SITE PLAN REVIEW
PRE-SUBMITTAL CHECKLIST
Project Name: LTD Gateway Mall Station
Project Proposal: Construct new bus station on Gateway Street, construct covered
pedestrian walkway connection to mall, and remove existing bus station from mall parking
lot
Case Number: PRE200i-00082
Project Address: 3000 Gateway Street
Assessors Map and Tax Lot Number(s): 17-03-22-00, TL 2200 & 2300
Zoning: Community Commercial (CC)
Overlay District(s): Drinking Water Protection (DWP)
Applicable Refinement Plan: Gateway
Refinement Plan Designation: Community, Commercial (CC)
Metro Plan Designation: . Commercia.1
Pre-Submittal Meeting Date: December 4, 2007
Application Submittal Deadline: June 1, 2008
Associated Applications: ZON2006-00040; ZON2007-00025
I!(;:Im.vlOfjSp.RIN~aEL!D1D.I:V:EI!Op.MENrrIl1REVIEWAiTE~M----' .. ....,
1 POSITION ' REVIEW OF NAME
1 Proiect Planner Land Use Planninq Andy Limbird
1 Transportation Planninq Enqineer Transportation Garv McKenney
I Public Works Civil EnQineer Utilities Eric Walter
I Public Works Civil Enqineer '1 Sanitarv & Storm Sewer Eric Walter
1 Deputv Fire' Marshal 1 Fire and Life Safety Gilbert Gordon
1 Community Services Manaqer 1 Buildinq Dave Puent
""-"'1'- ,,- ....... .....
. PHONE 1
726-3784 1
726-4585 I
736-1034 I
736-1034 1
726c2293 1
726-3668 I
fAp.p.W:C~Nm'SjQEV:EI!OP.MENiI"illREVIEWIITEAM~ 4i_lIi.I~"'T-' 'T" '~Ilr~'" -- ""--'1
Applicant Project Manager
Stefano Viggiano Mark Young
Lane Transit District Rowell Brokaw Architects
3500 E. i7th Street One East Broadway, Suite 300
PO Box 7070 Eugene, OR 97401 ,
. EUQene, OR 97401-0470
Revised 10/25/07
Data ~eceived:4H/,?n>:L-
Planner: AL
. I .'
TENTATIVEl'ITE PLAN ItEVIEW!PPI..ICATION
PRE-SUBMITTAL CHECKLIST
,
PLANNING
o Copy of the Site Plan reduced to 81h"x 11"
Complete Incomplete See Planning
Note(s)
1
o Application fee - discuss the applicable f~es
G"1
~
rB3
8 V2" X 11" Copy of Site Plan
o Copy of the deed and a preliminary title report issued within the past 30 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property owner is required.
'Complete Incomplete See Planning
Note(s)
rB3 ljj]
Deed and Preliminary Title Report
o Brief narrative explaining the purpose of the development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. The narrative should also include the proposed number of employees
and future expansion plans, if known,
Complete Incomplete See Planning
Note(s)
[gJ ~ Brief Narrative
o Site Plan
Complete Incomplete
See Planning
Note(s)
2, 3
f;':'l
~
rB3
~
r&l
Llli@
rB3
r;;;I
l.!'lli
~
~
h15
.'M.M
[gJ
G"1
l::tJ
Revised 10/25/07
Prepared by an Oregon Licensed Architect,
Landscape Architect, or Engineer
Proposed buildings: location, dimensions,
size (gross floor area applicable to the
parking requirement for the proposed
use(s)), setbacks from property lines, and
distance between buildings
Location and height of existing or proposed
fences, walls, outdoor equipment, storage,
trash receptacles, and signs
Location, dimensions, and number of typical,
compact, and disabled parking spaces;
including aisles, wheel bumpers, directional
signs, and striping
Dimensions of the development area, as well
as area and percentage of the site proposed
for buildings, structures, parking and
Date Received: /~d7 .
Planner: AL
[gJ
~,
B
r:::"1
~
[gJ
~.-
",....~
-.
17)'
IZj;J
[gJ
[gJ
4
5
vehicular areas, sidewalks, patios, and other
impervious surfaces '
Observance of solar access requirements as
specified in the applicable zoning district
On-site loading areas and vehicular and
pedestrian circulation
Location, type, and number of bicycle
parking spaces
Area and dimensions of all property to be
conveyed, dedicated, or reserved for
common open spaces, recreational areas,
and other similar public and semi-public uses
Location of existing and proposed transit
facilities
o Phased Development Plan Where applicable, the Site Plan application must include a
phasing plan indicating any proposed phases for development, including the boundaries
and sequencing of each phase. Phasing must progress in a sequence promoting street
connectivity between the various phases of the development and accommodating other
required public improvements, including but not limited to, san italy sewer, stormwater
management, water, and electricity. The applicant must indicate which phases apply to
the Site Plan application being submitted,
Complete Incomplete See Planning
Note(s)
[gJ
B
B
o Landscape Plan
Complete Incomplete
r;;;I
J12J
G"1
Et.J
[gJ
G"1
l!:i..:J
[gJ
r:rI
0'
~
R7I
~
See Planning
Note(s)
2
6, 7
r:rI
~
r8iJ
8
~
[gJ
9
o Architectural Plan
Complete Incomplete See Planning
Note(s)
~ B
Revised 10/25/07
Phased Development Plan
Drawn by a Landscape Architect
Location and dimensions of landscaping and
open space areas to include calculation of
landscape coverage
Screening in accordance with SDC 4.4-110
Written description, including specifications, of
the 'permanent irrigation system
Location and type of street trees
List in chart form the proposed types of
landscape materials (trees, shrubs, ground
'cover), Include in the chart genus, species,
common name, quantity, size, spacing and
method of planting
Exterior elevations of alj buildings and
" Date ~eceived: /~o/';""L-
Planner: AL
,
rB3
ljj]-
'.S.%',
".=-,
\
structures propo~a for the development site,
including height
Conceptual floor plans
o On-Site Lighting Plan
Complete Incomplete ,See Planning
Note(s)
B ~ 10
[;J
[gJ
10
Location, orientation, and maximum height of
exterior light fixtures, both free standing and
attached
Type and extent of shielding, including cut-off
angles and type of illumination, wattage, and
luminous area .
Photometric test report for each light source
r;;;I
Ilf2.J
r8iJ
10
Planning Notes:
1. Provide a separate 8.5"x11" copy of the site plan with the application submittal.
2. Landscaping plans must be signed by the Landscape Architect, ,
3. Site plans must be signed by an architect or engineer, as appropriate,
4. 'At least 10 bicycle parking spaces (3 long-term, 7 short-term) are required for the
transit station in accordance with SDC Table 4.6-3. The bicycle parking spaces
required for the transit station will not be attributed to the requirements for the Mall
site,
5, Provide a full-size plan sheet showing proposed right-of-way dedication for Gateway
Street. Proyide calculation of total dedication area in square feet,
6, Site plans and project narrative shall describe the existing landscaping area (in
square feet) that is being converted to parking spaces.
7, Landscaping plans shall describe the total square, footage of the area proposed for
landscaping.
8. Irrigation details not provided, and new irrigation system required for existing bus
station proposed for conversion to a landscaped parking lot island,
9. Landscaping plans shall provide quantities of trees and shrubs proposed for the site
to ensure parking lot planting requirements are met in accordance with SDC 4.4-105.
10. Project narrative indicates lighting plans will follow at Building Permit stage.
However, lighting cutsheets and luminaire schedule were submitted with pre-
submittal package, Please provide full lighting submittal with site plan application.
Additional comments not related to the completeness of the application:
. Diagrams provided i':l the project narrative should be included with the full-size plan
set. "
· Drinking Water Protection Overlay District application will be required for the project.
. Tree felling application will be required to remove more than 5 street and parking lot
trees,
· Project narrative intermixes the old Code citations with new Code citations. Please
refer to the reformatted "new" Code for all citations,
· The agreement for responsibility of maintaining and operating the transit station
should extend to the City which has an interest in the site (partially located in the
public right-of-way. Therefore, a tripartite agreement may be required.
. Project narrative should include details on landscape and tree protection during
construction.
Revised 10/25/07
Date Received: /~/~.,;l907
Planner: AL
I
. Check citation on Paye 28, bottom of page.
. Provide traffic signage and line painting plan.
. The project may trigger the requirement for a Land Drainage Alteration Permit
(LDAP), This can be discussed with the City's Public Works Department, ,
. Some typos have been noted in the project narrative and will be verbally shared with
the applicant at the meeting.
. Information on the irrigation system, lighting, erosion and sediment control, bicycle
parking and other matters will be required with the site plan application submittal, not
deferred to the construction plans. ,
. Drainage and paving details required for former bus station area proposed for
conversion to parking and landscaping,
. Extend curb by 2 feet where front-in parking spaces abut landscaping areas to
account for bumper overhang. Alternatively, provide curbstops'in these locations.
Revised 10/25/07
Date Received: /,).-H~7
Planner: AL' "
,
TENTATIVE' ::,ITE PLAN REVIEW'PPLICATION
PRE-SUBMITTAL CHECKLIST
Engineer:' Eric Walter
Case#: PRE2007-00082
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete
Incomplete
~
See PW
Note(s)
1
~
~
IZ;]
~
[j]
,~
f";jgl",
~
r;=l
L:iJ
~
r;:;:'1
I.!2BJ
~
~
FFl
u=J
~
~
Revised 10/25/07
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing site
features including buildings, cu~b cuts, trees and
impervious surface areas, clearly indicating what is
remaining and what is being removed. For existing
structures to remain, also indicate present use, size,
setbacks from property lines, and distance between
buildings
The name; location, dimensions, direction of flow and
top of bank of all watercourses and required riparian,
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
The 100-year floodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map R~vision
The Time' of Travel Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Development Services Department
Physical features including, but not limited to trees 5"
in diameter or greater when measured 4 V2 feet above
the ground, significant clusters of trees and shrubs,
riparian areas, wetlands, and ~ock outcroppings
Soil types and water table information as mapped and
specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must be
submitted concurrently if the Soils Survey indicates
the proposed development area has unstable soils
and/or a high water table
Date Recei~ed: /.l.;f~ /'
, Planner: AL
o Improvement and PI.l_.jC Utilities Plan must be in com~"dnce with the regulations of
SDC Sections 5.17-100, 4.1-100, 4,2-100, and 4.3-100 and must include the following'
information:
Complete Incomplete
~ ~
10, ~
~
R
li8
~
~
See PW
Note(s)
1
2
o Grading and Paving Plan
Complete Incomplete See PW
Note(s)
~
~
[g
b:'J
G1
~
~
~
!D
r;g;;1
t2J
~
r,;;J
lli8.
~
R
~
Prepared by an Oregon licensed 'Civil Engineer
Location and width of all existing and proposed
easements
Location of existing and required power poles,
'transformers, neighborhood mailbox units, and similar
public facilities
Location and size of existing and proposed utilities on
and adjacent to the site, including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV.
Indicate the proposed connection points
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
. ,
Landscape Architect where plants are proposed as
part of the stormwater management system
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size ,and location of stormwater management
systems components, including but not limited to:
drain lines, catch basins, dry wells and/or detention.
ponds; stormwater quality measures; and natural
drainageways to be retained
Existing and proposed spot elevations and contours
lines drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
il)tervals)
~mount of proposed cut and fill
o Stormwater Management System Study - provide four (4) copies of the study with
the completed Storm water Scoping Sheet attached. The plan, calculations, and
documentation must be consistent with the Engineering Design Standards and
Procedures Manual.
Complete Incomplete
[31 ~
Revised 10/25/07
See PW
Note(s)
Scoping Sheet and attached Stormwater Management
System Study ,
Date Received: /.2-/V,;..o7
Planner, AL
PW Notes:
1. Please revise plans as necessary to clearly demonstrate what is existing and what is
being proposed. The scope of work needs to be very clear on the proposed plan.
It appears there is too much line work that does not bring out the actual work.
2. No structures are allowed to be constructed in or over easements
Additional comments not related to the completeness of the application:
.
Revised 10/25/07
Datel Received: /YY.&<>7
Planner: AL
TENTATIVE -flTE PLAN REVIEW""APPLICATION
PRE-SUBMITTAL CHECKLIST, '
Deputy Fire Marshal: Gilbert Gordon
Case #: PRE2.007-00082
FIRE
o
o Site Plan
Complete Incomplete See Fire
Note(s)
,~
r;;;J
~
On-site vehicular circulation
o Improvement and Public Utilities Plan
Complete Incomplete See Fire
Note(s)
[gJ
G]
Location of existing and required fire hydrants and
similar public facilities
Fire Notes:
1.
Additional comments not related to the completeness of the appliCation:
No additional comments.
(
Revised 9/24/07
Date Received: /~Y~7
Planner: AL
~ENTATIVE S'ITE PLAN REVIEW!PPLICATION
PRE-SUBMITTAL CHECKLIST
Transportation Engineer: Gary McKenney Case#: PRE2007-00082
Applicant: Gateway Mall/LTD
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on an Oregon Department of Transportation (ODOT) facility,
Complete Incomplete See Transportation
'Note(s)
[gJ
ru
tsJ
Copy of ROW Approach Permit Application
o 'Traffic Impact Study - four (4) copies of a study prepared by' a Traffic Engineer in
accordance with SDC 4.2-105 AA.. Traffic Impact Studies (TIS) al,low the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a giyen
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems, A TIS must also
address, if needed, City, Metro Plan, and state land use and transportation policies ,and
objectives,
Complete Incomplete See Transportation
Note(s)
r8iJ
r;;;I
G:.J
Traffic Impact Study
o Site Plan
Complete Incomplete' See Transportation
Note(s)
~
r:rI,""
@
Access to streets; alleys, and properties to
be served, including the location and
dimensions of existing and proposed curb
cuts and curb cuts 'proposed to be closed
o Improvement and Public Utilities Plan
Complete Incomplete
See transportation
Note(s)
1
Location and type 'of existing and
proposed street lighting
Location, width, arid construction material
of all existing and proposed sidewalks,
sidewalk ramps, pedestrian access ways,
, and trails
r9 [gJ
[gJ []
~
r:t
liE
,
Location, widths (of paving and right-of-
way) and names of all existing and
, proposed streets, alleys, dedications, or
Date ~eceived: /Yo/d<?O'7
Planner: AL '
Revised 10/25/07
B
[gJ
2
other right-<l';1'':ways within or adjacent to
the proposed development, including
ownership and maintenance status, if
applicable
Location of existing and required traffic
control ,devices
Transportation Notes:
1. Revise plans to distinguish between proposed/existing "street lights" and "traffic
signals," ,
2. Provide a separate plan sheet to show existing and proposed traffic signal poles, mast
arms and signal head locations/functions,'
Additional comments not related to the completeness of the application:
.
Revised 10/25/07
,
Date, Received:~/~7
Planner: AL
ANY REQUIRED AbDITIONAL MATERIALS~PPLlCATIONS OR
PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable
Not
Applicable
~
Where a multi-family development is proposed, any additional
materials to demonstrate compliance with SDC 3,2-240
Riparian Area Protection Report for properties located within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
tributaries of WQLW
A Geotechnical R!,!port prepared by an engineer must be submitted
concurrently if there are unstable soils and/or a high water table
present
Where the development area is within an overlay district, address
the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC 5.19-100 f
, A wetland delineation approved by the Oregon Division of State
Lands must be submitted concurrently where there is a wetland on
the property
Any required federal or state permit must be submitted
concurrently or evidence the permit application has been submitted
for review
1'3
~
1'3
~
[gJ
~
[gJ
[gJ
[gJ
ISJ
~
1i#1Z1,''','
~
~
r;;;I
l!ill
[gJ
[gJ
r.:;:'l
l2:J
Where any grading, filling or excavating is proposed with the
development, a Land and Drainage Alteration permit must be
submitted prior to development
Where applicable, any Discretionary Use or Variance as specified in
SDC 5,9-100 and 5.21-100
An Annexation application, as specified in SDC 5.7-100, where a
development is proposed outside of the city limits ~ut within the
City's urban service area and can be service,d by sanitary sewer
r;;;I
IJ!EJ
~~'
=7
.,~.
[gJ
~
Revised 10/25/07
Date Received: /...;i- /.;m."'7
,- Planner: AL
THIS APPLICATION IS:
o COMPLETE FOR PROCESSING ,
~ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED AB9VE'
a~ipj~J
/J - i/ - ,)[)07
City fner', Date
This is not a decision on your application. Springfield Development Code Section 5A-
105 and Oregon Revised Statutes 227.178 require the City take final action on a limited land
use decision within 120 days after the application is deemed complete., The 120-day
processing period for this application begins when all the missing information is submitted or
when you request that the City proceed without the information, You must indicate by either
, signing this form or by submitting a written response to the City within seven days of the
date of this form asserting your intentions regarding the provision of the missing information.
If you indicate herein or in your written response that the missing info~mation will be
submitted, then you have 180 days from the date the application was submitted for Pre-
Submittal Reyiew to provide the City with the missing information. If you refuse to submit
the missing information, then upon receipt of the full application packet and processing fee,
the City will deem the application complete for purposes of starting the 120-day clock and
begin processing the application. No new information may be submitted after the start of
the 120-day period unless accompanied by a request for an extension of the 120-day
processing time. Upon receipt of a request for extension, the City may extend the 120-day
period for a reasonable period of time. The City may also require additional fees if the new
information is submitted after the Notification to Surrounding Property Owners is sent out
and a second notification is required or if the new information substantially affects the
application proposal and additional review is required,
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the lSO-day timeline.
~# -?
Owfier/APPli1't's Sigfature
, ,
Revised 10/25/07
Date. Received:...L.z./~).nQ_
Planner: AL '