RE: Mtn Gate, North Cluster Site work observed today
Sounds good, thanks for staying on top of things.
-----Original Message-----
From:, SINGLETON Todd
Sent: Wednesday, May 86, 2889 4:81 PM
To: LIMBIRD Andrew; ENOS Gene; STOUDER Matt; GIBSON Ben
(c: WRIGHT Denny; DONOVAN James
Subject: RE: Mtn Gate, North (luster Site work observed today Emailing: IMGP182S.JPG,
IMGP1826.JPG, IMGP1827.JPG, IMGP1828.JPG
Andy,
Five trees were specified for removal prior to any site grading. Those, trees were removed
during approved LDAP grading and the remainder of the trees were required to be isolated from
the approved working area with orange construction fence. While Ben and I were on the site
today, we noticed that the orange fence was removed and that the excavator was working within
several feet of trees that were not approved for removal; furthermore, the excavator was also
performing grading activity that is outside of the approved LDAP limits and without PIP
approvals.
Although no additional trees were removed, several were visibly damaged by today's grading
activity and the root zones are likely impacted as' soil was pushed and compacted around the
base of the trees. Granted, the location of the trees is within a future street related to
the PIP, the contractor does not have the necessary approvals or permits to be 'performing
this work yet. I told them that they needed to move the equipment away from the trees
immediately and that any damage or removal of the trees may require a corrective tree felling
permit.
Todd
-----Original Message-----
From: LIMBIRD Andrew
Sent: Wednesday, ,May 86, 2889 3: 43 PM
To: ENOS Gene; STOUDER Matt; SINGLETON Todd; GIBSON Ben
(c: WRIGHT Denny; DONOVAN James
Subject: RE: Mtn ,Gate, North (luster Site work observed today Emailing: IMGP182S.JPG,
IMGP1826.JPG, IMGP1827.JPG, IMGP1828.JPG
Gene: Thanks for the ,heads up.
Planning was not apprised of any required tree cutting to facilitate this work. Based on the
density of trees on the periphery, it' appears that more than S trees greater than 5" diameter
were probably re~oved from the site. ,In addition to an LDAP, this work probably warranted a
separate tree felling permit - although by now we don't have conclusive evidence of how many
qualifying trees:were removed.
Andy
-----Original Message-----
1
Date Fteceived: ~~/..H'O:7
Planner: AL
"
From: ENOS Gene
Sent: Wednesday, May 06, 2009 3:13 PM
To: STOUDER Matt; SINGLETON Todd; GIBSON Ben
Cc: WRIGHT Denny; LIMBIRD Andrew; DONOVAN James
Subject: Mtn Gate, North Cluster Site work observed today Emailing: IMGP182S,JPG,
IMGP1826 , JPG, IMGP1827.JPG, IMGP1828.JPG
The contractor has appeared to have cut and graded an area that was not approved for
construction on the work site today. In a conversation with the contractor this morning, I
discussed with the contractor work to be completed for the installation of SUB's Electric
vault and conduit. In impacting this area, the grading and exposure of the soil to the
current weather was not discussed and has now created an erosion concern that will need to be
addressed.
A perimeter fence was also removed to permit the access of equipment into areas where there
was not to be any surface disturbance to soil or trees.
Please provide comments to Matt and Todd so that the contractor might receive direction to
address erosion issues that have been created, and make clear the City's direction to permit
future site work.
The message is ready to be sent with the following file or link attachments:
IMGP182S.JPG
IMGP1826.JPG
IMGP1827.JPG
IMGP1828.JPG
Note: To protect against computer viruses, e-mail programs may prevent sending or receIvIng
certain types of file attachments. Check your e-mail security settings to determine how
attachments are handled.
. 2
0,,' " ':':0ceived:
Planner: AL
s-!. /)-co'f
I ,
\
.,
L1MBIRD Andrew
From:
Sent:
To:
Cc:
Subject:
Attachments:
ENOS Gene
Wednesday, May 06,20093:13 PM
STOUDER Matt; SINGLETON Todd; GIBSON Ben
WRIGHT Denny; L1MBIRD Andrew; DONOVAN James
Mtn Gate, North Cluster Site work observed today Emailing: IMGP1825.JPG,IMGP1826.JPG,
IMGP1827.JPG, IMGP1828.JPG
IMGP1825.JPG; IMGP1826.JPG; IMGP1827.JPG; IMGP1828.JPG
The contractor has appeared to have cut and graded an area that was not ,approved for
construction on the work site today. In a conversation with the contractor this morning, I
discussed with the contractor work to be completed for the installation' of SUB's Electric
vault and conduit. In impacting this area, the grading and exposure of the soil to the
current weather was not discussed and has now created an erosion concern that will need to be
addressed.
A perimeter fence was also removed to permit the access of equipment into areas where there
was not to be any surface disturbance to soil or trees.
Please provide comments to Matt and Todd so that the contractor might receive direction to
address erosion issues that have been created, and make clear the City's direction to permit
future site work.
The message is ready to be sent with the following file or link attachments:
IMGP182S.JPG
IMGP1826.JPG
IMGP1827.JPG
IMGP1828. JPG
Note: To protect against computer viruses, e-mail programs may prevent sending or rece1v1ng
certain types of file attachments. Check your e-mail security settings to determine how
attachments are handled.
1
Date f<eceived:~/""f
Planner: AL
-
, ,~.-~
,,;ri' ,[;to "- . ~'
." .< ~..~
~"-"'-"-"
51612009
IMGP1825JPG
~~l~.~
-
}>:
--
51612009
IMGP1826JPG
Date Received' ./I.!.
Planner: AL . I I ~f