Loading...
HomeMy WebLinkAboutComments APPLICANT 6/16/2009 " L1MBIRD Andrew From: Sent: To: Cc: John Souza Dsouza@ktainc.net] Tuesday, June 16, 20092:11 PM L1MBIRD Andrew; 'CHINITZ Amy C: DAVIS Chuck (SUB); CASTILE Robert; AmLShah@walgreens.com; Hakim.Yala@walgreens.com; mgr.11643@store.walgreens.com. RE: REVISED FINAL Walgreens Clinical Pharmacy HMMP, . REVISED_REVISED FINAL_HMMP _Walgreens Clinical Pharmacv-Springfield_June2009,pdf Subject: Attachments: Andy & Amy, A couple of changes were made to the contact information located in Section 2.1 (Page 2) of the REVISED FINAL HMMP for the Walgreens Clinical Pharmacy in Springfield, OR The attached electronic file includes those changes. So, one can either disregard the file I sent in its entirety yesterday or just print Page 2 of the file above for the changes to the Plan. If you have any questions, issues, or concerns with the attached electronic version of the REVISED FINAL HMMP, please do not hesitate to contact me directly. . Thanks,John John M. Souza, P.E. KTA Associates, Inc. 800 5th Ave, Suite 4100 Seattle, WA 98104 206.447.1450 (Office) 206.374.2279 (Fax) .425.301.8920 (Mobile) isouzalalktainc.net (E-mail) www.ktainc.net (Web) From: John Souza [mailto:jsouza@ktainc.net] Sent: Monday, 15 June, 2009 13:03 To: 'LIMBIRD Andrew'; 'CHIN ill Amy C.' Cc: 'DAVIS Chuck (SUB)';' 'CASTILE Robert'; 'Ami.5hah@walgreens.com'; 'Hakim.Yala@walgreens.com'; 'mgr .1164 3@store.walgreens.com' Subject: REVISED FINAL Walgreens Clinical Pharmacy HMMP Andy & Amy, Attached is an electronic copy of the REVISED FINAL HMMP for the Walgreens Clinical Pharmacy in Springfield, Oregon. All comments made by SUB and the City are addressed in the REVISED FINAL HMMP. The HMMP text changes/revisions are as follows: . HMMP, Page 2: Section 2.1 has been added to provide Facility Staff Designated to Implement the HMMP and Its Requirements; ;, . HMMP, Pages 5~, Section 4.1: Detailed information concerning secondary containment devices for pharmaceutical items and medicines; . HMMP, Pages 6, Section 4.1: Detailed information concerning secondary containment devices for regulated hazardous waste (in the event that it is generated);- 1 Date Received:~,ij~7.r""~ Planner: AL . HMMP, Page 11, Section 7.0: Text has been modified to address that the Facility is unlikely to generate '. regulated hazardous waste at this time. However, in the event that such waste is generated and stored at the Facility, it will be inspected as stated in Plan Section 7.2; and . HMMP, Page 11: Section 7.2 has been added to address Hazardous Waste Storage Monthly Inspections, in the event that regulated hazardous waste is generated. . Three hard copies of the REVISED FINAL HMMP are in the process of being reproduced. They will be sent to the attention of Andy Limbird at the City Planning Division. These hard copies will arrive NL T June 17, 2009. If you have any questions, issues, or concerns with the attached electronic version of the REVISED FINAL HMMP, please do not hesitate to contact me directly. Thanks, John John M. Souza, P.E. KTA Associates, Inc. 800 5th Ave, Suite 4100 Seattle, WA 98104 206.447.1450 (Office) 206.374.2279 (Fax) 425.301.8920 (Mobile) isouza@.ktainc.net (E-mail) www.ktainc.net(Web) From: LIMBIRD Andrew [mailto:alimbird@cLspringfield.or.us] Sent: Thursday, 04 June, 2009 16:06 To: Ami.5hah@walgreens.com; Hakim.Yala@walgreens.com; 'mgr;11643@store.walgreens.com' Cc: CHINill Amy c.; jsouza@ktainc.net; DAVIS Chuck (SUB); CASTILE Robert Subject: Walgreens Clinical Pharmacy DWP All: After lengthy discussions between Walgreens representatives, Springfield Utility Board (SUB) Water Quality staff and Springfield staff, the City's Building Official has issued occupancy for the Walgreens clinical pharmacy located at RiverBend Pavilion. This allows the pharmacy to begin operations and open to the public. All other conditions of existing land use approvals (including the recently-issued Drinking Water Protection permit, Case DRC2009-00019) remain unchanged and in effect. The occupancy may be rescinded and is subject to a satisfactory final inspection by SUB Water Quality on or around Tuesday June 16, 2009. Final arrangements for the site inspection are to be made between,Walgreens and the SUB Water Quality Protection Coordinator (Amy Chinitz, 541-744-3745). Additionally, a revised Hazardous Materials Management Plan (HMMP) for the Walgreens clinical pharmacy is being prepared for submittal to SUB Water Quality Protection and the City of Springfield. Planning staff requests that three (3) hard copies of the final HMMP are submitted along with an electronic copy in .pdfformat, The electronic copy can be sent to the project planner at: alimbird(ci)ci.sDrin~field.or.us, . If you have any questions, please contact me by email or call 541-726-3784 (direct). Thanks Andy Limbird City of Springfield 2 Date. Received:_''o6&/ Planner: AL ).