Loading...
HomeMy WebLinkAboutPermit Plumbing 1998-5-8 . COMMERCIAL/INDUSTRIAL PERMIT APPLICATION ~ e JOB NUMBER ~~a::> INSPECTION LINE: 726.3769 OFFICE: 726-3759 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK' 3755 Main Street Springfield, Or . ASSESSORS MAP' I::> ~~- -,/- ""~ ~ Ke>.c::> ;P<.~. . r , Mike Miller /~.N~.I"'H.~~~ A/ 1142 Willaqillespie Rd.#7 Eugene TAX LOT: ~=3~~~~ OWNER: PHONE: 541-741-?~~ ADDRESS: CITY' STATF' Or. ZIP: 97401 DESCRIPTION OF WORK: Drain piping and paving of property NEW REMODEL x ADDITION DEMOLISH OTHER VALUE:$46, 700.00 NAME ADDRESS PLUMBING: ADDRESS Eugene Sand & Gravel Same CONST. CO NT RACTO R . r//~ EXPt'RES :(>,.., :?3-99 PHONE 1t1if?t-~~ be3"5141 P1!JJ9/;U(T . PHONE ~~1,.r"4" ARCHITECT' CONTRACTOR'S NAME GENERA' . "'I./~"I MECHANICAl' ~ )~ ~\r {,,: ELECTRlr' I . ,,) PLUMBING MECHANICAL , NO. FEE CHARGE IIIn eee ("Utl.Ar-c Single Fixture Reloeated Bldg. Inew Ilx. addtl) Water Service Furnace/burner & vent < 100.000 BTUs Furnace/ burner & vent > 100.000 BTUs ft. Storm Sewer ??glt. -5'S- Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or hlg. Mechanical exhaust hood and duct It. Sanitary Sewer Backflow Device Permit Issuance $10.00 TOTAL PERMIT -?~~, TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: QUAD AREA: lAND USF' FLOOD PLAIN' ZONING: LIGHTING POWER BUDGET: WATER HEATER' . OF BLDGS' . OF UNITS' OCCY GROUP' . OF STORIES: CONSTR. TYPF' HEAT SOURCe. SQ. FT. $/SO. FT. VALUE SQ. FTG MAl N SQ. FTG ACCESS SO. FTG OTH ER X X X TOTAL VALUE OF.PROJECT PLAN CHECK FE!:. P", ~ RepT' ""2.97'2'7 DATE t!?-@...4-B BY 4-~- ....Vg - - I BUILDING PERMIT 15% State Surcharae I MECHANICAL 15% State ' Surcharae I PAVING I 7.:G~. s;;::.. I PLUMBING 5% State Surcharae FENCE VAIIIF. $ ----- SIDEWALK ..r-> ~? FT. CURBCUT 5.t?: c.-Z> I DEM~ON~ I i .1':?("'~~~~#:??y 9&7 I I )'E'''''''''-' SUBTOTAL "1, /~ __I J'~~ PERMITS ~.~ ~m~~~MENT 1#7/<:::'.88 FT. TOTAL PERMIT FEES I EXCLUDING ELECTRICA' 6'7"'97. ~3 e REQUIRED INSPECTIONS . It Is the responsibility of the permit holder to see that all Inspections are made aj the proper time, To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. 1/ . SITE INSPECTION: To be ROUGH PLUMBING, A PAVING: After gravel Is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work Is to asphalt or concrete. be .covered until these inspections have been made and approved. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a'special inspector shall be employed by the 6wnerl Contraetor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ATTIC DRAFT STOPS &' CURTAIN WALLS CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are . In place but before any concrete Is placed. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In plaee and all pipes, ehlmneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In exeess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor Insulation, decking or floor sheathing. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) / UNDERGROUND: Plumbing, electrical\ gas, sanitary sewer, <IlaJ:lT1 sewe1;)water and dralnagl: Imes. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B.C. Standards 43.8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor insulation, decking or floor sheathing. LATH ANDtOR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, Is In place but before any plastering is applied or before gypsum board Joints and fasteners are taped and finished. GLU-LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.BG. STDS. 25-10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) v SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In place. *In addition to the Inspec- tions specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. MASONRY: Steel loeatlon, bond beams grouting or verticals In accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. I FINAL PLUMBING .K SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting thj: InSpeCtlon~ / ff~~~If6It'cf(.fcfuested~{?he final plumbing, eleetrieal, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Oeeupancy has been Issued by the Building Division and posted on the premises. FINAL ELECTRICAL FINAL MECHANICAL / FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: PLANS REVIEWED BY /~A>~.iI~ ~--?DAT~ ?~-~ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be use.d on this project. I further agree to ensure that all required Inspections. are requested at the proper time, that project address is readable from the street, that the permit card ~s ocated at the' front of the property, and the approved set of plans will remaIn on the site at all times durln~ conS';; ~j7r-f2 Signature' Oato. U r-; VALIDATION: AMOUNT RECEIVED: -2.. ?'7:::J ~=3 2. 9 7:::;;:;-2 RECEIPT N' DATE PAID' RECEIVED BY: -5~~ ~-9e. ~~~:''''''---'-' /.,P'