Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-4-23 1"., ,,, ;llnFonnation ~. !;It ,'00,'....' TO Build On Jlng '-, , . I ,I. '; I .. CormIcIIfIns . nr.uns FIELD DENSITY REPORT SOIL AND SOIL-AGGREGATE .-5- -- ~~ ~ - -, \ ---/ /' ___---or =-- _ -- .- __"---1-040 -^: Shelley Street Springfield, Oregon 97477 (541)746-9649 - (541)746-7163 rax CCB #176269 Client: Hayden Homes Address: 2464 SW Glacier Place Redmond, OR 97756 Project No.: 722-85031-5 Project: Jas. ('e. LIVI'1i1dows 7th Addition Project :"'1'1:'Z"IA'II<<oJ ) , Location: Spnngfield;Oregon -,Equipment: ,Troxler: 3430 SN:. 30203 --..-;:;::~_.. -' " \ -~-~ Dale7erformed: . P.O. No.: B.P.No.: Technician: ' April 23, 2009 ":-:: -~ . ' "C-9-.1I411 \, ' - "Raymona Aliperti Laboratory Soil / Aggregate Data: 1) Moisture Density Relationship of 126.8IbsJcu,ft" at 13,7% moisture, was furnished by supplier for Della Sand and Gravel 3/4"-0, . 2) Moisture Density Relationship of 133.0IbsJcu.ft., at 11.0% moisture, was furnished by supplier for Knife River 3/4"-0. Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 570 DS 2190) Test No. Approximate Test Location Approximate Test Probe Wet Density Dry Dl?nslty Percent Percent Required Comments Elnv. Depth LBSJCU,FT. LBSJCU,FT, MoIsture Compaction Compaction 1 Loi269 FRG .6" 134.0 129,3 3.6 97.2 95% Proctor 2 2 Lot 268__ .$7 "l"2.- M.'",<p./"'ll FRG 6" 136.5 131.5 3.8 98,9 95% Proctor 2 3 Lot 267 FRG 6" 136.3 131,3 3.8 96.7 95% Proctor 2 4 Lot 266 FRG 6" 136.5 130.8 4.3 98.3 95% Proctor 2 5 Lot 265 FRG 6" 135,9 131,6 3.3 98,9 95% Proctor 2 6 Lo1264, FRG 6" 145.0 138.1 5.1 103.6 95% Proctor 2 7 ILot270 FRG 6" 138.6 132.6 4.6 99.7 95% Proctor 2 8 I Lot 301 FRG 6" 128.0 123,1 4.0 97.1 95% Proctor 1 \ ILot 302 , 9 FRG 6" 128,6 123.7 3,9 97.6 95% Proctor 1 , ILot 303 --- 10 FRG 6" 135.8 131.1 3,6 98.6 95% Proctor 2 11 I Lot 304 FRG I 6" 130,0 123.6 5.2 97.5 95% Proctor 1 Tests performed at finished grade of base at listed locations above. Respectfully ~tled . Tests were reported to Contractor 15~ erv/~~t7:-O Kipco Inc. cc: Raymond Alipertl Project Manager THIS REPORT IS PROVIDED FOR THE INFORJ./A nON OF THE CUENT ONLY. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT fN FULL IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES.