Loading...
HomeMy WebLinkAboutPermit Building 1997-10-15 . COMMERCIALIINDUSTRIAL PERMIT APPLICATION . 225 Fifth Street, Springfield, Oregon 97477 ~ JOB NUMBER 9'//.9d'~ INSPECTION LINE: 726.3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORK: -::;'/ Sn, HillA) 4r. ASSESSORS MAP' /-, ~ '2 -3/ -.::;:. C> ~FLLJ (A;t:-.I1/1I/t/T &a) TAX LOT: .::7~ V~ /')fF ADDRE'"'' ::=3/e;o I1I1/AI <<C t7P?Z.fl . /Jifl OF ~-rf<.Y' PHON~' 7Zc,. ~,C;8 'cr, OWNER- CITY' STATF' oK ZIP: 9?~?~ DESCRIPTION OF WORK: NEW REMODEL e <t REiJ}( ,H',c::::.. ,c;,('/<;;7/A-IC; <::/1//1'603;; t1V/ '2b ~A-2E <;;f~r I ~~'Y&~ ADDITION DEMOLISH OTHER ~Al19 VALUE: ...sc:!!::-,:, ARCHITECT- NAME .AJI)~ ADDRESS PHONE PLUMBING: MECHANICAl' I CONST, /ltJ/3/ IO/'Jf{/o71 CONTRACTOR' Expmts f {V PHONE , 10. W. 9rJ3 h;-~ /r/t::L . 72h (;,Z'1Cf -~ '~ CONTRACTO~'~ NAME ADDRESS GENERAl' fitt5 (6~'T/rJ)1.J ::HIe ELECTRICA' ' I PLUMBING J MEr.HANIr.AL I NO FEE CHARGE J Nn I ~~~ r:U.o.Dr-c I Single Fixture I Furnace/burner & vent < 100,000 BTUs I Relocated Bldg. I Furnace/burner & vent I (new fix. addtll > 100,000 BTUs I Water Service I Floor furnace and vent I ft. I I Sanitary Sewer I Suspended wall or floor I It, mounted unit heater I I Storm Sewer I Appliance Vent I It. separate I I Stationary evap. I Backtlow Device cooler I 1 Vent Fan/Single I duct '1 - I Vent System apart I . from AC or htg, I Mechanical exhaust I hood and duct I I I Permit Issuance $10,00 I TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS' OUAD AREA' LAND US~' FLOOD PLAIN: . OF BLDGS' . OF UNIT~' ZONING' ' OCCY GROUP' CONSTR. TYPF' LIGHTING POWER BUDGET: . OF STORIE~' HEAT SOURCE: WATER HEATER- sa, FT, $/SO, FT. VALUE sa, FTG MAIN X sa, FTG ACCESS X SO, FTG OTHER X TOTAL VALUE OF ,PROJECT PLAN CHECK FEF RCPTN DATF BY I BUILDING PERMIT 15% Slate 't.:"~ SurcharQe ;t~ I MECHANICAL 15% State Surcharoe I PAVING ?r5e> . -73. . ~ I,;' PLUMBING 1 I I FT. I n: -1-----. DEMOLITION 5% State SurcharQe I FENCE VAIIJF. ~ I slb-eWALK- I CURBCUT SUBTOTAL. PERMITS SYSTEMS DEVELOPMENT - - I TOTAL PERMIT FEES EXCLUDING ELECTRICA' Zh.~? It Is the responsibility of the permit holder to see that all Inspections are made at the proper time, To request an Inspection, call 726.3769 (recorder). state yo~r City designated Job number, Job address, type of Inspection requested and when you will be ready for Inspection, Requests received before 7:00 a,m. will be made the same working day, requests made after 7:00 a,m. will be made the fOllowing work day, '\ ' SITE INSPECTION: To be, ROUGH PLUMBING, made after excavation. but ELECTRICAL & prior to setup of forms, MECHANICAL: No work Is to be covered until these Inspections have been made and approved. "In addition to the Inspec. tlons epeclfled, the Building Oftlclal may make or require CURB AND APPROACH other Inepectlone of eny ROOF SHEATHING AND APRONS: After forme are conetructlon work to eneure NAILING: Prior to Installing erected but prior to piecing compliance with the Building, f In concrete City or Development Code. any roo cover g, _____________..:.____________________________ ------------- SITE PLAN REVtEW BOARD: Must be requested 2 days In advence of the date you wish Inspection, All project' conditions such as landscaping, parking lot strIping, etc. must ~e completed before requesting this Inspection, FINAL BUILDtNG: Requeeted after the final plumbing, electrlcel, mechanical and Fire Department Inspections are made and approved, No occupancy of the premleee cen be mOde until a Certlflcata of Occupancy has been Issued by the Building Division and posted on the premises. . REQUIRED INSPECTIONS , UNDERSLAB PLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered, ATTIC DRAFT STOPS & CURTAIN WAllS ,~ FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel IfI p'lace, but ~',.. p.rlor to placing -concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, Chimneys and vents are complete and the rough electrical. plumbing and mechanIcal are approved. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, . piping, accessories and 'other ancillary equipment Items are In place but before any f:on'crete Is pla'ced. UNDERGROUND: Plumbing, electrical. gas, sanitary sewer, storm sewer, water and drainage lines, To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied, UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation. decking or floor sheathing. FIRE & SEPARATION WALL: located and constructed according to plans. POST & BEAM: To be made prior to Installation of floor InSUlation. decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and e)(terlor, Is In place but before any plastering Ie applied or befora gypsum board Joints and fasteners are taped and finished, FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, SIDEWALK & DRIVEWAY: Required for all concrete paving within atreet right of way, to be mada after all e)(cavatlng complete and form work and eub-base material In place. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANtCAL y FINAL FtRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY . PAVtNG: After gravel Is In place but prior to placing asphalt or concrete. SPECtAL INSPECTIONS: In accordance Section 306 of the State SpeCialty COde a special Inspector shall be employed by the Ownerl Contractor during construction of the fOllOWing work, A copy of the special testing reports shall be furnished to the Building Division, STRUCTURAL CONCRETE: In excess of 2500 P.S,1. (306 a,l) STRUCTURAL WELDS: Performed on the job, (2722 f) HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations, (306 a,6) SPRAYED ON FIREPROOFING: U.B,C, Standards 43.8, SPECIAL GRADING, EXCAVATION AND FilliNG: During earthwork, (306 a,11 & Chapter 29) GLU.LAM BEAMS: Inspection Certificate by an approved agency. furnlehed to the City's BUilding Division before beams are placed. (2501 U,B.c, STDS, 25'10.11). STRUCTURAL MASONRY: (306 a.7) , J A/~~~ ~>~./~. DATe h com letad application and do hereby certify th/lt ell Information By signature, I state and agree, that I have carefully examln;d I~ e rk p~r'ormed shall be done In aocordance with the OrdlnancGs herein Is true and correct, and I further certify that any an a W~alnln to the work described herein. and that NO OCCUPANCY of the City of Springfield. and the Laws of the Stale ~f ~~~I~f;gP;afety D'~'s'on, I further certify that only contractors and employees will be made of any structure without permlssl~n ~ ~S~d on thla project. who are In compliance with ORS 701.055 wll b tl e that project addreas la readable from the t ure that all required Inspections are requested at the proper md 'set of plans will remain on the site at all I further agree 0 ens I t d at the front of the property, and the approve street, that the per t card Is oca e ~ ' /. times during con ICW'\ 'II , /o/fs-/"'f 7 ~/ 'A/VW Date f f 51 gnaturp VALIDATION: AMOUNT RECEIVED: g.?'. '7/"':> RECEIPT #: ?::>-::>/..:;;- DATE PAID. /I?V~~ .? RECEIVED BY~ ~/----';---