Loading...
HomeMy WebLinkAboutPermit Building 1996-7-10 ~ COMMERCIAL/INDUSTRIA' PERMIT APPLICATION ~ . JOB NUMBER ~..$Ol:. INSPECTION LINE: 726-3769 OFFICE: 726.3759 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK' 4/2C7'5" /:??.4??/ '$;>< ASSESSORS MAP' /? .~:::? -?-l ~-7:? TAX LOT: O~r.::> OWNER' ADDRESS: ~~~.::>/~ ~'7.r ~?:./') . /h<9~"'/"~/51'/~ ~ E/.~t!E::':' iF STATE: PHON'" CITY: ,??,4>. DEMOLISH r:. .l~ O~HE~. ZIP: =t/qC) / OESCRIPTION OF WORK: NEW REMODEL AODITION VALUE: /$>~-""" NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME GENERAL:.~Z'A/E'"~~: ~-_ PLUMBIN'"" ADO);IESS ,..- ~~~ /- -" - - ,~ , CONST. CONTRACTOR' EXPIRES PHONE ~:;>/ .Ji?..:?:>~~ &8'7-CY.t?=? '" ' MECHANICAl' ELECTRICA' . I I NO. I I I I I I I I I I I I PUJMBING MFr.HANICAI. FEE CHARGE J Nn ft. Furnace/burner & vent <100.000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart Irom AC or htg. Mechanical exhaust hood and duct ."" I ""'R,"," Single Fixture Relocated Bldg. (new Ilx. addtl) Water Service Sanitary Sewer It. Storm Sew~r II. Backflow Device Permi! Issuance $10.00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - LAND USF' HANDICAP ACCESS' FLOOD PLAIN: QUAO AREA' , OF BLDG'" · OF UNITS' ZONING' OCCY GROUP' CONSTR. TYPE' , OF STORIES: HEAT SOURC'" LIGHTING POWER BUDGET: WATER HEATER: ,_ SQ. FT. $fSQ. FT. VALUE SQ. FTG MAIN X X X SQ, FTG ACCESf' SQ. FTG OTHER TOTAL VALUE OF PROJECL PLAN CHECK FEF RCPT' DATE ._. BY -:2."7. ?'C/ I:~ , OEMOLlTION I BUILDING PERMIT 15% State .-1:~ Surchar~.e ,." I MECHANICAL I 15% State I Surcharae I PAVING I l PLUMBING I 5% Stat,e Surcharae I FENCE VAIIJE $ I SIDEWALK CURB CUT FT. FT. I SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL 5/.$7 "'lI . REQUIRED INSPECTIONS · It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection ,equested and when you will be ready, for Inspection. Requests received before 7:00 a.m. will be made the same workIng day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavatlon, but prior ,to setu p of forms. UNOERSlAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these inspections have been made and approved. PAVING: After g,avel Is In place but prior to placing asphalt or concrete. x FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire biocklng and bracing are In place and all pi pes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner! Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the BUilding Olvlslon, ATTIC DRAFT STOPS & CURTAIN WAllS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, ali steel in place, but prior to placing concrete. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete Is placed. STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERFlOOR: Plumbing, electrical, mechanical. To be made prior to Installation of' floor Insulation, decking or floor sheathIng. INSULATION &'VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum board interior wall covering Is applied. FIRE & SEPARATION WAll: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.G) UNDERGROUND: Plumbing. electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U.B,C. Standards 43.8. SPECIAL GRADING, EXCAVATION ANO FilLING: During earthwork. (306 a.11 & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. ...\ lATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. GlU.lAM BEAMS: Inspection CertifIcate by an approved agency, fu'rnished to the City's BuildIng DivIsion before beams are placed, (2501 U.B.C. STOS. 25.10,11). STRUCTURAL MASONRY: (306 a.7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base materlal In place. ROOF SHEATHING AND NAiliNG: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. "In addition to the Inspec- tions specified, the Building . Official may make or requIre other Inspections of any construction work to ensure compliance with the Building, City or Development Code. ------------------------------------------------------- FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish inspection. All project conditions such as landscaping', parking lot striping, etc. must be completed before requesting this InspectIon. FINAL PLUMBING K FINAL BUilDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises, FINAL MECHANICAL FINAL FIRE DEPARTMENT AODITIONAl COMMENTS' PLANS REVIEWED BY DAT~ By signature, I state and agree, that I have carefully examined the completed applicatIon and do hereby certify th~t all Information herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify~hat only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensur that all required Inspections are requested at the proper time, that project address Is-readable from the street, that the perml card Is located at the front of the property, and the approved set of plans will remain on the site at all times during constr don. } l ' Slgnatu~ \ (I L1 J?Jtv.AJ.e"L- Datp J- !()r 7~ -ril /' t VALIDATION: AMOUNT RECEIVED: ""3/.:fi>? 72 .yy'~ DATE PAID: ?-/eP -% /7,~. -~- . RECEIPT ': RECEIVEO BY: