HomeMy WebLinkAboutPermit Building 1988-4-19
. '
I INSPECTION LINE
726-3769
.
CI TY Uf SPRINGFIELD . INfDRllATIDN LINt
COMBINATION APPLICATION/PERMIT 726-3753
EilERGY SOURCES: Sq. Ftq, 1.la i n
Heat ~q. Ftg. Access.
Water Heater Sq, Ftg, Other
New Add Alter Pep,
Range -Fence Demo Change/Use
ValUE of wot t/SU Other--
Buildina Permit Info: Describe Work{i.e" Build Single
Familv Residence With Attached Garaael
~~, d{p/...f
I
I
en
o
I~
v\
Job Address
Legal Description
Owner.
(AiAS
3fl&-
Address
Construction lender
Address
DESIGN lLAr1
Primary
Structura 1
Electrical
Meehan; ca 1
CONTRACTORS
General
Plumbina
Electrical
~lechan;cal
.....tm...1
Each single fixture
-; <i I b 1J1.a.0.J
/7-02- 3/-Lft:). -/))/00
OLl7o h-fa;/v
flIlj.,(.:v.- Phone 7 I{ '7
Lf'l:J./
/.2 JC. (.:2
(name)
Phone
(address I
(ohane no.
(lies. no.l
(exnires)
JIL
J./).,y
....- ~
"""'/1 t'.2,,()
-rv II -"'
~)
LA / V I
(name) )
aU) //fJ.A.-/
(addrec;" 1
(1; r<;.
no.1 (pxnirpc;\
(n~('l,",,,, ","I \
PLUIIBING
ELECTRICAL
MECHANICAL
I FFF 1 rHARGE" rw I I t't't' I rLlARG.[ ....JiO.......1
Residence of furnace/burner to
SQ. FT, BTU's
I r;r;c I r~'1RG.E...
Relocated building
(new fix, additional)
S.F. Residence
(l bathl
Duplex (l bath)
Additional bath
Water service
Sewer
Storm Sewer
New circuits alts.
or extensions
Floor furnace
and vent
each
ISERVICES
I
ITempOrary Construction
IChange in existing
rP5- i rtpnrp
Imultifamily. COlTlTl. or
Tnrll/<:trial
10f amps,l
ICO~1,/IND. FEEDERS
1 Install/alter/relocate
rtidrih fpprlp\,"<:
10f amp~1
Wood stove/heater
Recessed wall
Soarp hp~tp\," ~nrl vpnt
Appliance vent
~poa ra tp
Stationary evap.
cooler
Vent fan with
sinale duct
Vent system apart from
heatino or A.C.
Mechanical exhaust
hood and dud
I
I
I
,I
I
I
I
I
ISSUANcr OF PFR!IIT
TOTAL CHARGES TOTAL CHARGES TOTAL CHARGES
WHERE STATE L,'\~ REQUIRES that tile Electrical work be done by an, Electrical Contractor, the electrical portion of this pernit
shall not be vali~ until the label has been signed by an Electrical Supervisor and returned to the Building Division
1 HAVE CAREFULLY EXMllNED the completed aprlication for rermit, and do hereby certify that all information hereon is true
and correct. and I further certify that any and all work oerformed shall be done in accordance with the Ordinances of the City
of Springfield and the Laws of the State of Oregon pertaining to the work described herein. and that NO OCCUPArlCY will be made
of any structure without the permission of the Building Division. I further certify that my registration with the Builder's
Board is in full force and effect as required by ORS 701.055. that if exempt the basis for exemption is noted hereon, and that
only subcontractors and employees who are in compliance with ORS 7nl.055 will be used on this project.
Tyoe/Const,
Bedrooms
Stories
9A1.
_SIGrlATURE /!ill:;::'~;/"/./---
FO~ OFFICE USEOIIL Y
Sq, Ftg,
Sq, Ftg.
Sq, Ftg.
-Y,S-O. -
NAI,IE(please print)~ke..\- l i'lO-c\.exS
Zone_L/
Fire Zone
Flood Plain
/
I
BUILDING PERMIT
Charges anC:
Surcharges ~
PLU!1BING PERMIT
Charges and
Surcharges
ELECTRICAL PERmT
Cha rges and
Surcha~g~s
MECHANICAL PERMIT
Charges and
Surcharges
r
DATE
L/-..JCI$'
Units
Occy Load
Occy Group~~r
t1ain
Access <.... ~
_.
Other
Value
Value
Value
TOTAL V ALUA Tl ON
x
x
(
x
A(!) P&>
___ __0______
.So
Plan Ck.
65%/Bldo
Plan Ck.
30%lBlda
Fence
\
Conm/Ind
Ppr Fpp
Res
Per Fee
/~.-
tf-s - b' !(
Co.90 1/:153
Systems Development
Charae (L5~ '
~".,D7~,6H ;:;;:c-
'1.P\
D~o
'Sidewalk
-----------~I A/~ Paving
" . I Curb Cut
____________1
.'...
Total Comb. Perrnj t
TOTAL I' ~$6-1
.
.
.7' .
--./0..
COMBINATION APPLICATION/PERMIT (CAP)
PERMIT VALIDATION
I, Applicant to furnish
A. Job Address
B. legal Oescription
1. example- Tax Lot 100, lane County Map Reference
17 03 43
2, example- lot 1, Block 3, 2nd Addition to
~prlngtield Estates
C. Name. etc. of owner and construction lender
0, Energy Sources
1. example- heat/electrical ceiling/or forced air qas
2. examoJe- waterheater/electrlcalJor solar
E. Square footage or valuation, etc. -
1, example- 1250 sq, foot house, 500 sq, foot garage
2. example- if new project, check-new - if addition,
check add, etc.
F. Building pennit information:
1. examele - construct single family house with an
attached garage
2. example - remodel existing garage into family room
3. example - convert single family residence into
restaurant (change of use)
G, Value of work as defined in Section 303 (a) of the
Structural Specialty Code
H. OESIGN TEAM AND CONTRACTORS
To avoid design or construction delays, Building
Division Staff must be able to contact appropriate
persons regarding design information or jab site
corrections, etc.
II, Abbreviated Plumbing, Mechanical, & Electrical Schedules
A. Except where blank spaces occur in the description
portion of the Mechanical and Electrical Schedules,
the applicant need fill-in only the No, Boxes adjacent
to the appropriate item(s) to be installed
B. Full Plumbing, Mechanical, and Electrical Schedules
are available at the Building Division
1. To conserve space on the permit form the schedules
have been abbreviated
2, If the item(s) to be installed are not covered on
the abbreviated schedules you should consult the
full schedules
C, BUILDING DIVISION STAFF WIll FIll OUT All FEES AND
CHARGES ON THE SCHEDULES
D. As noted on the CAP, the label must be delivered to the
electrical contractor for Signature by his electrical
supervisor. The general contractor is .not authorized
to sign the electrical label, ---
III, Applicant to sign and date ,
Whenever possible. the initial application will be used as
a worksheet only. Where possible, Building Division Staff
will prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
Signature.
IV, Fees and Charges
Plan check fees are due and payable at the time of the
application, and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable when the permit is issued.
V. FOR OFFICE USE ONLY
Permit Clerk
'J:2~ PT .rJ-
L.~
IIB3ie;>
.
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPANCY:
Permit applicant exemp~ from registration with the Builder's Board because:
Additional Project Information:
. .
.
PLANS REVIEWED BY:
name / t'!>;'/YE'ft~~s;gnature~~....,." date L/-/~eB
/' /'
,
~
.2:
.. .quir~d
Inspectens ..
~
IT IS THE RESPONSIBILITY OF TilE PER."!IT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT THE PROPER TIllE.
THAT EACII ADDRESS IS READABLE FROII TilE STREET. AND THAT TilE PERlIIT CARD IS LOCATED AT TilE FRONT OF THE
PROPERTY. BUILDING DIVISION APPROVED PLANS MUST BE ON JOB SITE AT ALL TIllES,
PROCEDURE FOR REQUESTING INSPECTIONS: Call 726-3769 (recorder) state you CITY DESIGNATED JOB NUMBER,
job address, type of inspection requested and l-lhen YOll will be ready for the inspection. Contractors
or owners name and phone number. Requests received before 7:00 am,will be made the same day, requests
received after 7:00-am will be made the following work day.
Your City Designated Job Number Is: ~~:?~~
Job Address: -:3&/h MA"'/A7 ~7'7'?€'<E/
Owner:~E75 ~TP )5';??-.)'}.~
Contractor: /?jy;;E~ .
o
o
D
o
D
,
SITE INSPECTION: To be made
after excavation, but prior
to setup of forms.
UNDERSLAB PLUMBING. ELECTRICAL
& MECHANICAL: To be made before
any work is covered.
CONCRETE SLAB INSPECTION: To be
made after all ins lab building
service equipment. conduit, piping,
accessories and other ancillary
equipment items are in place but ~
before any concrete is poured. ~
FOOTINGS 6 FOUNDATIONS: To be made
after trenches are excavated and
forms are erected, all steel in
place. but prior to pouring concrete.
D
o
o
UNDERGROUND: Plumbing, Electrical,
Gas, Sanitary Sewer, Storm Sewer,
Water and Drainage lines. To be
made prior to covering or filling
trenches.
o
D
D
~
lRJ
o
UNDERFLOOR: . Plumbing, Electrical,
Mechanical. To be made'prior to
installation of floor insulation,
decking or floor sheathing.
POST 6 BEAM: To be made prior to
installation of floor insulation,
decking or floor sheating.'.
Fl.OOR INSULATION 6 VAPOR BARRIERS:
To be made prior to installution
of decking or floor sheating.
D
D
D
~~SONRY: Steel location, bond beams
grouting or verticals in accordance
with U.B.C. Section 2415.
o
o
ROOF SlIEATIHNG AND NAILING: Prior
to installing any roofing.
ROUGH PLUMBING. ELECTRICAL 6
MECIIANCIAL: No work is to be covered
until these inspections have been
made and approved.
D
o
o
o
o
FINAL PLU~lBING
o
CITY.S SITE PLAN REVIEW BOARD INSPECTION: Must be requested 2.days in advance of the date YOI
wish inspection. All project conditions such as landscaping, parking lot striping etc. must
be com~leted before requesting this inspection.
FINAL ELECTRICAL
,Ot
~
FINAL BUILDING: Must be requested after the final Plumbing, Electrical, ~fechanical and Fire
Department inspections are made and approved. No Occupancy of the premises can be made until
a Certificate of Occupancy has been issued by the Building Division and posted on the premise)
FINAL MECHANICAL
FINAL FIRE DEPART>reNT
SIGNATURE
Phone: -?V7-vg2?
Phone:
ATTIC DRAFT STOPS 6 CURTAIN WALLS,
FIREPLACE: Prior to placing facing
materials and before framing
inspection.
INSULATION 6 VAPOR BARRIER: To be
made after all insulation and
required vapor barriers are in place
but before any lath or gypsum board
interior wall covering is applied.
FRAMING: To be made after the roof.
all framing, fire blocking and
bracing are in place and all pipes,
chimneys and vents are complete and
the rough electrical, plumbing and
heating wires, pipes and ducts are
approved.
~
LATII AND/OR GYPS~t BOARD INSPECTION: ---,
To be made after all lathing and ---3
g)~sum board, interior and exterior,
is in place but before any plastering --,
is applied or he fore gypsum board ~
joints and fasteners are taped and
finished.
FIRE 6 SEPARATION WALL: Located &
constructed according to plans.
o
WOODSTOVES: After installation is
completed.
SIDEWALK 6 DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURB AND APPROACH APRON: After forms
are erected but prior to pouring
concrete.
SPECIAL INSPECTIONS: In accordance Il'ith
Section 306 of the Building Code a special
inspector shall be employed by the Owner!
Contractor during construction of the
following work. A copy of the special
testing reports shall be furnished to the
Building Division.
~
::J
::J
STRUCTURAL CONCRETE: In excess of 300
P.S,!. (306 s,l)
PARKING LOT: After gravel
place but prior to placing
or concrete.
is in
asphal t
STRUCTUR\L WELDS: Preformed on the
job, (2722 f)
HIGH STRENGTH BOLTING: During all :.
bolt installation and tighting
operations (306 n.S)
SPRAYED ON FIREPROOFING:
Standards 43..,8)
(U. B.C.
SPECIAL 'GRADING,
FILLING: During
& Chapter 29)
EXCAVATION AND
earthwork. {306 0.11
~
GLU-LAM BEABS: Inspection Certificate.
by an approve~. agency, furnished to
the City's Building Division before
beams are placed. (2S0l.U.B.C. STDS.
25-10,11),
*In addition to the inspections
specified hereon, the Building
Official may make or require other
inspections of any construction
work to ascertain compliance with
the Building, City or Zoning Codes.
DATP
*ALL ~~HOLES AND CLEANOUTS ~ruST BE ACCESSIBLE, ADJUST>reNT TO BE ~~DE AT NO COST TO TIlE CITY,