HomeMy WebLinkAboutPermit Building 1997-1-13
.
COMMERCIAL/INDUSTRIAL
PERMIT APPLICATION
LOCATION OF PROPOSED WORK:
~
3S"'~ IwA I~ ~+:
.
JOB NUMBER 96/5'!Jt:/
INSPECTION LINE: 726.3769 (
OFFICE: 726.3759
225 Fifth Street, Springfield, Oregon 97477
ASSESSORS MAP:
J //1 ?
. - -----
?J ~/
..;,
c~
TAX LOT'
n 7fb7n
OWNER: J~ f3(~ tlsoVl
ADDRESS' ~5d-~ /)I,Ia 1\'\ S,
CITY' SfT~ ~
r~ C<J~v~tl1J~
ADD~TION I~EMOLlSH
PHON~'
STAT~'
fJV
ZIP:3]W
NAME
ADDRESS
^
OTHERc~l~
~r
~
VALUE:t!W
PHONE
DESCRIPTl9)I. OF WORK'
NEW ./ REMODEL
ARCHITECT'
CONST.
::::::~OIJl~EW~-r CVN S1R.ADDRzq}S' W I s:fh dMRA~1
PLUMBING' J
EXPIRES PHONE'
I-qg- '~[1~-o
MECHANICA' .
ELEGrRICAI'
It.
I MECHANICAL I
FEE CHARGE I Nn I .~~ ""AMi
I Furnace/burner & vent
< 100.000 BTUs
I Furnace/burner & vent I
> 100.000 BTUs
I Floor furnace and vent I
I Suspended wall or floor I
mounted unit heater
I Appliance Vent I
separate
I Stationary evap. I
cooler
I Vent Fan/Single I
duct
I Vent System apart I
from AC or htg.
I Mechanical exhaust I
hood and duel
I I
I Permit Issuance $10.00 I
I TOTAL PERMIT I
PLUMS'NG
NO,
Single Fixture
Relocated Bldg.
(new lix. addtll
Water Service
Sanitary Sewer
It.
Storm Sewer
It.
Backflow Device
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS'
FLOOD PLAIN'
ZONINf"
aUAD AREA'
LAND USF'
, OF BLDG'"
, OF UNIT'"
OCCY GROUP:
, OF STORIES:
CONSTR. TYPF'
HEAT SOURCE:
LIGHTING POWER BUDGET:
WATER HEATER:
sa. FT.
$/sa. FT.
VALUE
sa. FTG MAIN
sa. FTG ACCES"
X
X
sa. FTG OTHER
x
TOTAL VALU E OF PROJECT
/9. Arl. co-e
PLAN CHECK FEi:
j9t'B
2~ tF1J
2..37
RCPT' '-;}jf?~?
DATE
1/0 L BY
.4/~
(
I BUILOING PERMIT
15% State / (8-,- Q.~
Surcharge f T,O'(
I MECHANICAL
15% State
Surcharae
I PAVING
I PLUMBING
, DEMOLITION
".'1 ",I. ,
/'fUQ '"" ~- I''''
AJ;I/IAlIJ
~.o-o
5% State
Surcharge
FENCE
VALUE $
I SIOEWALK
I CURBCUT
FT.
I
I SUBTOTAL
PERMITS
I SYSTEMS
OEVELOPMENT
FT.
TOTAL PERMIT FEES I
EXCLUDING ELEGrRII'^'
. -.
. REQUIRED IN~PECTlONS .
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, Job address, type of inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the lollowing work day.
SITE INSPECTION: To be
made after excavation, but
prior to setu p of forms.
UNDERSLAB PLUMBING,
ELECTRICAL. &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
y'
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materIals and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 01 the State Specialty Code
a special Inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building DivisIon.
ATTIC DRAFT STOPS &
CURTAIN WALLS
y
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess 01 2500 P.S.1. (306 a.l)
.
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment Items are
In place but before any
concrete is placed.
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERFLOOR: Piumblng,
electrical, mechanical. To be
made prior to installation of
floor Insulation, decking or
floor sheathing.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and requIred vapor
barrIers are in place but
before any lath or gypsum
board Interior wall covering Is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lInes. To be m<?de
prior to covering or filling
trenches.
SPRAYED ON
FIREPROOFING: U.B.c.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.ll &
Chapter 29)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
LATH AND/OR GYPSUM
BOAI;lD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams groutIng or
verticals in accordance with
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
-In addition to the Inspec.
tlons specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
-------------------------------------------------------
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish inspection. All project conditions SuCh as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
- ><-. FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
FINAL FIRE DEPARTMENT and posted on the premises.
A'JJbf{lwAf.. jJtJ(jJ1l,r WIlL 51! ~iiptllA'4 fFfJ~ ~~ltI.a1z1e
WIfl!'J. J .f~/A~ ry }.IIL}IJHI,/A1l;~<P/Nh.Jf" F:'77bI ~N'~
FINAL ELECTRICAL
FINAL MECHANICAL
)(
ADDITIONAL COMMENTS:
n:LJ~rl.A.M hObf1
'>'f-f
PLANS REVIEWED BY yr~~~
OATE fir'} 7
By slgnature,l state and agree, that I have carefully examined the completed applicatIon and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws 01 the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further.agree to ensure thai all required Inspections are requested at the proper time, that project address Is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Signature
tJ!JQNv(ty1 ^)
u }(20fl/{r-J....
AMOUNT REC~ED: tt::./..l? ')
L. </2 ~S-
Datp
l-\'7-Q1
RECEI PT ':
DATE PAID:
RECEIVED BY:
/-/7 ~'??
~/'...----_.
/~
~
VALIDATION: