HomeMy WebLinkAboutPermit Building 1993-4-27
~,
M""J
'.
J
"'r'
,.~.
. J
\
,,'<'.
,
."
COM M ERCIALlI N DUSTRIAL
PERMIT APPLICATION
.
225 Fifth Street, Springfield, Oregon 97477
LOCATION .oF PROPOSEO WORK'
i.f-3S"o
3/
ASSESSORS MAP'
J?t92..
~2.
OWNER'
ADDRESS'
CITY:
r::"'~7 /)~!~'" I
V,y,O Mr..,--'
~~/
/
DESCRIPTION OF WORK'
NEW /" REMODEL
4.7;:;
ft?,~-J
ADDITION
DEMOLISH
.
JOB NUMBER '9 s/?:2"11
INSPECTION ,LINE: 726.3769
OFFICE: 726.3759
TAX LOT'
PHONF'
S"'~..,. €' ~
72-h - 0 -;(.\ <..
STAT'"
t'fJ_''-
9.7V7cP,
ZIP:
g,..u_~ ~
7
VALUE:
/80000
,
OTHER
ARCHITECT:
NAME
'l? .J'r..<-~C L
ADDRESS
.Yo AI. C;~ 'iT, .1IF-1J.
CaNST,
CONTRACTOR'
CONTRACTOR'S NAME
ADDRESS
GENERA' . ,<),.un .,......--
.../""
PLUMBING'
<..,./" ,
MECHANIC''' I . _
ELECTRICA" .-----
PLUMBING
NO, FEE CHARGE
Single Fixture
Relocated Bldg,
Inew fix, addtl)
~ JW~ter Service
"f.'.I/'~ /~ It.
~. Sanitary Sewer
<5'.0 It.
e",-- Storm Sewer
~;2 7 It.
Yo, .-.
~-
?~.-
Backflow Device
TOTAL PERMIT
/~- .
PHONE
EXPIRES
PHONE
11 '
~'
I
I Nn
1
I
I Floor furnace and vent
1 Suspended wall or floor
mounted unit heater
1 Appliance Vent
separate
I Stationaryevap.
cooler
1 Vent Fan/Single
duct
1 Vent System apart
from AC or htg.
1 Mechanical exhaust 1
hood and duct
~~?w'#....".e r~~~ ~ ~ ~~
I Permit Issuance
I TOTAL PERMIT
MECHANICAL
"""
t"I:lARGE-
Furnace/ burner & vent
< 100,000 BTUs
Furnace/ burner & vent
> 100,000 BTUs
$10.00
QUAD AREA"~~ X\'0
,
-O~~
LAND US". ~~
FLOOD PLAIN'
(\(' ./
. OF BLDGS'
. OF UNIT~'
OCCY GROUP'
CONSTR. TYp.,
HEAT SOURCE:
. OF STORIES'
SQ, FTG MAIN
SQ, FT,
~~
~C~
,
L)39~t;6
X
/.s-
$/SQ, FT,
X
SQ, FTG j\CG~~o
X
SQ, FTG OTHER
.e,~~~ ~C~:~~ 1"t~!5 -Jl~ ~~1 /
I BUILDING PERMIT
15% Slate
SurcharQe
I MECHANICAL
15% State
Surcharae
1 PAVING
-5g~,.2~
-:;?9. Y'/
1 PLUMBING
15% State
Surcharge
1 FENCE -~~ "",
VALUE $ A__.-".
1 SIDEWALK
FT.
1 CU RBCUT
FT.
7'1!JO
,
"
~
HANDICAP ACCESS:
laNING'
LIGHTING POWER BUDGET:
. WATER HEATER'
,
f ; I
, ,
VALUE
~~, <?//.:> 5'&1
,
r~~. --
...ao8~_ ~O
TOTAL VALUE OF PROJECT /.Q::>.~~
,
DATE
3';'4-<1} '3
.#~
.
BY
1"~5: .-
6.15
~'.P
DEMOLITION
~~h~ - /~.~
SUBTOTAL ~
PERMITS . Z> ~B. -9/
SYSTEMS oJ ,L
DEVELOPMENT If' ..,3'10.. '?f!.
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
S2 I)>, <t!>
'.'.:
"
,.
.
.
REQUIRED INSPECTIONS
It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City deslgnated'job number, job address, type of inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 B.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
x
y
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel is in
place but prior to placing
. asphalt or concrete.
x
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
UNDERSLAB PLUMBING,
, ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
ATTIC DRAFT STOPS &
CURTAIN WALLS
,
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
STRUCTURAL CONCRETE: In
excess of 2500 P,S,I. (306 a,1)
J!
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
x'
x
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
STRUCTURAL WELDS:
Performed on the job, (2722 f)
/r
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a,6)
y
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board Interior wall covering Is
applied, .
)(
" '
, \
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
SPRAYED ON
FIREPROOFING: U,B.G,
Standards 43.8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a.11 &
Chapter 29)
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
..Y
GLU-LAM BEAMS: Inspection
Certlftcate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.G,
STDS. 25.10,11),
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished, '
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing,
STRUCTURAL MASONRY: (306
a.7)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
SIDEWALK & DRJVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
* In addition to the inspec-
tions specified, the Building
Official may make or require
CURB AND APPROACH other inspections of any
ROOF SHEATHING AND APRONS: After forms are construction work to ensure
NAILING: Prior to Installing erected but prior to placing compliance with the Building,
any roof covering. concrete. City or Development Code.
--V----------------------------------------------------
./I FINAL PLUMBING X' SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be co~pleted before
requesting this Inspection.
/
FINAL ELECTRICAL
.(
y
t
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanIcal and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FJNAL MECHANICAL
FJNAL FIRE DEPARTMENT
AODITIONAL COMMENTS: /...-(C?: /lylJE} 'pLb')A)~
\J\<.C' ~
PLANS REVIEWED BY /7~"!-,,
~ .
.,P'~
,
DAT~ ""r -<..Y-S>"""
By signature, I state and agree, that I have carefully ex.amined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction~./ ~
Signature ,___,---~(_./ ____.' Date V- 2..7- ~J
"-~
DATE PAlO: 4/-2 ?~9;!
RECEIVED BY' . ~......"..~--
. /'FS--'
AMOUNT RECEIVED: ~z./"3, 2a.
5fj.2?/
VALIDATION:
RECEI PT ':
w J..
~f .
.
JOB NO. 9~()271
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
(COMMERCIAL & RESIDENTIAL)
.
NAME OR COMPANY: bA-R. V D U fS!<.A y'
LOCATION: Lf'?"io MA-,IJ 'S...,- 1702~'2.""-"Z?oO
DEVELOPMENT TYPE: CG: New 4/J.."(0 fAIN"- 13W6 .
BUILDING SIZE: qo,t. g-z.. ~7?51o \t,L. LOT SI7F
SQ, Ft.
1. STORM DRAINAGE
IMPERVIOUS SQ, FT. 'i?ql~ X $0.192 PER SQ, FT, Ct72? 8!;)
---------
2, SANITARY SEWER-CITY
NO, OF PFU'S Co X $39,78 PER PFU G 2-?B ,,~
(See Reverse) ~
3, TRANSPORTATION /,
C<>Vf.. 1<./0 Nl"o.jUfl<<-"f.:. 0, lS I [& SF'
NO OF UNITS X TRIP RATE X COST PER TRIP
7.';,%
X .7"> X $401.05
C:Z2.I'l%!:)
-- --
x
X $401.05
$
x
X $401,05 $
SUBTOTAL (ADD ITEMS 1,2, & 3) $ '-fl&! 3...!-
4, ADMINISTRATIVE FEES
BASE CHARGE (SUBTOTAL ABOVE) X .05
~
-.... ---
TOTAL-CITY SDC $ <I-'3/10;.!
5. SANITARY SEWER-MWMC
NO. OF PFU'S N. A x $13,62 PER PFU + $10 MWMC ADMIN. FEE $
(Use PFU Total From Item 2 Above)
0"" ~L.k
'--V Kip Burdick
SDC Coordinator
? 1'7...'-1 /<f~
I
$ -
TOTAL-MWMC SOC~~ ~
-
TOTAL SDC $ tf-;,,/o'?>.!....
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
. . /'Tv\
FIXTURE UNIT CALCUU\TION TABLE: Number of New Fixtures X Unit Equivalent; Fixture Units (NOTE:
For remodels, calculate only the NET additional fixtures)
FiXTURE TYPE
NUMBER OF
NEW FIXTURES
UNIT
EQUIVALENT
Bathtu b....................... ............ ...................................
Drinking Fountain....,......"................"......,............",
Floor Drain......"............",...............,.......",......,..,.....
Interceptors For Grease/Oil/Solids/Etc,................
Interceptors For Sand/Auto Wash/Etc......,...........
La und ry Tub /Clotheswasher...,..,.....".........,.,.....",.
Clotheswasher - 3 Or More.....................................
Mobile Home Park Trap (1 Per Trailer)..................
Receptor For Refrigerator fWater Station/Etc.......,
Receptor For Commercial Sink/Dishwasher /Etc..
Shower, Singl e Stall........"...........,."..,.....".,.."..,..,..
Shower, Gang,...............,...,.....,..,........"........,..,.....,
Sink. Bar, Commercial,..........,......,.."",.....".,....",."
Urinal, StallfWall..,..,.............,.. "....", "."."..,..,..,..",.,
Wash Basin/Lavatory, Single,.....,..........................,
Water Closet. Pubiic Installation..........,.................,
Water Closet, Private..,........................ ...................
Miscellaneous:
2
1
2
3
6
2
6
6
1
3
2
I/Head
2
2
1
6
4
1-;
TOTAL FIXTURE UNITS
FIXTURE
UNITS
~
(,
CREDIT CALCULATION TABLE: Based on assessed value, If improvements occurred after annexation date in table,
calculate credits separates.
Year
Annexed
Rate per $1,000
Assessed Value
Year
Annexed
1979 or before
1980
1981
1982
1983
1984
$2,83
2.76
2,71
2,60
2.46
2.33
1985
1986
1987
1988
1989
1990
1991
~
Credit for Parcel or Land Only If Applicable
X$
(Rate X Assessed Value)
X $
(Rate X Assessed Value)
CREDIT TOTAL = $
Improvement (if after annexation date)
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
Residential................,.."....." ....., .........,............ 0.4
CommerciaL......,......................,..,.....,..........." 0.9
._ Industrial........................................................... 0.45
Governmental.,..............,.....,...,.....".......,......... 0,5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT
Rate per $1,000
Assessed Value
I
I
$2,16
1,90
1.60
0,25
0,87
0,50
0.16