HomeMy WebLinkAboutComments SUB 1/15/2008
01/1612008 10:12 FAX 7477348
WSC FAX
I4J 002/003
SPRINGfiELD. UTILITY BOARD
\Vi\Tr-:RSFRV1CE C:E\nTR 202 South 1at~ Street Springfleld. OR 97477-5240 ruI541.726.239'6 F<}II 541:747.73.48 "';"ww,sybutil.com
January 15, 2008
Molly Markarian
City of Springfield
22S'N. 5th Street
Springfield, DR 97477
, fV\1>ILu -
Oear MaflE: .-
SUBJECT:
SITE PLAN TENTATI\(E #DRC2007-00083 TOKATLY /TITRANCH ..
Tax Map 17-02-32-31, Tax Lot 100,4396MainStreet
Listed below are our comments for the above referenced development proposal:
1. The proposed development is within the Springfield city limits and will receive water service
from the Springfield Utility Board (SUB). The existing service to this property is a %" service
(IS gpm). Ifa larger service or afire line ~1I be required for this development, 44th Street will
need to be cut to access the 6" water main.
2. All new water system facilities and modifications to water system facilities both inside and
adjacent to the proposed development shall be placed in street right-of-way at a location and
depth of bwy that meets the standards of the SUB Water Division.
,
3. All water facility materials shall be to a standard that must meet SUB :Water Division
specifications. .
4. All workmanship shall be performed to meet or exceed SUB Water Division'construction
standards.
S.' Size of waterline and othei'facilities, including water meters, must meet the needs of the SUB
Water Division and the long-range needs of the City. These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission Iines,pumping facilities,
and communication lines.
6. Please ask the developer to,contabt the SUB Water Division for detailed inf~rmation on the
materials and construction standards, detailed costs for installing SUB water facilities, and a
schedule of construction. Construction expenses may be reduced with good pI arming of required
water facilities, good timing of facilities installation, and joint trench opportUnities.
7. All water meters will be placed in public right-of-way at a location identified by the developer.
Each lot or parcel must have its own water service,
8.. Water service facilities will be installed upon collection of development charges. Development
policies and charges identified in this letter are subject to change, Actual cruirges will be those in
S,\SITEPLAN\4396 Main Street site plan tentative, 1-15-08.docx .
Dat€lHeceived:
Planner: AL
I /;~ ~tf'
(
OlllO/200B 10: 12 FAX 7477348
WSC FAX
'141003/003
effect at the time water service is' requested.
9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water
comes. from wells. In every instance, care shall be taken to prevent groundwater containination.
Contractorsldeve10pers/owners shall be responsible for the safe handling and storage of .
chemicals, petroleum products, fertilizers, and the prevention of groimdwater and storm water
runoff contamination.
Special requirements may be necessary for groundwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2396.
10. Backtlow prevention devices will be required for this service. Please contact Chuck Davis at
726-2396 prior to installing water service. Chuck can help in the selection ofthe most
economical device and location. Water service will not be provided until a backtlow plan has
been submitted to SUB Water Engineering and approved for installation.
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division arid
SUB Electric Division.
Sincerely,
Ii- 4k
Rebecca Templin, P.E.
Water Engineering Supervisor ~ Water DiVision
RAT:mk
cc: Kelly O'Brien, Northwest Construction Services, P.O. Box 231087, Tigard, Oregon 97281
Mike Kaiser, Poage Engineering, P.O. Box 2527, Eugene, Oregon 97402
Joseph A. Tokatly, TIT Ranch, LLC, P.O. Box 2121, Jasper, Oregon 97438
S:\SITEPLAN\4396 Main Street site plan tentative l-15-0B.doex
Date Receivl;ld: II(do"f'
Planner; AL
....
SI' 1<'1 NX1'F'L E'CLl, l!:1' r.b.l.:r ,Y 'n ()",\~R j0'
11'001 Main Street ~Springfield, OR 9.7477-4819 'Tel54t.726.123-95 lEa'x:S41'>!26',23'i9 ~';':-;W:,y:'s'JJ)SfiLEcirri
"
1/4/2008
TO: CITY OF SPRINGFIELD
DEVELOPMENT SERVICES DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE
PLANNER: MOllY MARKARIAN
CASE #:
DRC2007 -00083 (TOKA Tl Y/TTT RANCH)
I.
[ X JOVERHEAD SERVICE
[ ] UNDERGROUND SERVICE
II. LOCATION OF NEAREST ELECTRICAL CONNECTION:
WEST SIDE OF 44TH STREET; NORTH SIDE OF MAIN STREET
III. EASEMENT LOCATION AND WIDTH;
1) 7' STREET SIDE EASEMENTS ALONG 44TH & MAIN STREETS
IV. COMMENTS:
1) RED SUNSET MAPLE TREES UNDER POWERLlNES ARE
UNACCEPTABLE:'
I
Common name.. Red Sunset Red Maple
Scientific name.. Acer rubrum - 'Red Sunset'
Mature height.. 50 to GO feet
Mature spread.. 40 to 50 feet
TONY TALBOT
ENGINEERING TECHNICIAN
SPRINGFIELD UTILITY BOARD
Date Received:
Planner: AL
A~K
1 1