Client:
Address:
Springfield School District
525 Mill Street
Springfield, OR 97477
Project No.: 722-80173-223
Proj. Name: Thurston Elementary School
Location: 7345-Thurston Road
Springfield, Oregon
K.R.
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
Date: 1"lJ:>.~~~2009. CCB#176269
B.P. No.: \...A-"
P.O. No.: P0272-334-0809
Cast By: Devon Hovis
j'n ~.lInfOT111,ation
I,r!'!~. .70 Build On
AI!IngIn....w . ~ . n..tIng
COMPRESSION REPORT
Cloudy
Load:
Total:
Supplier:
Knife River
Yardage
1
9
Field Test Data
Slump (In.): ASTM C143 33/4"
Max. Aggr. Size: 3/4"
A.ir Content: ASTM C231 4.7%
A.ir Temperature (F): 730
Material Temp. (F): ASTM Cl064 730
Max Temp (F):
Min Temo IF):
Specimen Size: . 4x8
Unit Weight (pel); ASTM C13B
Time Cast: 10:30 AM Curing Conditions: ASTM
Additives:n -N/Fly V-Mar3 (30-IV)
Results Reported To: Contractor
Placement Data:
Liglll poles - 11 (eleven)
Material: Concrete
Location Sampled At:
Belween roads 2nd south most
Date Cast:
Ticket No.:
3444767
07/22/09
IMiX No.:
2430N170VO
-
Date Rec'd: . 07/23/09
Weather:
Desi!,!n Stren!'!th (psi):
required 3,000
Compressive Strength Data ASTM C39
olaced 3.000
09-1437 7/29/2009
lab Cure Diameter or Cross Sect. Area Cylinder WT. Compo Str.ength Capping Method
Dimensions Max. Load (Ibs.) Fracture Type .., Test Time
(days) (inches) . ('.I,) (Ibs.) (psi)
C617-03 C12Jl-0J
6 4.02 12.69 8.3 30,685 2,420 4 7:35 AM X
Cylinder No. Test Date
09-1438
09-1439
09-1440
8/19/2009
8/19/2009
Hold
I
I
27
27
H
H 1 - Cone (both ends) - 2 - ConeNerticalCracks (one end) 3 - Columnar 4 - Diagonal wino cracking at ends. E; _ Side f'raclures (at top o'fbe .:tom)
Remarks:
cc: KPFF - ugo.costa@kpff.com
Hyland Construction - markb@jhconst.com
Milstead & Associates - angus@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
{) w Top fr",elures (same as #5 but end of cylind~r is pointed)
. Respectfully Submitted,
P~V/, ~(ffr' Industries, Inc.
Raymond AliP~ '
Project Manager
. fillS REPORT IS PROVIDED FOR THE INFORMATION OF mE CLIENT ONL Y. THE REPRODUCTiON OF THIS REPORT BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL, IS
PROHIBITED WITHOUT TtlE WRITTEN
PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES
l"'~;lInformation
",..,. .To Build On
Engineering. Consulting . Testing
~
DAILY FIELD REPORT
Date Performed:
July 30, 2009
Report Number:
722-90102-2
Client:
Matt Keenan
KPr=F Consulting Engineers
1201 Oak Street, Suite 100
Eugene, OR 97401
Project Name:
Thurston Elementary School
Public Improvement 2009
7345 Thurston Road
Springfield, Oregon
e.e-4'5l
Project Location:
PO No.:
Type of Inspection: Site Observation
Weather:
Ciear
Field Observations and Comments
A PSI representative was on site at Thurston Elementary School Public Improvements to perform a proof roll on
driveways off Thurston Road. The proof roll was conducted using a loaded ten-wheeled dump truck approximately
50,000 pounds. There were no deflections or pumping observed under the wheel loads and no wheel tracking on rutting
indicating a firm and stable subgrade at this time. To the best of our knowledge, the work inspected above was in
accordance with the building department approved design drawings, specifications and applicable workmanship
provisions of the International Buildinq Codes.
Inspector: Pete Furlong
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
cc: Springfield School District - Bill Hirsch
John Hyland Construction - Mark BrabHamm
Robertson Sherwood Architects - Dave Guadagni
City of Springfield - Denny Wright
THIS REPORT 1$ PROVIDED FOR THE INFORMA TIQN OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED,
Professional Service Industries, Inc.. 104Q-A Shelley Slreet- Springfield. OR ,97477. Phone 541/746-9649. Fax 541!746-7163
l... ~;l Infonnation
,,~. .To Build On
Engineering' Consulting . Testing
~
DAILY FIELD REPORT
Date Performed:
Client:
July 13, 2009
Matt Keenan
KPFF Consulting Engineers
1201 Oak Street, Suite 100
Eugene, OR 97401
Report Number:
722-90102-1
Project Name:
Thurston Elementary School
Public Improvement.2009
7345 Thurston Road
Springfield, Oregon
Project Location:
~-4~
PO No.:
Type of Inspection: Coring
Weather:
Clear
Field Observations and Comments
A PSI representative was on site at Thurston . Elementary School to do site observation. PSI talked with Mark with
Hyland Construction on the Public Improvement. Mark said that there would be a sidewalk and two (2) curb cuts that
are coming up in the future. Mark said he would call PSI when services are needed. To the best of our knowledge, the
work inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Buildinq Codes.
Inspector: Pete Furlong
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
ii:itIif6:1
Raymond Aliperti
Project Manager
cc: Springfield School District - Bill Hirsch
John Hyland Construction - Mark 'BrabHamm
Robertson Sherwood Architects - Dave.Guadagni
City of Springfield - Denny Wright
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040~A Shelley Slreet . Springfield, OR 97477. Phone 541/746-9649 . Fax 541/746-7163
l.... ~;1 Infonnation
",,,. .To Build On
Engineering. Consulting. Testing
~
P3 10 f 2-
~, . <- - ..
DAILY FIELD REPORT
Date Performed: July 23, 2009 Report Number: 722-80173-222
Client: Springfield School District Project Name: Thurston Elementary School
525 Mill Street
Springfield, OR 97477 Project Location: 7345 Thurston Road
Springfield, Oregon
Building Permit No,: COM2008-00437 P.O. No.: P0272-334-0809
Type of Inspection: Soils Observation Weather: Clear
Field Observations and Comments
Witnessed a proof roll of the driveway on the west side of the building (See Attached Drawing) at finish grade of base'
rock. The proof roll'was performed with a loaded dump truck weighing approximately 50,000 Ibs. Only slight tracking
and no pumping was observed under the wheel loads indicating a firm and stable grade. To the best of our knowledge,
the work inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Building Codes.
Inspector: Steve Wilder
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
/
ond A iperti
Project Manager
Attachment: Site Drawing
cc: KPFF - ugo,costa@kpff.com
Hyland Construction - markb@jhconst.com
Milstead & Associates - angus@milstead,us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane,edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT. THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Ind.ustries, Inc. . 1040~A Shelley Street. Springfield. OR 97477. Phone 541/746-9649. Fax 541(746.7163
,~ _.. i.
---- .--
\\\\ -,' ..' ----;::::..:.. ;-: .:,~~..,.,-:--,--,~~f"-J--~;~.
\11 ...~/",// ~.......-::J ,1'1 1",. ~I
\'~ ~~;:~::..;;,~ . ;:" ;.,. 'iI 0) 0
,'1\ I'~",_, "",,' kM \
" 5- "/1"3k~ '.'.1 "'i "'~ '--~,
I '. ~(/~ _ Ij'-t.t!tll!
~ II( c ~. y/r:;--) l.\ 11.11 r-!iJ.,I\ t/\ .
I \ ~tH"'f',.',-ij"'!"ri-l'::":I' '(Y_t..
: ~~~~,:~.i.JJ
~ ~~~'~~~ ::h> : :.:: ' : ~ ~ _
lIT t-:-:-c-~~~~-' . f~ ,.:';: ~~ s lJ
~ \ ~. tlltl,:j'""J J..--.-:-:-...J.
, - ,".,~, ro--I! ,,,. ; II ',~ .1!hi,;11..1 II i-rtrnf" -I
, " i' ~ <r , I ---, ,1,11'1'1 rl>j ,
. l':n';j. ' , 'I Ii 11", Ilf,l.'II'[ I 11>1
I \', ~~ <r1'.I,'ll"~~".',. ,'tJ..,,: '1
,lioIllUo{ ~ " .r. t .t.';
, f). ~,. . C C ",~ ,,") T :8
~ - .' .1., , 1
,'('"'.'! <r, ' : "lcJ.'Ii.hi'~T.1 :.1" _,
I ',,,.... .~) ',.'. I ~
~ .....1 '"1.11. l'l
I..".'. -'. .... '-, __ r-..., -""" '~ I
RRE L'N" :-.~ ~~. ~g:);yU
~~O("L 7.23-0'1: I '. ~----'t SC_H~OL_,:,_~ r
l . c.' L+J::: \_ I I i I
I i ~\ ;HI:.II.,jJ ," ,I
; ~.~.. .~ .'1.:: ;IA':~JUli~ l ii'
m -~~ ~I~ Ii
I j;=~;+;~~~rj:
l~~? ' "-;,;~ ' ]+~
I /1 ~~""7 . ;:'I'~ .
;. I.~; . .7\, ,..~ ___ ~ ~'
~ lOll=:) .. ~ "!:Il~' 'C' ~ . .
, " i i . ..... . . ~I :. . 4f.. :
SERVICE COURT/ \ "...........;. 07"l ..; '., ~ . L,. _ <<____.
DUMPSTER ENCLOSURE: I' I. ,I>~, " =:::':1-,... .L,!I;.r'~~.:" ~
IRCHITECTURAL DRAWINGS J t['~~ ' ',"",..., ...,'. ~
C-'&L~~~~'~ ~~ ~~it ii l'"~liH,~.t!iq)7~(i!~
IRCHrTECTURAL DRAWINGS l.:" ... ~ . ~ ."~II>l>n)ll\'
mSTING poorrOED-b:' '-~ :~IIII!'~
. . WETLAND l'< J{';;,,:?!
, ! 1
I \,
i ;
/If' ,.j
( . - "
.....-..
1. 2--; .dq
fj 2 c f L
t g - t./-~ 7
l...~ ;ZInjormation
",~. .To Build On
Engineering . Consulting. Testing
.~
DAILY FIELD REPORT
Date Performed:
July 27, 2009
Bill Rhoades
Delta Sand & Gravel
999 Division Ave
Eugene, OR 97404
Report Number:
722-90113-1
Client:
Project Name:
ihurston Bike Shelter
T~'j~~~~y~hOOI
Springfield, Oregon
Project Location:
C8-L\~
PO No.:
Type of Inspection: Soils Observation
Weather:
Clear
Field Observations and Comments
As requested, a representative of PSI was on site to verify pier excavation and embedment into "bar run". Eleven (x11)
piers were excavated to depths ranging from 12 feet to 14 Yz feet below ground surface. Upon our arrival the holes had
been drilled and the delta crew were preparing to drop rebar cages. Visually, the holes appeared to penetrate two (2) to
three (3) feet into the "bar run" material. Depth of excavation from south to north are as follows: 12 Yz (gw), 12' (gw), 12
'%' (gw), 12 Yz' (gw), 12', 12' (gw). 12', 12 Yz', 14 Yz', 12 Yz' (gw) and 13' (gw). (gw) indicates ground water was observed
in the base of excavations. To the best of our knowledge, the work inspected above was In accordance with the
buiiding department approved design drawings, specifications and applicable workmanship provisions of the
.International Buildinq Codes.
Inspector: Anthony Deluca
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
i~:r~L;p?)
Raymond Alipert
Project Manager
cc: City of Springfield
Springfield School District - John Saraceno
John Hyland Construction - Mark Brabham
Robertson Sherwood Architects - Dave Guadagni
KPFF - Matt Keenan .
KPFF - Steve Rodolt
Milstead & Associates - Bill Hirsch
THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMIITAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSJOt'JAL SERVICE INDUSTRIES, 1$ PROHIBITED,
Professional Service Industries, Inc.. 104D-A Shelley Street. Springfield. OR 97477. Phone 541n46-9649 ."Fax 541fi46.7163