Loading...
HomeMy WebLinkAboutSpecial Inspection Miscellaneous 1981-3-12 INSPECTION LINE ~ECTION PROCErulRE FOp'.THE CITY OF SPRIJ"I '0 INFORMATION LINE 726-3769 ..,DING DIVISION ", , . 346 ~AI 726-3753 YOUR CITY DESIGNATED JOB NUflBER IS:8'a-~ The following,' indicated inspections are required for your construction at 3.3:::'.r) M4-w fiT. / :;c.,1'7€ <.' It is the responsibility of the permit holder to see that all inspections are made at. the proper time,-that each address 15 readable from the street, and that th~ permit.card is located at the front of the property. .L 1. SITE INSPECTION: To be made after excavation. but prion to set- up of forms 2. UNDERSLAB PLUMBING. ELECTRICAL & )( MECHA~icAL: To be made before any' work is covered 8. FIREPLACE: Prior to placing fac- ing materialS 3. FOOTINGS & FOUNOATIDN: To be made after trenches are excavated and forms are erected, but prior to pouring concrete 9. FRAMING INSPECTION: Must be re- quested after approval of rough plumbing, electrical & mechanical. All roofing, bracing & chimneys,etc. must be completed. No work is to be concealed until this inspection has been made and approved ;( ,10. DRYWALL INSPECTION: To be made after all drywall is in place. but prior to any taping 4. UNOERFLOOR PLUMBING & MECHANICAL: To be made prior to installation ot floor insulation or decking 11. MASONRY: Steel location, bond ---- beams, grouting or verticals in ac- cordance with U.8.C. Section 2415 5. .POST & 8EAM:' To be made prior to 12. FIRE & SEPARATION WALL: Located installation of .floor insulation or ---- & constructed according to plans decking x 6. ROUGH PLUM8ING. ELECTRICAL & MECH- ANICAL: No work is to be covered until these inspections have been made and approved 13. ATTIC ORAFT STOPS: x 7. INSULATION/VAPOR BARRIER INSPEC- 1l0N: 10 be made after all lnsula- tion and required vapor barriers are in place but before any lath, gypsum board or wall covering is applied, and before any insulation is con- cealed SPECIAL INSPECTIONS: Wh., re- quired by Building Code. special . inspector to be present when work is in progress. A copy of the special testing report to be . furnished to the Building Division Zl.Structural Concrete: In excess of 3000 P.S.J. OTHEn INSPECTImIS: May be re- quired in accordance with Build- ing Code, to be indicated in plans or by notice from Building --- Inspector 22.Structural Welds: Performed on the job 23.Glu-Lam Beams: Inspection certifi- cate (by approved agency) supplied ____ to Building Division before beams are placed 24.Fire retardant Roofing: Before installation ~ FINAL PLUMBING L FINAL ELECTRICAL )(FINAL MECHANICAL 14. ,ROOF SHEATHING ANO NAILING: Prior to installlng any rooting 15. SIDEWALK & DRIVEWAY: Required for all concrete pavlng wlthin street right-of-way; to be made after all' excavating complete & form work & sub-base material in place 16. CUR8 AND APPROACH APRON: After forms are erected but prior to pour- ing concrete 17. SEWER, WATER & DRAINAGE LINES: ' Prior to tl111ng in trenches 18. Ig. * 20. WOOOSTOVES: .- completed After installation: is / *SPECIAL REOUIREMENTS: 30. Contiguous units with an interior property line between units. (com- mon wall structures) an engineers survey Showing the location of the foundation on the property shall be submitted and approved by the City Engineering Division before request- ing a post & beam inspection ~FINAL FIRE DEPARTMENT . All project conditions, such as the installation of street trees, completion of the required landscaping, etc., , must be satisfied before the BULLDING FINAL can be requested._ ~INAL BUILDING: The Final Building Inspection must be requested after'the Final Plumbing; Electrical.' and Mechanical Inspection have been made and approved. No occupancy'of the premises can be made until the Final Building Inspection has been made and approved. and a' : CERTIFICATE OF OCCUPANCY HAj JEEN}SSUED BY THE BUILIONG DIVISION AND POSTED ON THE PREMISES., _ Name of permit holder: /1/1. (7, EOt-l5s BI/,&offR Phone: "7//,b-c),o~;;:? ,;,.,""~.4/~ ..., ~;';y'.cl BUILDING DIVISION APPROVED PLANS SHALL REMAIN ON THE BUILDING SITE AT ALL TIMES" AND ALL WORK MUST BE COMPLETED IN ACCORDANCE WITH THOSE APPROVED PLANS. NOTE: All manholes and cleanouts are to be adjusted at no cost to the City. '* Prnr'edure for insoection re.ouest - Call 726-3769(recorder) state your City designated job number, job address, type-' of inspection requested and when you will be ready for inspection, Contractors or Owners name and phone numbers. Requests received before 7:00 a.m. will be made the same day, requests made after 7:00 a.m. will be made the ,next working day. , . ' .__ _~:'-':~:".'~(L:.::.\..-t.":rU':". ~.::"..-. -"