Loading...
HomeMy WebLinkAboutPermit Building 1993-3-25 COMMERCIAL/INDUSTRIAL. PERMIT APPLICATION 225 Fifth Street. Springfield. Oregon 97477 OWNER: ADDRESS: CITY: DESCRIPTION OF WORK: NEW RE~ODEL L ADDITION ARCHITECT' '.. ~!1::11en I , PLUMBING: MECHANICAl' . . ELECTRICAL: fJ.;,v,M [t.l'htt PLUMBING NO. Single Fixture Relocaled Bldg. (new fix. addtll Water Service It. Sanitary Sewer It. It. Storm Sewer Backflow Device TOTAL PERMIT OUAD AREA # OF BLDGS' OCCY GROUP' # OF STORIES: SO. FT. SO. FTG MAIN SO. FTG ACCESS SO. FTG OTHER ~.2>.E"Z-. PLAN CHECK FE.E ~ ~ I BUILDING PERMIT 15% State . SurcharQe 1 MECH~~ 15% State . 1 SurcharQe I PAVING ' I ?i?~,Sl:::1 7.5? ('c>.-o /C_- _v ~,~ . JOB NUMBER ~-;. ;-'/ . - - l\ PHONE: 7~'-.tf1) 7 ~ I D/( ZIP: -.!l7'16 5 J~) I 'N 1'U1"I,'1 6fJt4CJP., VALUE: .C;-~p ;Y#~ 1/1. ~~ ~ tf~/ 3. tIIA/nJ INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK' ASSESSORS MAP:J77J2 ~'2 -~ < /1Itl~/(~ u.b/f 70/30 FvwJdfJ&jd 6t1'1~~ ;Vel.() ~e.Jt'.IM/ aJ.~~;~S CO NST. CO NT RACTO R:;'NAM Ej II /' ADDRESS / CONTRACTOR # GENERA" ~k//eIl (~dlAl InkTM.1v ~~'i3:;2.. 7"ZS ''I,). ~"TA IJVC Cll~' 't1'YPS- TAX LOT- ~ A....0 STATF' ~F/I2hi,'tkJ,s DEMOLISH OTHER . PHONE EXPIRES /~-//-9-3 . d7%J/...if/A1 &k{(1' l7t)flJ . 10""97, MECHANICAl. FEE NO ~.~ CHARGE Furnace/burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent FanlSingle duct Vent System apart from AC or htg. I Mechanical exhaust" hood and duct ~KP~-~. PermIt Issuance TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: - LAND USF' FLOOD PLAIN: # OF UNITS' ZONING' LIGHTING POWER BUDGET: WATER HEATER: CONSTR. TYPF' HEAT SOURCE: $/SO. FT. VALUE X X X " TOTAL VALUE OF PROJECT ~V RCPTN -;;>"'9/? ,- - DATE -5-..25 ~ BY r:::?' -= .,. ~ " PLUMBING DEMOLITION 5% State Surcharge FENCE VALUE $ SIDEWALK I '1 FT.I SUBTOTAL PERMITS SYSTEMS DEVELOPMENT 'FT. CURBCUT TOTAL PERMIT FEES I' EXCLUDING ELECTRICAl PHONE ~-~~ }.,'f.~-7~7 I ~HARGI I I I I I I I I /~-I $10.00 I I ...,..- .... I I It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, cap 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be ma98 the same working day, requests made after 7:00 a.m. will be made the fOllowing work day. SITE INSPECTION: To be made after excavation, but prior to setu~ of forms. . REQUIRED INSPECTIONS . . . y ROUGH PWP...:.".':', . ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After gravel Is In place but prior to placi ng asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. UNDERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: TO-be made before any work is covered. ., ATTIC DRAFT STOPS & CURTAIN WALLS ,) FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equi pment items are I n pI ace but before any concrete is placed. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. . STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: I During all bolt installation and tightening operations. (306 a.6) UNDERGROUND: Plumbing; electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) y LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board. Interior and exterior, Is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. GLU-LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before I beams are placed. (2501 U.BC. STDS. 25-10.11). I STRUCTURAL MASONRY: (306 a.7) I I I POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to In"stallation of decking or floor sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made atter all excavating complete and form work and sub-base material in place. MASONRY: Steel location. bond beams grouting or verticals in accordance with UBC 2415. *In addition to the Inspec- tions specified. the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. I ------------------------------------------------------T FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are" erected but prior to placing concrete. .x FINAL ELECTRICAL J( FINAL MECHANICAL )< FINAL BUILDING: Requested after the final plumbing. electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. . I I I I - I PLANS REVIEWED BY // ~ ~ --. DATE 7~Y~~ l-/:?,-""'" ~~ /' -I , I By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance w.th ORS 701.055 will be used on this project. I I further agree to e re at I required inspections are requested at the proper time, that ~roject address Is readable from t~e street, that thep mlt c d located at the front of the property, and the approved set of plans will remain on the site at all ::::t:~~lng con tru n. i~~he/t ~f3?A/ rlw! l?'c Dato 3-dS--1~ x FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: VALIDATION: AMOUNT RECEIVED: RECEIPT ': ///. ~ /" ?-"J /'~ DATE PAID' RECEIVED BY: 1 ?-:23 :>...r I ~1I'!~~1. //- 1 I