Loading...
HomeMy WebLinkAboutMiscellaneous Construction Plan 1985-7-31 or " e e BARGHAUSEN CONSULTING ENGINEERS, INc. "Land Planning, Survey, and Design Specialists" JulY 31, 1985 Mr. Lorne Pleger City of Springfield Building Division 225 North Fifth Street SpringfIeld, Oregon 97477 Re: Proposed AM/PM MIni-Market at 4202 Main Street Our Job No. 1636 Dear Lorne: Please find herewith, three sets of revised construction drawings for the above-referenced proJect. These plans have been revised In accordance with your Initial plan review with the revIsions as fol lows: 1. Sheet C-l. Addition of a second restroom and note regarding the Installation of a stop sign prior to enterIng 42nd Street. 2. Sheet C-2. Addition of a second restroom and revisions to the location of the handicapped ramp. 3. Sheet C-3. Addition of a second restroom and note regarding the Installation of backflow prevention devices. 4. Sheet A-I. Revisions to the floor plan to provide for a second restroom and associated notes In the room finish schedule and door schedule. 5. Sheet A-2. Addition of a second door In elevation D and notes regarding safety glass. 6. Sheet A-3. Revisions to the foundation, roof framing, and roof plan associated with the addition of a second restroom. 6625 South 190th, #102 . Kent. Washington 98032 . (206) 872-5522 "* ..- e e Mr. Lorne Pleger City of SpringfIeld Building Division -2- July 31, 1985 7. Sheet A-6. Revision to the store fixture plan necessitated by the addition of a second restroom. 8. Sheet A-7. Revisions to the reflected ceiling plan necessitated by the addition of the second restroom. 9. Sheet P-l. Revisions to the plumbing layout and water/sewer Isometrics to reflect changes required by the addition of a second restroom. 10. Sheet ME-I. Revisions to the HVAC plan to reflect changes necessitated by the addition of a second restroom and addition of required venting as shown In Section A. 11. Sheet E-l. Addition of the second restroom. 12. Sheet E-3. Revision of the electrical lighting plan necessitated by the addition of the second restroom. 13. Sheet E-4. Revision to the electrical power plan neces- sitated by the addition of a second restroom. We feel that the modification of these plans now adequately addresses the comments made In your Initial plan review and we respectfully request your review of these plans as soon as possible so that a buildIng' permit may be Issued. We appreciate your cooperation In this matter and would ask that If you have any further questions regarding this project, that you would cal I this office. Thank you. Sincerely, l-t(.:b. ., ~ '0 r? H. .Wayne G~~~S~E. Sen lor Eng Ineer HWG/ sm Cl Zl.06 encs: cc: (3) Revised Construction Drawings Mr. James F. Valentini, Atlantic Richfield Company (with one enclosure) Mr. BII I Thurman, Atlantic Richfield Company (with one enclosure) Mr. John Yada, Atlantic Richfield Company (with one enclosure)