Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-1-30 COMMERCIAL/lNDUSTRIAL . PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 ,~ ~B NUMBER <9 0/' /?'?~ INSPECTION LINE: 726,3769 OFFICE: 726,3759 LOCATION OF PROPOSED WORK' "3'"<V'/S ##//V -:17: ASSESSORS MAP' /7......&;;>-..3/-5 /' TAX LOT' ~b /~O ~ ~~hV ~.....~~ ADDRESI" ~?.::::: <<<<> -=J '7"m- .$X. ~7:~ DESCRIPTION OF WORK: ~'1r~~ ~ 'NEW REMODEL ADDITION OWNER' PHON~' ?V)-/tC/zB CITY' STATE:_~ - ZIP: 9?~ NAME 5;'.-r/'2-Z7?:?~~ ~ ~5~/C/~5 ?~~.;':-;r, DEMOLISH OTHER . VALUE: ~. - , ADORESS ~ PHONE CONST, .r~ , """",",,. ""'" PHONE ARCHITECT: CONTRACTOR'S NAME ADDRESS GENERA' ' PLUMBING: MECHA'NICAL:~~ ~a~- .. " ELECTRICAl' <~?.!t>:> <<S>,Y-P'~Ai'Y..;;c,/7-.n ~~~~.-:- -,~2 ~~~.:~ ,"" " ~sr-~~_ #~-S-- ?cv5'-'/ ").77 " NO, FEE CHARGE I MECHANICAL , I "'" ~cc "....tl.Q(.!:t:' I I Furnace/burner & vent j < 100,000 BTUs '3 Furnace/burner & vent 7.5c::: :::?:2 - S'~ > 100000 BTUs Floor furnace and vent ] I Suspended wall or floor J mounted unit healer I ApplIance Vent I separate I Stat lonary evap. I cooler I Vent Fan/Sln9le j duct I Vent System apart J from AC or hlg. I Mechanical exhaust hood and dUCI J I C~ ~,,3?~ :<.-1 I Permit Issuance $10,00 ] I TOTAL PERMIT , ':??(~ P\.VMBING Single Fixture Relocated Bldg, (new fix, eddUl Water Service II. Sanitary Sewer II. II. Storm Sewer -. Backflow Device TOTAL PERMIT aUAD AREA' - OFFICE USE - LAND USF' HANDICAP ACCESS: FLOOD PLAIN' ZONING' LIGHTING POWER BUDGET: ' WATER HEATER: , OF BLDGI" , OF UNITS' OCCY GROUP' . , OF STORIF~' CONSTR. TYpO', HEAT SOURCE: sa, FT, $/sa, FT, VALUE sa, FTG MAIN sa, FTG ACCESS sa, FTG OTHER x x x TOTAL VALUE OFPROJE('T PLAN CHECK FEE RCPT' DATF BY _ I BUILDING PERMIT 15% Slate Surcha!,\"e I MEC~~;,(p 15% Stale 1"~ ' Surcharae r-~ I PAVING I PLUMBING , DEMOLITION CURBCUT FT, FT, . SUBTOTAL ,PERMITS _ \', SYSTEMS DEVELOPMENT I I J I I I I'.&? -~ '2........S~ / .~.:r , ?~ 5% Stale Surcharae FENCE VALUE $ SIDEWALK " TOTAL PERMIT FEES I EXCLUDING ELECTRICA' %<77 . REQUIRED INSPECTIONS .. ~ I ,I Ills the responsibility of the permit holder to see that all Inspections are made at the proper time, To requesl en Inspection, call 726.3769 (recorder), state your Clly designated Job number, Job address, type of Inspection requested and when you will be ready for Inspection, Requests received before 7:00 a,m, will be made the same working day, requests made after 7:00 a,m, will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setu p of forms, UNDERSLAB PLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & ' MECHANICAL: No work Is to be covered until Ihese Inspections have been made and approved. ATTIC DRAFT STOPS & CURTAtN WALLS FOOTINGS & FOI1NDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but- prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection, FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. , CONCRETE SLAB: To be 'made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment lIems are In place but before any concrete Is placed. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before,any lath or gypsum board Interior wall covering Is applied, UNDERGROUND: Plumbing, electrical. gas, sanitary sewer, storm sewer. water and drainage lines, To be made prior to covering or filling trenches, UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing, FIRE & SEPARATION WALL: Located and constructed according to plans, POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing, LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished, FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, SIDEWALK' & DRIVEWAY: Required for all concrete paving wllhln street right of way, to be made atter all excavating complete and form work and sub.base material In place, MASONRY: Steel location, bond beams grouting or vertlcals In accordance with UBC 2415, ROOF SHEATHING AND NAILING: Prior to Installing any roof covering, CURB AND APPROACH APRONS: After forms are erected but prior to placl ng concrete. PAVING: After gravel Is In place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner/ Contractor during construction of the following work, A copy of the special testing raporls shall be furnished to the Building Division, STRUCTURAL CONCRETE: In excess of 2500 P.S.I, (306 a,l) STRUCTURAL WELDS: Performed on the job, (2722 f) HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations, (306 a,6) SPRAYED ON FIREPROOFING: U,B.c. Slandards 43.8, SPECIAL GRADING, " EXCAVATION AND FILLING: ,During earthwork, (306 a,ll & Chapter 29) v GLU.LAM BEAMS: Inspection Certificate by an approved 'agency, furnished to the City's Building Division before beams are placed, (2501 U,B'c, STDS, 25.10,11), STRUCTURAL MASONRY: (306 a,7) ~~&; h/?,^,,~y::, 'In addition to the Inspec. tlons specified, the Building Official may make or require other Inapectlons of any construction work to 'ensure compliance with the Building, City or Developmenl Code, FINAL PLUMBING ------------------------------------------------------- SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project conditions such as landscaping, parking lot striping, etc, must be completed before requesting this Inspection, FINAL BUILDING: Requested acter the final plumbing, electrical, mechanical and Fire Department Inspections are made and. approved, No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises, FINAL ELECTRICAL ,( FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY OAT" By signature, I stale and agree, that I have carefUlly examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the Clly of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division, I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project, I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the streel, thai the permit c~rd Is cated at the fronl of the property, and the approved set of plans will remain on the site at all times during constr.wdfTbn, Slgnatur~~ JZ..-d'/'f.-4. f' Da;e / - 30- 9' $- /' . r /""-- y AMOUNT RECEIVEO: -=$'&, V"') RECEIPT N: /?;.r3 ? VALIDATION: DATE PAID' /- ~5'<>-- RECEIVED BY~~ "f'"": "