HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-4-23
1"., ,,, ;llnFonnation
~. !;It
,'00,'....' TO Build On
Jlng '-, , . I ,I. '; I .. CormIcIIfIns . nr.uns
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
.-5-
--
~~
~
- -,
\
---/
/'
___---or =-- _
-- .-
__"---1-040 -^: Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 rax
CCB #176269
Client: Hayden Homes
Address: 2464 SW Glacier Place
Redmond, OR 97756
Project No.: 722-85031-5
Project: Jas. ('e. LIVI'1i1dows 7th Addition
Project :"'1'1:'Z"IA'II<<oJ )
, Location: Spnngfield;Oregon
-,Equipment: ,Troxler: 3430 SN:. 30203
--..-;:;::~_..
-'
" \ -~-~
Dale7erformed: .
P.O. No.:
B.P.No.:
Technician: '
April 23, 2009
":-:: -~
. ' "C-9-.1I411
\, ' -
"Raymona Aliperti
Laboratory Soil / Aggregate Data:
1) Moisture Density Relationship of 126.8IbsJcu,ft" at 13,7% moisture, was furnished by supplier for Della Sand and Gravel 3/4"-0,
. 2) Moisture Density Relationship of 133.0IbsJcu.ft., at 11.0% moisture, was furnished by supplier for Knife River 3/4"-0.
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 570 DS 2190)
Test No. Approximate Test Location Approximate Test Probe Wet Density Dry Dl?nslty Percent Percent Required Comments
Elnv. Depth LBSJCU,FT. LBSJCU,FT, MoIsture Compaction Compaction
1 Loi269 FRG .6" 134.0 129,3 3.6 97.2 95% Proctor 2
2 Lot 268__ .$7 "l"2.- M.'",<p./"'ll FRG 6" 136.5 131.5 3.8 98,9 95% Proctor 2
3 Lot 267 FRG 6" 136.3 131,3 3.8 96.7 95% Proctor 2
4 Lot 266 FRG 6" 136.5 130.8 4.3 98.3 95% Proctor 2
5 Lot 265 FRG 6" 135,9 131,6 3.3 98,9 95% Proctor 2
6 Lo1264, FRG 6" 145.0 138.1 5.1 103.6 95% Proctor 2
7 ILot270 FRG 6" 138.6 132.6 4.6 99.7 95% Proctor 2
8 I Lot 301 FRG 6" 128.0 123,1 4.0 97.1 95% Proctor 1
\ ILot 302
, 9 FRG 6" 128,6 123.7 3,9 97.6 95% Proctor 1
, ILot 303 ---
10 FRG 6" 135.8 131.1 3,6 98.6 95% Proctor 2
11 I Lot 304 FRG I 6" 130,0 123.6 5.2 97.5 95% Proctor 1
Tests performed at finished grade of base at listed locations above. Respectfully ~tled .
Tests were reported to Contractor 15~ erv/~~t7:-O
Kipco Inc.
cc: Raymond Alipertl
Project Manager
THIS REPORT IS PROVIDED FOR THE INFORJ./A nON OF THE CUENT ONLY. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT fN FULL IS PROHIBITED
WITHOUT THE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.