HomeMy WebLinkAboutPermit Plumbing 1994-5-26
'.
COMMERCIAL/lNDUSTRIAL SP~'NGP'ELD
PERMIT APPLICATION l~
225 Fifth Street, Springfield, Oregon 97477 .... tit
LOCATION OF PROPOSED WOr;!,';:, 4-\9A Un 0\ ~~t
ASSESSORS MAP' I rru.:h.!Kj
.
JOB NUMBER
440f cfjq
INSPECTION LINE: 726.3769
OFFICE: 726,3759
TAX LOT:
O/c9.CO
OWNER:\AJClJJ ~ \-\ Q ~SLn,L8..Q.L:1t(L RtrlDPHONE: ~, I n"lt'El
ADDRESS: 4\-\9..4 ~l>f\ '-~..) ~
CIT~' '-~J..f'\n.1.'&rG STATE: I KJlQ.Mn) ZIP:~
, ,-' \\~I'I"' L F. ,11 .
DESCRIPTION OF WORKtiLY:l1.LLL"oon ff..... \, Pill
ADDITION )(
NEW
REMODEL
DEMOLISH
OTHER
J JlPLlJ
VALUE:~
PHONE
v
NAME
ADDRESS
ARCHITECT:
CONTRACTOR'S NAME
ADDRESS
CONST,
CO NT RACTO R .
EXPIRES
PHONE
GENER/ I '_ ' , ., -
PLUMBIN~P~~IOrt\h N"\ \\'dC)~'.\\~, ~\?3
MECHANICA" \j \.J
ELECTRICA' '
\ '.14. ,LlC::; 4~4,
'l?'\ta
I PLUMBING
I NO,
1+ Single Fixture
I Relocated Bldg,
Inew lix, addtl)
1 Water Service
II.
I Sanitary Sewer
II.
I Storm Sewer
II.
I Backflow Device
MECHANICAL
FEE C,fV\RGE
L\D~
Nn
000
rucaru:
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
> 100,000 BTUs
-.' ..,'~
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
,~~
Y~I~
,. I:'
I
I
1
I
.I
1 TOTAL PERMIT
Permit Issuance
$10,00
I
"
I
I
I,
,40~,
TOTAL PERMIT
QUAD AREAl> ~e.Jt)(' .J
- OFFICE USE -
LAND USE:~)
HANDICAP ACCESS:
FLOOD PLAIN'
ZONING" C'J2J
. OF BLDGS'
. OF UNIT~'
OCCY GROUP:
. OF STORIE~'
CONSTR. TYpo,
HEAT SOURCE:
LIGHTING POWER BUDGET:
WATER HEATER:
SQ, FT,
$/SQ, FT,
VALUE
SQ, FTG MAIN
SQ, FTG ACCES~
X
X
X
SQ, FTG OTH ER
TOTAL VALUE OF ,PROJECT
PLAN CHECK FF" RCPP DATE BY
I BUILDING PERMIT ' PLUMBING 1~,)p:J , DEMOLITION
! 5% State 5% State I ~, GCJ ~-lfJ}{)
SurcharRe Surcharoe
MECHANICAL FENCE I
VALUE $,
5% State SIDEWALK 1 SUBTOTAL
Surcharoe FT, PERMITS
I PAVING CURBCUT 1 SYSTEMS
FT. , DEVELOPMENT
\ ,c9.()
1 aA()Y~
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
~Idt.\~
. REQUIRED INSPECTIONS .
It Is the responsibility of the permit holder to see that alllnspecllons are made at the proper time, To request an Inspection, call
726,3769 (recorder), state your City designated Job number, job address, type of Inspection requested and when you will be ready
for Inspecllon, Requests received before 7:0\fj,m, will be ma~" ~Q..,~, rklng day, requests made after 7:00 a,m, will be made
the following work day, /" .r-- ~
SITE INSPECTION: To be \ ROUG PLUMBING" PAVING: After gravel is In
made after excavallon, but ELECT CAL & 'place but prior to placing
prior to setup of forms, MECHAN work Is to asphalt or concrete,
be covered until these
Inspections have been made
and approved,
UNDERSLAB PLUMBING,
, ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection,
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Owner! Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
CONCRETE SLAB: To be
made after all Inslab building
service equlpmenl, conduit,
piping, accessories and other
ancillary equIpment Items are
In place but before any
concrete Is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 PS,L (306 a,1)
STRUCTURAL WELDS:
Performed on the Job, (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied,
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations, (306
a,6)
SPRAYED ON
FIREPROOFING: u'B,C,
Standards 43.8,
UNDERFLOOR: Plumbing,
electrical, mechanicaL To be
made prior to Installation of
floor Insulation, decking or
floor sheathing,
FIRE & SEPARATION WALL:
Located and constructed
according to plans,
SPECIAL GRADING,
EXCAVATION AND FILLING:
Ourlng earthwork, (306 a,11 &
Chapter 29)
POST & BEAM: To be made
prior 10 Installation of floor
Insulation, decking or floor
sheathing,
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished,
GLU,LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Olvlslon before
beams are placed, (2501 U,B,C,
STDS, 25,10,11),
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing,
STRUCTURAL MASONRY: (306
a,7)
*In addition to the Inspec-
tions specified, the Building
Official may make or require
CURB AND APPROACH other Inspections of any
ROOF SHEATHING AND APRONS: After forms are construction work to ensure
NAILING: Prior to Installing erected bul prior to placing compliance with the Building,
_~a~~~~~rl~__________~~~et~______________~~~~Deve~m~~~de~_
\L/ FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
\' of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc, must be completed before
FINAL ELECTRICAL requesting this Inspection,
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBe 2415,
SIDEWALK & DRIVEWAY:
RequIred for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material In
place,
FINAL MECHANICAL
FINAL BUILDING: Requested after, the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises .can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
DAT~
By signature, I state and agree, that I have carefUlly examined the completed application and do hereby certify that alllnforrnatlon
herein Is true and correct, and I further certIfy that any and all work performed shall be done In accordance with the Ordlna~ces
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance with ORS 701,055 will be used on Ihis project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the
street, that the permit card Is located at the front of the properly, and the approved set of plans will remain on the site at all
times during construction.
Slgnatur~ ~D~~
AMO~NT RECEIV~: C^lo4, \h--
RECEIPT .' 1~~f)R '
Date
s- 2.0 -CJ4-'
VALIDATION:
DATE PAID: \.1, l\*?_'o ,qq.
RECEIVED BY: ~'
C,.t
JOB NO. ~:J9
.
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
(COMMERCIAL & RESIOENTIAL)
NANE OR CONPANY: ,f d .g,~ r;~
LOCATION: 4/..2 -f ~.,; 5~
DEVELOPNENT TYPE: ~. (.ut,/:/ ~ ;I~~)
BUILDING SIZE: LOT StZE SQ, Ft.
1. STORN DRAINAGE _
- INPERVIOUS SQ, FT. ~
~
X $0.203 PER SQ. FT.
~ />1M )
Y --
2. SANITARY SEWER-CITY
NO. OF PFU'S
, (See R,everse)
5"
X $42.08 PER PFU
(:;/040 )
'- .-/
3. TRANS PORTATI 011
NO OF UNITS X TRIP RATE X COST-PER TRIP
X ~4.31
~
~ X
X $424.31
(( #~)
'-.,/ --
S
S
,-
X 5424.31
4. SANITARY SEWER-NWM~
NO., OF PFU'S 5 x $15.125 PER PFU + $10 MWMC ADM FEE
(Use PFU Total From Item 2 Above)
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
s~
--
s~
TOTAL-MWMC SDC
SUBTOTAL (ADD ITEMS 1,2,3 & 4) S ~
--
5. ADMINISTRA..IVE FEES r
BASE CHAR E BTOTA'-/'fiOrE~ X ~05 c/~/o.s-~
~~ S--~9'~ .,_~
/ ~~' TOTAL SDC S '3~"lrs 2.20.1<-
:/ S~~ Co :?S ----
FIXTURE UNIT,CALCU~ION TABLE: Nlll\lt"'1 01 New r;.t",(.s X Unit Equiv:llent = Fix1lJ1e Units (I~OTE:
For remodels, c.llcul~le only the ~ddl;"lIl;11 "'1"',,:,) ....,
.' r~L'I.'.sEll OF ~ L':~lr FiXTURE
FIXTURE TYPE NEW FIXTURES EOl'l\'i,LEln U:"TS
Bathtub.....,..,..,..,...., ,......",..,..,',..,',..'.. ....'""..,..,....',
Drinking F Ollnlain,......... ....,....", ,."..""..,..,........', ,.."
Floor Drain,.."..,"""""""".""" ',""""""""""""""""
Interceptors For Grease/Oil/Solids/Etc....,..,......,..
Inlerceptors For Sand/I,uto Wash/Elc..,.........,..,..
laund ry Tub /Ootheswa sher.."""",....,...,.. ,......,..,..
Ootheswa~her - 3 Or More............................,........
Mobile Hdme Park Trap (1 Per Trailer)..............,...
Recep!or F9r RelrigeratorfWater Station/Ete.....,..
Receptor For Commercial Sink/Dishwasher/Etc..
Shower, Single,Stall..,....,..,..,....,....,;..............,..,...."
Shower, Gang,..,..................,...."".................,.."...."
S!nk. Bar, COmmercia'-..,..,...,.."""......"....,......,......
, Urinal, Stall(l'lall..,....,...."...."...."..,..,........":,,....,.....
Wash Basin/lavatory, Single..................................
Water Oosel. Public Installation....,.....,....,......,......
Water Ooset, Private..,....,..,....,...."......",......,....,....
Miscellaneous:
"
2
J
3
6
2
6
6
1
3
2
I/Head
2
2
1
6
4
')
TOTJ.,L FIXTURE UNITS
=
~
2
.:)-
CREDIT CALCUL<\TION TABLE: Based on assessed value, If impcovemenls occurred after annexation date in table,
calculate eredhs separates,
Year
Annexed
Rate per S 1,000
Assessed Value
Year
Annexed
1979 or belore
1980
1981
t982
1983
1984
'1985
1986
1987
1988
1939
1990
1991
1992
$3,21
3,13
3,08
2.96
2,82
2,68
2,51
Rate per $1,000
Assessed Value
l
II
,
I
;
i
I
$ 2,24
1.93
1,57
1.18
0,79
0,44
0,28
~
cred~ for Par,eel or Land Only If Applicable
X $ =
(Rate X Assessed Value) /
X $ = ./
(Rate X AssessedVal~:)1 ~
CREDIT TOT./" = $
Impr<?Vement [If alter annexation date)
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
Resident ial...,..,..............,.......................,.......... 0,4
CommerciaL...........,..,..........,....,..........,........, 0.9
Industrial..... ,...... ..,...., ..,.......... ...... .....,..,:..,......, 0,45
GovernmentaL........, ..,.., ........ ..,.. ....' ....,.........., 0.5
IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT