Loading...
HomeMy WebLinkAboutPermit Plumbing 1995-7-6 COM M ERCIAL/I N DUSTRIALe PERMIT APPLICATION ~ . ' JOB NUMBER <1?C?02Z 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726.3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORK' ~.;/~ /Y.?;4/A"" .....,;7" ~c=-~.....?' ASSESSORS MAP: / '}.,cJ 2- "3/- "'3 / TAX LOT: "Q:Z 3"~ OWNER:_J~/If'~ .~,,~7'~A<';;r- ADDRESS' --.::?4/&:::5 ~.-&-A?f:? ~ , , / "'-),P~2::> . P' - /' DESCRIPTION OF WORK' ~ V~~~;- ~ NEW REMODEL ADDITION PHON~' 7~h- "7"S--~ ~ CITY' STAT~' ~/..,--- ZIP' '9 ::;> Y;:;>~ NAME /'~ ~/Y<'/Ce=- ..#..6'~/ 7/",,-;--.0:<7. DEMOLl;H . OTHER VALUE: ~ \""~ PHONE .~' ADDRESS ARCHITECT' CONTRACTOR'S NAME ADD RESS CONST, CONTRACTOR # EXPIRES PHONE G~EM" . z;.. '_"Z> ;J~Y8nc-~ai~-..':>~" . PLUMBING...~Z~....w'/'"'.c~. ~L9<'.~?'>h--:.. .R~s.:. :::P~~ ,4"~//7"r.G MECHANICAl' ELECTRICA' ' PLUMBING I MECHANICAL NO, FEE CHARGF I .", ~~~ ("1-I.Q.l::lnl= :f3 Single Fixture .B:? ~ 1 Furnace/burner & vent /L:> <100,000 BTUs Relocated Bldg, 1 furnacefburner & vent IneY/ fix, addtll >100,000 BTUs V Water Service -::?S'.~ I Floor furnace and vent <~o It. Sanitary Sewer 1 Suspended wall or floor It, mounted unit heater ,/ Storm Sewer ;('~""'~ I Appliance Vent < S-o It. separate I Stationary evap. Backflow Device cooler 1 Vent Fan/Single duct 1 Vent System apart from AC or htg. 1 Mechanical exhaust hood and duct I I I Permit Issuance $10,00 TOTAL PERMIT I /~..-. 1 TOTAL PERMIT QUAD AREA' - OFFICE USE - LAND USF' HANDICAP ACCESS: FLOOD PLAIN' ZONING' # OF BLDGS' # OF UNITS' OCCY GROUP' . OF STORIES' CONSTR, TYPF' H EAT SOURCE: LIGHTING POWER BUDGET: WATER HEATER: SQ, FT, $/ SQ, FT. VALUE SQ, FTG MAIN X SQ, FTG ACCESS X , SQ, FTG OTHER P O.fi?~:'- z.;. X .;- ..... '7'" 9' <-.c::::>. ~ TOTAL VALUE OF PROJEr'T PLAN CHECK FEf ! RCPT' DAT~ BY I -' I PLUMBING I~.- DEMOLITION 15% State ". -:''''' SurcharQe 3.90 I FENCE I VALUE $ I SIDEWALK .1 I SUBTOTAL FT, PERM ITS I CURBCUT I I SYSTEMS FT, DEVELOPMENT I BUILDING PERMIT 15% State Surcharge I MECHANICAL 15% State Surcharae I PAVING TOTAL PERMIT FEES I EXCLUDING ELECTRICAl /Y'e:>.70 , It is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, Job addresst type of inspection requested and when you will be ready for inspectlon. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 8.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms. , .' REQUIRED INSPECTIONS Y., ROUGt-fd>'"MBINcL:>,: 'ELECTRICAL & " MECHANICAL: No work Is to _ be covered until these inspections have been made and approved. UNDERSlAB PLUMBING, , ELECTRICAL & MECHANICAL: To be'made before any work is covered. ATTIC DRAFT STOPS & CURTAIN WAllS' FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before fram,lng Insp,ectlon, _ FRAMING: To be made after the roof. all framing, fire blocking and bracing are in place and all pipes. chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. CONCRETE SLAB: To be made after all Inslab building service equipment, conduIt, piping, accessorles and other ancillary equipment Items are In place but before any concrete Is placed. INSULATION & VAPOR BARRIER: To be made aftar all Insulation and required vapor- . barrIers are In place but. .. . before any lath or gypsum board Interlor wall covering Is applied, FIRE & SEPARATION WAll: Located and constructed . according to plans. y UNDERGROUND: Plumhlng electrical, gac::.......~Pi"lta.r\( sew~ storm sewer('WaiA(Jina drainage lines. To be made prior to covering or filling trenches. UNDERFlOOR: Plumbing, electrical, mechanIcal. To be made prior to Installation of floor Insulation, deckIng or floor sheathing. lATH AND/OR GYPSUM. BOARD: To be made after 'all lathing and gypsum board, interior and exterior, is in place but before any. plastering Is applied or:before gypsum board Joints and fasteners are taped and finished, POST & BEAM: To be made prior to Installation of floor Insulation, deckIng or floor sheathing, FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415, ROOF SHEATHING AND NAiliNG: Prior to Installing any roof coverl ng. CURB AND APPROACH APRONS: After forms are erected but prior to placIng. concrete. . ~ PAVING: After gravel Is In place but prior to placing ~+~asp.ha.~t ~r concrete. SPECIAL INSPECTIONS: In accordance Section 306 of 'ttie State Specialty Code a special Inspector 'shall'be amployed by th~ Owner! Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, STRUCTURAL CONCRETE: In excess of 2500 PS,I. (306 a,1) STRUCTURAL WELDS: Parformed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations, (306 a.6) SPRAYED ON ; .: 'FIREPROOFING"U,B,C, \ Standards 43.8. SPECIAL GRADING. EXCAVATION AND FilliNG: During earthwork, (306 a,11 & Chapter 29) GlU.lAM BEAMS: Inspection Certificate by an approved ~_ agancy, furnished to the City's Building Division bafora beams are placed, (2501 UB.G, STD;:;, 2,5..10.11), STRUCTURAL MASONRY: (306 a,7) "In addition to the Inspec. tlons specified, tha Building Official may make or require other Inspections of any construction work to ensure compllanca with tha Building, City or Development Code. y FINAL PLUMBING ------------------------------------------------------- .".... . SITE PLAN REVIEW, BOARD: Must be requested 2 days In advance of the date you wish inspectIon. All project conditIons such as landscaping. parking lot striping, etc, must be com plated before requesting this Inspection. FINAL ELECTRICAL FINAL BUilDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has bean Issued by the Building Division and posted on the premises. FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITiONAL COMMENTf" PL'ANS REVIEWED B / ~ ~- '.-s-i, DAT'" ?--=;!""3S- r /;r (r--=;' By signature. I state and agree, that I have carefully examined the completed application and do hereby certify thi't all Information herein is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the laws of the State of Oregon pertaining to the work describad hareln, and that NO OCCUPANCY will be made of any atructure without permission of the Building Safety Division, I further certify that only contractors and employees who are In compliance with ORS 701,055 wl/lbe u,se9, on, this project. I further agree to ensure that all required inspectlons.are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the frorit -of the pr~pertYt and the approved set of plans will remaIn on the site at all times during construction. ~/('" Signaturp /' ~ -----P VALIDATION: AMOUNT RECEIVED: /f/7, -1'0 /~.2/J\- RECEIPT .' DatE'" /jgfi;~ " DATE PAID' RECEIVED BY: ~ "