Loading...
HomeMy WebLinkAboutComments APPLICANT 6/24/2009 L1MBIRD Andrew From: Sent: To: Cc: Mark Young [mark@rowellbrokaw.com] Wednesday, June 24, 20094:32 PM L1MBIRD Andrew adam@browncontracting.net; MCCORMACK Joe; CASTILE Robert; Jeff Bond; Marina Wrensch; Lindsay Smith-Ramsey Re: Gateway EmX Platform - Final Site Inspection L2.2-PlantingPlan (5.29.09).pdf Subject; Attachments: Andy, Attached is a revised sheet L2,2 showing the as-built planting noted in Item #2, I will send you a hard copy tomorrow. Note that we've added more plants at the south.end of Platform, probably after your visit. This was a late change made to improve the existing condition in that area, For Item #3, as we discussed on the phone, this particular species was not available in the 5 gallon size, but 2-3 gallon size plants were transplanted to 5 gallon containers in the winter to allow their root balls to expand, These will eventually fill out the beds, but we've identified 5 plants that were very sparse and located in prominent locations, and are having these replaced with more robust specimens, For Item #4, we're not sure what happened here, but the missing plant is being replaced, Let me know if you have any questions or comments, Thanks, Mark Young Rowell Brokaw Architects 1 East Broadway, Suite 300 Eugene, OR 97401 (541)485-1003 mvoun!!(a)rowellbrokaw.com On Tue, Jun 16,2009 at 1 :28 PM, LIMBIRD Andrew <alimbird(a)ci,sorin!!field.oLuS> wrote: Adam: Further to our site visit yesterday, this is a summary of the Final Site Inspection conducted for the Gateway ErnX Transit Platform located at Gateway Mall. The site visit was mostly satisfactory, and Planning does not object to L TD obtaining necessary authorization for commencing operations at the new transit platform, The following items require follow-up and, as noted in #1 below, further inspections to verify completeness: 1, At the time of the inspection, the existing Gateway Mall transit platform has not been removed and replaced with parking spaces and landscaping island as depicted on the approved Final Site Plan, A follow-up inspection 1 Date neceived: 6/2'1/ ~tJf /", Planner: AL will be required when the platform demolition and parking lot re-construction has been completed (possibly in early July), Please contact me at 726-3784 (direct) to schedule the follow-up inspection, 2. During the Final Site Inspection, staff observed that the contractor's site plans contain a landscaping addendum for the transit platform that differs from the approved Final Site Plan on file with the City, At least two of the areas depicted as landscaping on the approved Final Site Plan have been removed and replaced with concrete walking surfaces (see example in attached picture "as-built changes to station landscaping,jpg"), Because of the discrepancy, the as-built landscaping plan for the transit platform must be provided to the City for the project file, 3, During the Final Site Inspection, staff observed that some of the plant materials installed along the covered pedestrian walkway were in poor condition and do not qualify as 5-gallon shrubs as described in the planting schedule on Sheet L2,2, Accordingly, these plants do not meet the landscaping requirements of the approved Final Site Plan. Staff advise that removal and replacement with appropriate nursery stock of the same variety is required, Pictures of some of the subject shrubs have been attached for your review ("plant materials 1-4,jpg"), 4, During the Final Site Inspection, staff observed that one or more shrubs appear to have been removed from a parking lot island near the mall entrance, A picture of the subject area is attached for reference ("plant material missing,jpg"). There is evidence ofrecent activity in the landscaping island, including footprints and disturbed ground. It is possible that plant material was removed due to mortality, or even theft, In any event, replacement of the missing plant material( s) with appropriate shrubs will be required, The items noted in #2-4 above do not require a follow-up inspection unless specifically requested by the applicant. However, please advise Planning when the necessary steps have been taken to address these items, If you have any questions, please contact me by email or call 726-3784, Thanks Andy Limbird City of Springfield 2 Date Received: ~/o11,)#'? Planner: AL