Geotechnical & Cons1ruclion Services
Daily Field Report
Client:
EWEB
500E. 41h Ave.
Eugene, Oregon
Project: Hayden Bridge Water Filtration
Plant Expansion
Springfield, Oregon
. iqj1~~~~~den fy\c~ IU)
Date:
Project No.:
Report No.:
Inspector:
ID No.:
08-12-09
2087168
E-23633
A. Fenstermacher
5258882-49
ICC
Inspection of: Reinforced Concrete
Contractor: Wildish Building Co.
Weather: PartIY,,$!Jnny
--BP No.: .-19Jl_B:Q,0225
Continuous Inspection: 0
Periodic Inspection: 0
Performed preliminary inspection on the reinforcing steel for FTW pump base slab on
grade, Reinforcing steei was checked for size, grade, iaps, quantities, locations, ties"
clearance and supports. A final inspection will be performed prior to concrete
placement.
Performed final inspection on the reinforcing steel for flume wall north section, 0-40'
elevated slab, 40'-80' elevated slab and wall; south section 80'-120' elevated slab and
wall; center section of west wall (approximately 22' long) for filter basin (ltg.to bottom
of roof). Preliminary inspections were performed on 08-06 and 08-11-09 (ref: FEI
reports E-23585 and E-23627),
Observed the placement of 30.0+ yards of Knife River 4000 psi concrete (mix 40-SE7)
into areas no'ted above (except FTW base). Concrete was placed by pump and was
mechanicaliy consolidated. Cast one (1) set of four (4) 4" x 8" compressive strength
cylinders, Notified Jake Stucky (Wild ish) of the on-site results. Slump - 7"; concrete
, temperature - 79F; air temperature - 77F; air content - 3.3%.
Mr. Stucky was asked to notify our office when additional services are needed.
To the best of our knowiedge, the work inspected was in accordance with plans dated
02/2008 and appllcabie workmanship provisions of the LB,C" except if noted above.
Reviewed By:
jJ;. -;(.~
Michael L. Mey{ .
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Wally McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wild ish Building Co.- Jake Stucky (email)
City of Springfield
MLM:sc,
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As,such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without.FEI Testing &.Inspection, Inc.'s written authorization.
750 NN Ccxnell Avenue' OJtvaIlis, Oregon 97330' phme(541) 757-4698 'fax(541) 757-2991
29540 BAirportRood' Eugene, Oregon 97402 . phooe (541) 684-3849 'fax(541)684-3851
62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701. phone (541)382-4844' fax (541) 3824846
U(
~....~
.:7tt~
Page 1 of 1
11:"lltlrt;.r~.~~lIl(IN_
~~ "lical & Construc:lion Services
Daily Field Report
Client:
EWEB
500E. 4th Ave,
Eugene, Oregon
Project: Hayden Bridge. Water Filtration
Plant Expansion
Springfield, Oregon _
?f\c3rl=~c.'i~~(\ e,Y\ll~ eX
Date:
Project No,:
Report-No.:
Inspector:
ID No.:
08-11-09
2087168
E-23627
A. Fenstermacher
5258882-49
ICC
Inspection of: Reinforcing Steel
Contractor: Wild ish Building Co.
"'Leather: Clea!
Bf> N().~_2.l20Jl,()0225
Continuous Inspection: D
Periodic Inspection: Ii]
Performed preiiminary inspection on the reinforcing steel for flume wall north section,
0'~40' elevated slab, 40'-80' eievated slab and walls; south section 80'-120' elevated
slab and wail. Reinforcing steel was checked for grade, size, laps, quantities, locations,
ties, clearance and supports. A final inspection wiil be performed prior to concrete
placement.
Jake Stucky (Wildish) was asked to notify our office when additional services are
needed.
To the-best of our knowledge, the work in-progress was in accordance with plans dated
02/2008 and applicable workmanship provisions of the i.B.C., except if noted:above.
Reviewed By:
;h ,--x',~
Michael L. ~~y'
Technical Manager
c:
EWEBc Mike Stickling (emaii)
EWEB- Wally McCuliough (email)
OBEC- Pete Slocum (email)
Wiidish Building Co.- Kevin Fitzjarrell(email)
Wiidish Building Co.- Jake Stucky (email)
City of Springfield
-fl~ .
~
4% 0t-
./' ,>~ . <='.0
.~
MLM:sc
This reporf.and/or-enclosed test data is the,confidentiat property of theclient'to whom it is addressed and pertains to the specific
process land/orm"ateriat evaluated. As such, information contained herein shaU not be reproduced in part or full and/of any part
thereof be disclosed without'FEl Testing & Inspection, Inc.'s written authorization.
750 NoN GamelI Avenue. CotvaI1is, CJregoo 97330, phJne(541) 757-4698, fax (541) 757-2991
29540 B Airport Road . Eugene, CJregoo 97402 ' phone (541) 684-3849 . fax (541) 684-3851
62979 NE Plateau Drive, Suite 3, Bend, Oregon 97701 . phone (541)382-4844' fax (541) 382-4846
~rp.
It..yttl
~
11~,mlnP;.h'Il'~Ulllmlll~L. ~~);t":\~ 1.,ia:J1 & COnstruction Servir.es
Compressive Strength of Concrete.
(ASTM C 39\
CLIENT
PROJECT
DATE
PROJECT NO.
REPORT NO.
08-07-09
2087168
6567
EWEB
500E. 4th Ave.
Eugene, Oregon 97440
Hayden Bridge Water
Filtration Plant Expansion
Springfield, Oregon \
.i\Ck,\de.Y\ e:.~ Qa\
~2Ob8.00225
DATE CAST
STRENGTH REQUIRED
STRENGTH PLACED
PRODUCT CODE
ADDITIVES
LOAD NO.
CONCRETE TEMP
AIR TEMP
POUR LOCATION
LOAD 1 SAMPLED
TEST
DATE
08-07-09
08-28-09
08-28-09
Hold
AGE
(DAYS)
7
28
28
~101
BPNO.
07-31-09 CAST BY A Fenstermacher DATE RECEIVED 08-01-09
4000 psi SPECIMEN SIZE 4" x 8"
4000 psi SACKS SUPPLIER Knife River
40-SE7 CEMENT MAX SIZE AGG. 314"
Super; Eclipse, AEA AIR CONTENT 6.5%
1 TICKET NO. 3444933 SLUMP 7314"
79' F YARDAGE 6.0 OF 18,0 TIME 9:15AM
69" F WEATHER Clear SPECIMEN STORAGE ASTM.C 31
New wall in the flume, the north 40' and the 40' to 80' from south end and slab on grade for alum truck
unloading and fiil station.
From south end of north section of flume wall.
AREA
(IN.')
12,62
TOTAL
LOAD (LBS)
44250
AVERAGE
STRENGTH
(PSIl
TYPE OF
FRACTURE"
3
TIME OF
TEST
7:50 AM
WEIGHT
(LBSI
8.42
COMPRESSIVE
STRENGTH (PSIl
3510
,REMARKS: Mike Stickling (EWEB) and Jake Stucky (Wildish) were advised of on-site test results.
H 1- End Cones 2 _ Cone/Split 3 -Columnar 4- Diagonal 5-Side (lop or bottom) 6- Side (pointed top or bottom)
Reviewed By:
Ih. ';(:~~
Michael L. ~ea;
Technical Manager
c:
EWEB- Mike Stickling (email)
EWEB- Waily McCullough (email)
OBEC- Pete Slocum (email)
Wildish Building Co.- Kevin Fitzjarrell (email)
Wildish Building Co.- Jake Stucky (email)
City of Springfieid
Knife River
MLM:sc
This report and/or enclosed test data _is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained 'herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, Inc.:s written authorizatiqn.
750 NW ComellAvenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 B Airport Road' Eugene, Oregon 97402 ' phone (541) 684-3849 ' fax (541) 684-3851
62979 NE Plateau Drive, Suite 3 . Bend, Oregon 97701 ' phone (541) 382-4844 . fax (541) 382-4846
~pp~
~~rtl
Geotechnical & Construction Servires
1I:lio'IIN~;<!III~lro'~l.liln'~
Client: .
EWEB
500E. 4th Ave,
Eugene, Oregon
Project: Hayden Bridge Water Filtration
Plant Expansion
Springfield, Oregon ___
.?J~~3:-:~_GXI(kh'b~(tw~",
Inspection of: Reinforciog Steel
Contractor: Wildish Building
Weather: Overcast
BPij'o,=-:-_ - 2008,002254'
~Q.
Page 1 of 1
Daily Field Report
Date:
Project No.:
Report No,:
Inspector:
10 No.: .
08-06-09
2087168
E-23585
.D, Delatte
1080867-88
ICC
Continuous Inspection: 0
. Periodic Inspection: 0
Performed preliminary reinforcing steel inspection on the center section of, west wall
(approximately 22' long) for filter basin (ftg, to bottom side of roof slab), Reinforcing
steel was checked for grade, size, lap, placement, quantities and clearance,
Contractor has one (1) side of form in-place at this time, Final inspection will be
performed prior to concrete placement.
To the best of our knowiedge, the work inspected was in accordance with plans dated
02/2008 and applicable workmanship provisions of the LB.C" except if noted above,
Reviewed By:
/h.~~
Michael L. Meyer
Technical Manager
c:
EWEB- Mike Stickiing (email)
EWEB- Wally McCullough (emaii)
OBEC- Pete Slocum (em ail) .
Wildish Building Co,- Kevin Fitzjarrell (email)
Wildish Building Co,- Jake Stucky (email)
City of Springfield
MLM:sc
R~C
4(;; ~/ V~
'CI,? D
lUUg
This reportand/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEr Testing & Inspection, Inc.'s written authorization.
7fIJ rwv ComellAvenue' Corvallis, Oregon 97330, phone (541) 757-4698, fax (541) 757-2991
29540 BAirpcrt Rood 'Eugene, Oregon 97402 'phone(541)684-3849 'fax(541)684-J851
62979 NE Plateau Drive, Suite 3 'Bend, Oregon 97701 'phone(541) 382-4844, fax (541)3824846