gravel Ac Mat 3650 MAIN ST EXISTING IMPROVEMENTS Curb Full Imp SW Width Curbside Setback Y 5 FEET 12:1 FLAIRS 36TH Y 5 FEET 12:1 FLAIRS 37TH Y 5 FEET 12:1 FLAIRS Existing Curbcut: Y Width: Ft Flairs: Ft Comments: SEE 1990 MAPS ENGINEERING REQUIREMENTS Additional Right of Way: N Improvement Agreement: N Easements: N SANITARY SEWER CALL THE UTILITIES NOTIFICATION CENTER BEFORE YOU DIG 1-800-332-2344 Available: Y Location From N, S, E, W Property Line: AS SHOWN ON DRAWING OR AS-BUILT Make Connection: PER PLUMBING CODE Comments: USING EXISTING SANITARY SYSTEM STORM SEWER Available: Y Pipe Downspouts And Drains To: STORM SYSTEM Pipe Parking Lot Drainage To: STORM SEWER Comments: USE EXISTING STORM SYSTEM SIDEWALK AND DRIVEWAY INFORMATION New Curbcut Appr,: Y COMMERCIAL Sidewalk Permit: Y Width: 5 Ft Length: 110 Ft Curb cut Permit: Y Width: 99 Ft Handicap Ramp: Y SEE DRAWINGS Comments: ALL DRIVEWAYS & RAMPS MUST BE REVISED TO APPROVED A.D,A. REQUIREMENTS ENCROACHMENT AND ASSESSMENT Encroachment Permit Required: N Sanitary Sewer In Lieu Of Assessment: N Comments: SEE CITY DRAWINGS FOR A.D.A. DRIVEWAYS & RAMPS SPECIAL NOTES AND REQUIREMENTS All work within the public right of way shall be in conformance with the City of Springfield standard specifications for construction. All existing unused curbcuts or portions thereof shall be restored to full curb height as directed by the City, The owner/developer is responsible to relocate any utilities and establish private or public easements when the utilities conflict with the development, at their expense. Reviewed By: TROY MCALLISTER Date: 10/14/96 SEE DRAWINGS ON SPECIAL REQUIREMENTS FOR FURTHER IMPORTANT INFORMATION SPRINQFIELD , CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: JIM GREAR Location: 3650 MAIN ST Developement Type: C Building Size: Job No.: 960919 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 1.0 X X 0.216 Per Sq Ft 2. SANITARY SEWER Number Of PFUs (see Page 2) - CITY 1.0 X 3 X 44.75 Per PFU = 3. TRANSPORTATION Number Of Units Trip Rate X Cost Per Trip X Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs o X X Per PFU + MWMC Admin Fee 20.690 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 10/14/96 Page 1 Sq Ft $0.00 $134.25 $0.00 $0.00 $0.00 $0.00 $134.25 $6.71 $140.96 SPAINOFIELD Job Number: 960919 Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/water Station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory. Single Water Closet. Public Installation Water Closet, Private Miscellaneous Number of New Fixture Unit Equivalent Fixture Units o o o o o o o o 1 o 2 1 2 3 6 2 6 1 3 2 o o o o o o o o 3 o o o o o o o o .0 o o o o o o 2 2 1 6 4 TOTAL FIXTURE UNITS 3 CREDIT CALCULATION TABLE: Based on assessed value, If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : o x 0.00 0.00 o x 0.00 0.00 CREDIT TOTAL = $0.00 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)