HomeMy WebLinkAboutPermit Plumbing 1985-8-23
JOb Address
:Y~7?
Legal Description NO .,-A-x
A4, ,
/'/4'/;' [
r
toT
, ~ Ao-/
~.
CITY UF SPRINGFIELD
COMBINATION APPLICATION/PERMIT
EilERGY SOURCES:
Heat
Hater Heater
Range
ValuE of Hork:
r~.......
ihone~'(-l~.J? ~~~l~~n~e~~~~~eInf~~ A~i~~h~~eG~~~~~l.e., Build Single
- fl., A..Lln1 t'1 /U'Z ~\ (J~(,(tj ~ /,.Ji7!:.
i /)hJ!f'/l) d- 1l.~.hli1J /~ _ 1),0
~ () a.-rL ./2.K. c:at;)., ~ u-.JL-
(lie's. no.) -Pexoire!fl I (,:,hrynp' nr:' \
.
~.
I INSPECTION LINE
726-3769
.
INFDRtlATlDN LINt
726-3753
Sq. Ftg. 1.lain
~q. Ftg. Access.
Sq. Ftg. Other
New Add Alter Rep.
-Fence Demo Change/Use
Dther- -
~
~
~
*
Owner
. fldA U;-",A;~.:>n,
1''1' ~tJ ;?';Iv/J/b.. ,,!'/
"!f.?'I.? j'
a.6
/
\.
Address
~./
Construct1on lender
Address
DES I GN TEAr1
(name)
Phone
(address)
Primary
~~~
~
y ~
Structural
Electrical
Mechanical
CONTRACTORS
(namel
rijddress)
"ice;. no.'
(pxoirpc;) (ohnop nn ,
Genera 1
Plumbina
Ot.0V1.QA )
Electrical
~1echani ca 1
PLU'IBING
ELECTRICAL
I """ I r"A,"J Nn
MECHANICAL
NO.
FFF r.HARGE Nn
I t:"t:"t:" I r~.ll.Qr.t:"
Each single fixture
Residence of
SQ. FT.
furnace/burner to
BTU's
Relocated building
(new fix. additional)
. New circuits alts.
or extensions
Floor furnace
and vent
S.F. Residence
(] bath)
Duplex (1 bath) each
Additional bath
SERVICES
Recessed wall
Sn~~p hp~tpr ~nrl ~pnt
~Iater service
ITemporary Construction
Change in existing
rp~ i qp"n~p
multifamily, comm. or
TnrllJ,tri~l
(rJ 0 '0
tin
/ n . <Ie TOTAL CHARGES
that the Electrical work be done by an.
label has been signed by an Electrical
IOf
!cOMI'1. /I NO. FEEDERS
I Install/alter/relocate
r1i,trih. fpprlpr,
IOf
I
I
I
amps.
Appliance vent
SPI)i\r~tp
Stationary evap.
~onler
I Vent fan wi th
,inole duct
I Vent system apart
heatinq or A.C.
I Mechanical exhaust
hood and dud
I ~.lood stove/heater
I
I
I
from
Sewer
Storm Sewer
iJ (~~(>.. ne ri- (~
. --'
91:::( sic":" sewo.
\- \Alder: i\-
/110 l' "VI r\~
I t./y~ -.J
TOTAL CHARGES
. WHERE STATE L~H REQUIRES
shall not be valid until the
amps.
ISSUANCE OF PFR'1lT
TOTAL CHARGES
Electrical Contractor, the electrical portion .of this permit
Supervisor and returned to the Building Division
I HAVE CAREFULLY EXAMINED the completed application for permit, and do hereby certify that all information hereon is true
and correct, and I further certify that any and all work oerformed shall be done in accordance with the Ordinances of the City
of Springfield and the Laws of the State of Oregon gertaining to the work described herein, and that NO OCCUPAHCY will be made
of any structure without the permission of the Building Division. I further certify that my registration with the Builder's
Board is in full force and effect as required by ORS 701.055, that if exempt the basis for exemption is noted hereon, and that
only subcontractors and employees who are in compliance with ORS 7nl.055 will be used on this project.
IW1E(please print) ;,t:JAP ',;7;;.A;.~b'" SIGIIATURE L~
FOP. OfFICE USE DIllY
Sq. Ftg. t1ain
Sq. FtlJ. Access
Sq. Ftg. Other
~-
DATE 1f-~':>,,!J">
Zone
Tvpe/Const.
Bedrooms
Uni ts
Occy Load
Occy Group
x
Value
Value
Value
Fi re Zone
x
Flood Plain
Stories
x
TOTAL VALUATION
BUILDING PERfllT Plan Ck. COIl1l1/1 nd
Charges and ----------- 65%/Bldn PprFpp
Surcharges Plan Ck. Res
30%161 do Per Fee
PLU11BING PERMIT . (D.oo Fence
Charges and --------:~6-
Surcharges Demo
ELECTRICAL PERIHT 'Sidewalk
Cha rges and ------------
Surcharges A/C Paving
11ECHANICAL PERMIT I Curb Cut
Charges and ------------
Surcharges I
Systems Development
Charqe (1.5~) '.
Total Comb. Permit
..
TOTAL
10:.0/0
.
-
COMBINATION APPLICATION/PERMIT (CAP)
PERMIT VALIDATION
I. Applicant to furnish
A. Job Address
B. Legal Description
1. examRle. Tax Lot 100, Lane County Map Reference
17 03 43
2. example- lot 1. Block 3, 2nd Addition to
sprlngtield Estates
C. Name, etc. of owner and construction lender
D. Energy Sources .
1. example- heat/electrical ceilinq/or forced air Qas
2. examole- waterheater/electr;cal/or solar
E. Square footage or valuation, etc. ------
1. examole- 1250 sq. foot house, 500 sq. foot garage
2. example- if new project. check-new - if addition,
cneck add, etc.
F. Building permit information:
1. example - construct single family house with an
attached garage
2. example - remodel existing garage into family room
3. exam~le - convert single family residence into
restaurant (change of use)
G. Value of work as defined in Section 303 (a) .of the
Structural Specialty Code
H. OESIGN TEAM AND CONTRACTORS
To avoid design or construction delays. Building
Division Staff must be able to contact appropriate
persons regarding design information or jOb site
corrections, etc.
II. Abbreviated Plumbing, Mechanical, & Electrical Schedules
A. Except where blank spaces occur in the description
portion of the Mechanical and Electrical Schedules.
the applicant need fill.in only the NO. Boxes adjacent
to the appropriate item(s) to be installed
B. Full Plumbing. Mechanical, and Electrical Schedules
are available at the Building Division
1. To conserve space on the permit form the schedules
have been abbreviated
2. If the item(s) to be installed are not covered on
the abbreviated schedules you should consult the
full schedules
C. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEDULES
D. As noted on the CAP, the label must be delivered to the
electrical contractor for signature by his electrical
supervisor. The general contractor is.not authorized
to sign the electrical label. ---
III. Applicant to sign and date
Whenever possible. the initial application will be used as
a worksheet only. Where possible. Building Division Staff
will prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
signature.
IV. Fees and Charges
Plan check fees are due and payable at the time of the
application. and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable when the permit is issued.
I ~
~~d
~~
V. FOR OFFICE USE ONLY
Permit Clerk
uV
.
]
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPANCY:
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information:
/
PLANS REVIEWED BY:
name
signature
date
.